20070523142807.pdfDATE: May 23, 2007 City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 TO: Ken Marques ksmpal@aol.com FROM: Jenny Readwin, Plans E in RE: Plan Check # 2007-0471 Project: Addition/ADU Project Address: 505 2nd Ave N. During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) Please complete the enclose Energy Form Handout. Also, based on form show size and location of proposed whole house fan on the plans. 2) Note garage/dwelling separation on plans for wall between new garage and existing house. Minimum 1/z" sheetrock required on garage side of wall and 5/8" type X on the ceiling when there is habitable space above. 3) R403.1.3 requires all vertical rebar to have a standard hook. Revise all foundation details to . reflect. 4) Provide East elevation view. 5) Provide section detail through the garage/roof deck to show how 2% minimum slope will be achieved and show direction of all roof deck drainage on the roof framing plan. 6) Provide construction/connection detail for roof guardrail. 7) In the gravity calculations I was unable to locate a calculation for the proposed 4x10 garage door header with 18'+ span. Please provide calculation for this header. 8) Per the lateral calculations the shearwall on the left side of the garage is required to be 5' and plans are showing 4'-4 %2". Please revise plans to match calculations or provide revised calculations. 9) Engineer of Record please provide shearwall nailing schedule and clarify holdown to use for TDI which are called out in the calculations and add this information to the plans. Currently no holdowns are shown on the plans. + � 1 .�-k OF 0�0 city of aedmonds development information W est, i8g� Washington State Energy & Ventilation Codes Residential Compliance Worksheets Prescriptive Approach CODES: Edmonds Community Development Code Chapters 19.30 and 19.35 Washington State Energy Code (Current Edition) Washington State Ventilation & Indoor Air Quality Code (Current Edition) The purpose of the State energy code is to provide minimum standards for new or remodeled construction to achieve efficient use and conservation of energy. The code allows flexibility to permit the use of innovative approaches and techniques. This handout however only provides the basic minimum codes for prescriptive compliance. This handout describes the basic prescriptive approach for energy code compliance that is the easiest way to determine or show code compliance. It is a straight takeoff and comparison of total window (glazing) and door opening area versus the heated floor space. The percentage of glazing shown on the enclosed charts determines the U -value of all windows and doors, and the R -value for wall, floor, slab and ceiling insulation. This handout is intended to provide minimum prescriptive compliance and it is not intended as a substitute for the entire State Energy Code. Also included in this packet is a Ventilation and Indoor Air Quality Worksheet. Tighter construction and insulation standards have introduced a vast amount of chemicals and other pollutants into dwellings. The process of natural ventilation has also been greatly reduced due to the required sealing of sheathing at walls and floor levels. The State Ventilation and Indoor Air Quality Code has been created as a means for bringing in fresh outdoor air, and exhausting the interior stale air. The code allows either a manual portal system or a mechanical system that runs unmonitored on a timer to convey the air. Forms and additional information about the State Energy and Ventilation Codes can be found on the WEB at www. energ_y.wsu. edu. PLEASE COMPLETE THE FOLLOWING ATTACHED ENERGY AND VENTILATION WORKSHEETS AND SUBMIT TWO (2) COPIES WITH YOUR BUILDING PERMIT APPLICATION. LATEMPWILDINOHANDOUT ICODES\Handouts Webpage\ENERGY 1326.DOC Revised 3106 OV ED4 O CITY OF EDMONDS ENERGY & VENTILATION RESIDENTIAL COMPLIANCE WORKSHEETS PRESCRIPTIVE APPROACH PLEASE COMPLETE THE FOLLOWING ENERGY AND VENTILATION WORKSHEETS AND SUBMIT TWO (2) COPIES WITH YOUR BUILDING PERMIT APPLICATION. DATE PROPERTY ADDRESS PROPERTY OWNER JOB TYPE (check all that apply) ❑ New ❑ Single Family ❑ Addition ❑ Remodel ❑ Multi -Family # Units HEATED FLOOR AREA Existing New Total HEATING BY ❑ Gas ❑ Electric ❑ Other SYSTEM TYPE ❑ Forced Air Furnace ❑ Wall heaters ❑ Other. Hydronic: Infloor ❑ Radiant ❑ FOR CITY USE ONLY PLAN REVIEW # DATE OF REVIEW, MAXIMUM GLAZING % COMPLIANCE OPTION WHOLE HOUSE VENTILATION SYSTEM TYPE: MANUAL PORT/WINDOW VENT WITH EXHAUST FAN INTEGRATED FORCED -AIR FURNACE COMMENTS: 1 L:ITEMPIBUILDINGIHANDOUT ICODES\Handouts Webpage\ENERGY B26.DOC Last Date Revised: 5/23/2007 Zone l 2004 WSEC Chapter 6 Qualification Form- Residential Prescriptive (Chapter 6) Options for All Heat'Sources Instructions: Carefully review the requirements for each of the options below. Choose an option that best suits your dwelling design. Glazing percentage typically determines which option to choose. Your building must match the selected option requirements without exceptions or substitutions. Disregard components or equipment that does not apply to your project. Your permit will be processed more efficiently if you provide all of the requested information. Department staff can help you with general questions about this form. Proposed designs which cannot meet the specific requirements of a listed option above may calculate compliance by Chapters 4 or 5 of the 2003 Washington State Energy Code. Forms can be found on the WEB at WWW.ENERGY.WSU.EDU Option Glazing Glazin U -Factor y Wal] Wall 'Vertical Overhead�a (circle Area: io Door Ceiling2 Vaulted Wall Above (interior) a (exterior)4 Floors Slab on 6 a Grade 12 below Grade one) % of floor below grade ode I 12% 0.35 0.58 0.20 R-38 R-30 R-15 R-15 R-10 R-30 R-10 H* 15% 0.40 0.58 0.20 R-38 R-30 R-21 R-21 R -I0 R-30 R-10 25% Group R-1 R-381 R-301 R-21 1 R-301 IE 0.40 0.58 0.20 R-15 R-10 R-10 Occupancy U=0.031 U-0.034 U-0.060 U=0.029 Only Unlimited Group R-3 IV Occupancy 0.40 0.58 0.20 R-38 R-30 R-21 R-21 R-10 R-30 R-10 On Unlimited V Group R-1 0.35 0.58 0.20 R-38 / R-301 R-21 / R-15 R-10 R-30 / R-10 Occupancy U -0.03I U-0.034 U-0.060 U-0.029 Only *Reference Case ° Nominal R -values are for wood frame assemblies only or assemblies built in accordance with Section 601.1. Minimum requirements for each option listed. For example, if a proposed design has a glazing ratio to the conditioned floor area of 13%, it shall comply with all of the requirements of the 15% glazing option (or higher). Proposed designs which cannot meet the specific requirements of a listed option above may calculate compliance by Chapters 4 or 5 of this Code. 2 Requirement applies to all ceilings except single rafter or joist vaulted ceilings. `Adv' denotes advanced Framed Ceiling. 3 Requirement applies only to single rafter or joist vaulted ceilings. a Below grade walls shall be insulated wither on the exterior to a minimum level of R-10, or on the interior to the same level as walls above grade. Exterior insulation installed on below grade walls shall be a water resistant material, manufactured for its intended use, and installed according to the manufacturer's specifications. See Section 602.2. 5 Floors over crawl spaces or exposed ambient air conditions. 6 Required slab perimeter insulation shall be a water resistant material, manufactured for its intended use, and installed according to manufacturer's specifications. See Section 602.4. 7 Int. denotes standard framing 16 inches on center with headers insulated with a minimum of R-5 insulation. s This wall insulation requirement denotes R-19 wall cavity insulation plus R-5 foam sheathing. 9 Doors, including all fire doors, shall be assigned default U -factors from Table 10-6C. 10 Where a maximum glazing area is listed, the total glazing area (combined vertical plus overhead) as a percent of gross conditioned floor area shall be less than or equal to that value. Overhead glazing with U -factor of U=0.40 or less is not included in glazing limitations. Overhead glazing shall have U -factors determined in accordance with NFRC 100 or as specified in Section 502.1.5. 12 Log and solid timber walls with a minimum average thickness of 3.5" are exempt from this insulation requirement. This project will take advantage of the following exceptions to the prescriptive option: ❑ 602.6 Exception 1. One door, that is 24 sq ft or less, that does not meet the standards is allowed. Location of door taking this exemption: ❑ 602.6 Exception 2. Doors with a U -factor of 0.40 allowed without calculations, Option IV only. Location of door(s) taking this exemption: L:ITEMPIBUILDINGIHANDOUT ICODES\Handouts WebpageTNERGY 1326.130C Last Date Revised: 5/23/2007 VAPOR BARRIERS shall be installed toward the warm surface as represented below (select one): Floors: Kraft Faced Unfaced insulation with Plywood Sheathing bats: insulation ❑ polyethylene (4 mil) ❑ (Exposure 1 or exterior grade) ❑ Walls: Face stapled Unfaced insulation with batt insulation ❑ polyethylene (4 mil) ❑ Vapor Retarding Paint ❑ Ceilings*: Face stapled Unfaced insulation with batt insulation ❑ polyethylene (4 nail } ❑ Vapor Retarding Paint ❑ *NO'T'E: Vapor Barrier not required where ventilation space averages 12" or greater above the insulation SLAB INSULATION shall be R-10 minimum and be located on the: ❑ Exterior ❑ Interior SLAB INSULATION EXAMPLES NOT CONSTRUCTION DETAILS Floating Slab with Interior Insulation Silicone Caulk Seal 9 1 "_� 4" Concrete Slab 11111 !1111=IIIIIl1111===�== 11111=_ =11111- 1111. 11111=111[1-=_ _ Vl1=IIVI=—=11111—� 6 mil poly =VIII-= IIIV11111`==_==—IIIIl=11111=1 =111!1 11111=11111=-__>= =11111=11111-_=11 — 11111=1111lIf111'-`' I -11111=!1111=111 4"GravelBase 11111=J1V1 =_ __ 111E=1 =11111=Iflll= IIl= I 11111=I_=IIIII� =a _:_:_ _ ____ R-10 Insulation 11111=II111-11111=11111= 24" minimum or to frostline Floating Slab on Grade w/Interior Slab Insulation A INN Silicone Caulk Seal Thermal Break 4" Concrete Slab Floating Slab with Exterior Insulation Flashing/Protection Silicone Caulk Seal 4" Concrete Slab Thermal Break ==1111I -If�-17 'I f_ I6milpoly =11111-IIIII ><=11111=11111111111111111111 =11111=11111r<r>=ll Diii=11111=11111=11111 III11=1 —IIIII=11111-=1111& ID➢11111— I_=11111=11111- II=1 =11!11- 11111= _1111 11111T111ii R-10 Insulation 11111-11111-11111-11111- 24" minimum Below Grade Wall with. Interior Insulation Damp Proofing 11111=11111 6 mil poly ==VIII -11€E — — — 1111E=11 `ryx��Illll11=11111_111!1-1TITI_ II=-�--�---•-• 11111=11111=11111=11!11— R-10 Insulation =11111=11111=III€f=:nN>nr 1il11 — III_fl�ll_II�II_IITI<`ri~yy< VIII- wr 11111-1111!-11111=11111=11111 24" minimum _1111111111=lull= =11111-IIIII_Illil-11111=11111- hill-hill-hill=11111 r — =11111=11111 - VIII-11111-Illll-11111 — -- - - lull=11111=111 ` - r>11=1111!—illll=l I� _III— —11111_IIIII - _ III �� — -11111-11111=11111= �IIII—IIIN Illi!=11111=illll=11111= =VIII—�u=v-�V- V I I I -lTM ITIM 1TIT _TJI = L:ITEMPIBU1LDlNGIHAND0UT ICODESIHandouts WebpagelENERGY B26.DOC Last Date Revised: 5/23/2007 HEATED BASEMENT Silicone Caulk Seal 4" Concrete Slab IIIN ` 6 mil poly Thermal Break VENTILATION WORKSHEET SOURCE SPECIFIC VENTILATION: Exhaust fans are required in each kitchen, bathroom, laundry room, indoor swimming pool, spa, and other room(s) where excess water vapor or cooking odor is produced. Complete the following table: Location Required, CFM ActuAUCFM -' KITCHEN FAN 100 CFM BATHROOM #1 FAN 50 CFM BATHROOM #2 FAN 50 CFM BATHROOM #3 FAN 50 CFM LAUNDRY FAN 50 CFM WHOLE HOUSE VENTILATION: Each dwelling unit shall be equipped with a whole house ventilation system supplying outdoor air to all habitable rooms and exhausting stale air out via a designated fan. Complete the following questions and table: ❑ Not applicable for additions less than 500 sq.ft. SELECT TYPE OF WHOLE HOUSE VENTILATION SYSTEM TO BE USED: ❑ Exhaust fan system with ducted forced air heating system (VIAQ 303.4.1): • Exhaust fan sized per table below with 24 hour timer. • Forced air heating system ducted to all habitable rooms. • Interior doors undercut %2" minimum above floor covering. Exhaust fan system with fresh air inlets (VIAQ 303.4.1): • Exhaust fan sized per table below with 24 hour timer. • Manual through -wall port or approved window vent. ❑ Integrated with forced air furnace System (VIAQ 303.4.2): • Outdoor air inlet duct sized per table 3-5 connected to the return air plenum of the forced air system. • Volume damper. ❑ Supply fan system (VIAQ 303.4.3): • Distribute air through the forced -air system ducts or through dedicated ducts to each habitable space with 24 hour timer. • Outdoor air must be filtered • Outdoor air inlet connected to supply or return. • Back draft and volume dampers. ❑ Heat recovery system (VIAQ 303.4.4) LATEMPWILDINGWANDOUT ICODESViandouts WebpagelENERGY S26.DOC Last Date Revised: 5/23/2007 A WHOLE HOUSE EXHAUST FAN MUST BE PROVIDED FOR EACH DWELLING UNIT. Floor Area Bedrooms* (square feet) 2 or less 3 4 5 6 Min. Max. Min. Max. Min. Max. Min. Max. Min. I.Max. <500 50 75 65 98 80 120 95 143 110 165 501-1000 55 83 70 105 85 128 100 150 115 173 1001-1500 60 90 75 113 90 135 105 158 120 180 1501-2000 65 98 80 120 95 143 110 165 125 188 2001-2500 70 105 85 128 100 150 115 173 130 195 2501-3000 75 113 90 135 105 158 120 180 135 203 3001-3500 80 120 95 143 110 165 125 188 140 210 3501-4000 85 128 100 150 115 173 130 195 143 218 4001-5000 95 143 110 165 125 188 140 210 155 233 *for more than 6 bedrooms and/or over 5000 square feet see Table 3-2 Washington State Ventilation and Indoor Air Quality Code. Total Floor area: Bedrooms: Whole House Fan Size: Location: ✓ WHOLE HOUSE EXHAUST FAN WILL OPERATE INTERMITTENTLY? Yes ❑ No ❑ Both automatic and manual control needed. Automatic control timer shall be set to operate whole house fan for a minimum of eight hours per day. ✓ WHOLE HOUSE EXHAUST FAN ALSO SERVES AS A BATH OR LAUNDRY FAN? Yes ❑ No ❑ The capacity shall be the larger CFM requirement. ✓ WHOLE HOUSE EXHAUST FAN WILL OPERATE CONTINUOUSLY? Yes ❑ No ❑ Note: Installers shall provide the manufacturer's installation, operating instructions, and a whole house ventilation system operation description. A label shall be affixed to the whole house timer control that reads "Whole House Ventilation (see operating instructions). " L:ITEMPIBUILDINGWANDOUT ICODESIHandouts WebpagelENERGY B26.DOC Last Date Revised: 5/23/2007 ak Eng City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION Esr g90 (425) 771-0220 DATE: May 23, 2007 TO: Ken Marques Ksmpal@aol.com FROM: Jenny Readwin, Plans Examiner RE: Plan Check # 2007-0471 Project: Addition/ADU Project Address: 505 2" a Ave N. During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) Please complete the enclose Energy Form Handout. Also, based on form show size and location of proposed whole house fan on the plans. 2) Note garage/dwelling separation on plans for wall between new garage and existing house. Minimum %2" sheetrock required on garage side of wall and 5/8" type X on the ceiling when there is habitable space above. 3) R403.1.3 requires all vertical rebar to have a standard hook. Revise all foundation details to reflect. 4) Provide East elevation view. 5) Provide section detail through the garage/roof deck to show how 2% minimum slope will be achieved and show direction of all roof deck drainage on the roof framing plan. 6) Provide construction/connection detail for roof guardrail. 7) In the gravity calculations T was unable to locate a calculation for the proposed 4x10 garage door header with 18'+ span. Please provide calculation for this header. 8) Per the lateral calculations the shearwall on the left side of the garage is required to be 5' and plans are showing 4'-4 %2". Please revise plans to match calculations or provide revised calculations. 9) Engineer of Record please provide shearwall nailing schedule and clarify holdown to use for TD which are called out in the calculations and add this information to the plans. Currently no holdowns are shown on the plans.