DATE: June 1, 2007
TO: Torn Estep
tomestep@aol.com
FROM: Jenny Readwin, Plans E amine
RE: Plan Check # 2007-0352
Project: Lewis Addition
Project Address: 8809 Olympic View Drive
During re -review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised
plans/documents (affected sheets only) with a written response to each of the items below to a
Permit Coordinator.
1) ok
2) ok
3) 6/1/07 Still need. Provide letter from Geologist/Geotech of Record stating that they have
reviewed the plans and that they are consistent with the report recommendations.
4) 6/1/07 Still need. Special inspections are required for the following. Complete the enclosed
special inspection agreement signed by the owner, the general contractor and the special
inspector and submit to the City for approval prior to issuance.
• Soil Bearing Verification
• Pin pile installation including pile cap
• Temporary and final erosion control
5) ok
The project at —6 ZS C] U1 M nNQ c. V issued under building permit
number 2.Di3" 350 requires.speciial inspection and/or testing per IBC Chapter 17. The
co;wete list of special inspections is attacher] to this document.
BEFORE A PERIMT CAN BE ISSUED: The owner and contractor and special inspector shall complete
this agreement and the attached structural test(s) and inspections schedule including the required
acknowledgements.
APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building
Official prior to performing any duties or inspections. Each special inspector shall submit Statement of
Qualifications to the Building Official for review. Special inspectors shall display identification when
performing special inspections on site. Special inspection and testing shall meet the minimum requirements
of IBC Chapter 17 and the following:
A. Duties and Responsibilities of the Special Inspector
1. Observe Work
The special inspector shall observe the site work for conformance with the approved (stamped) plans
and specifications and applicable workmanship provisions of the IBC. -Architect or Engineer
reviewed shop drawings may be used only as an aid to inspection. Special Inspections are to be
performed on a continuous basis --meaning that the special inspector is on site at all times observing
the work requiring special inspection. Periodic inspections, if any, must have prior approval by the
City based on a separate written plan reviewed and approved by the Building Official and the
engineer or architect of record.
2. Report Non -conforming Items
The special inspector shall bring non -conforming items to the immediate attention of the contractor
and note all such items in the daily field report. Any item not resolved in a timely manner shall be
immediate cause of the special inspector to notify the Building Official of the plan deviation, error,
change or omission. It shall also be the duty of the special inspector to promptly notify the engineer
or architect.
3. 'Complete Daily Reports
Each special inspector shall complete and sign both the special inspection record and the daily report
form for each day's inspection. These records shall remain at the jobsite with the contractor for
.review by the City Building Inspector.
4. Furnish Weekly Reports
The special inspector or inspection agency shall furnish the City with weekly reports of tests and
inspections. The project engineer or architect, and others as designated shall also be copied on
reports. Weekly reports must include the following:
• Description of daily inspections and tests made with applicable locations
List of all non -conforming items
• Report on status of non -conforming items (resolved or unresolved)
• Itemized changes authorized by the Architect, Engineer and City if not included in non-
conformance items.
5. Furnish Final Construction Report
The special inspector or inspection agency shall submit a final signed report to the City stating that
all items requiring special inspection and testing were fulfilled and reported. And, to the best of
L_1TEMPIBUILDING1SpeciallnspectionAgreementIBC.doc 7/04
his/her knowledge the project is in conformance with the approved pians and specifications,
approved change orders and the applicable workmanship provisions of the IBC. Items not in
conformance or unresolved items or any discrepancies in inspection coverage, (i.e., missed
inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically
itemized in this report..
B. Contractor Responsibilities
W I. Notify the Special Inspector
It is the duty of the contractor to notify the special inspector when work is ready for special
inspection. Note, the items listed on the attached schedule and as noted on the approved plans and
specifications are required to have special inspections. Adequate notice shall be provided by the
contractor so that the special inspector has time to become familiar with the project.
2. Provide Access to Approved Plans
The contractor is responsible for providing the special inspector access to approved plans atthe
jobsite.
3. Retain Special Inspection Records
The contractor is responsible to retain at the jobsite all special inspection records submitted by the
special inspector. These records are to be provided to the City building inspector upon request.
C. City of Edmonds Building Department Responsibilities
I. Approve special inspectors or inspection agencies
The building department shall approve all special inspectors and special inspection requirements.
2. Monitor special inspection and approve weekly reports
Work requiring special inspection and the performance of special inspectors shall be monitored by
the City Building Inspector. His/Her approval must be obtained prior to placement of concrete or
other similar activities in addition to that of the special inspector.
3. Issue Certificate of Occupancy
The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports
including the final report have been submitted and accepted.
D. _Owner Responsibilities
The project owner or the engineer or architect of record acting as the owner's agent shall fund
special inspection services.
E. Enineer or Architect of Record Responsibilities
The engineer or architect of record shall include special inspection requirements on the plans and
specifications.
ACKNOWLEDGEMENTS
X have read and agree to comply with the terms and conditions o, f this agreement.
Owner Date
Special Inspector Date
General Contractor Date
City Building Official
L:1TEMt'1BU1LDING1SpeciallnspectionAgreemenfiBC.doe 71114
Date
SPECIAL INSPECTION AND TESTING SCHEDULE
92 -..
exaAcrt:AW _ �u¢narut ttrt+c?
" " �nrr_orsP>:atr►tttrsrt:Ct�ne
REINFORCED CONCRETE, GUNiTE, GROUT AND -MORTAR: STRUCTURAI, STEEUWELI3ING:
Concrete Ganite cunt 1► Mur — sample aad3cst dist specifu st�emrvcis below) .
aSlepte Tests —Shop Materiat7dentiFtcation
Rcinfortaa Tuts ^ Welding laspoctiou .'D Shop D Field
Mix ii�sigrts - U4tri.9onia Inspection []shop o neld
Reinforcing Placaacut — Higb ssrcngth Bolting
Batch Plant Inspection Iospe cdan D Sbop 0 Field
inspect Placing D A3?S D x CI F
Cast samples D A49p
Pick-up Samples — Metal Deck Welding Inspection
Compression Tests Reinforcing Sift] Welding Inspection i
Form completed by: Title:
Tclepbonu Na" Date.
— Mcial Stud Welding Inspe -don
PRECAST/PRESTRESSED CONCRETE:
Concrete Insert Welding Iaspection
Piles past -Tens Pre-Tr>ss Cladding
7fggrcgdttTesis
FIREPROOFING.
Reinforcing Tests
__._ Placarmw Inspection
Tendon Tests
_ Density Tcsu
Miz Dcsiens
- Thickness Tests
Reinforcing Placement
..Inspect Batching
insert Placement
Concreu Batching
INSULATING CONCRE+ ice:
ConcrctePlacement
Sample and Test
Ins[aaliation inion
— Placrment Itnspcetioir
Cast Samples
— Unit Weights
Pick-tep Samples
Compressioa Tcsu
FILL MATERi:4 L:
MASONRY:
— Acceptance Tests
Placcmcat Inspection
— Special Inspection Stresses Used
_ Fuld Density.
— Preliminary Acceptance Tcus (Masoruv Units. V411 Prisms}
— Subsequent Tests (Mortar. Grout. Field Wall Prisms)
STRUCTURAL WOOD:
— Placement Inspection of Units
_ Shear WallNziling Inspection.
—. Inspection of Gl"arrr Fab.
___. Inspection ofTms Joist Fab.
ADDITIONAL. INSTRUCTIONS OR OTHER TFSTS
—Sample and TW CornPoncnts
Form completed by: Title:
Tclepbonu Na" Date.