20070620081818.pdfoV Eno City of Edmonds �yka PLAN REVIEW COMMENTS BUILDING DIVISION �Sr, ts9� (425) 771-0220 DATE: June 20, 2007 TO: Rick Scheuer rick@scheuerbuilding.com FROM: Jenny Readwin, Plans Ex in RE: Plan Check # 2007-0477 Project: Reeves Remodel Project Address: 717 15th Street SW During re -review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) Plans do not match calculations. Please revise plans to reflect all requirements from Engineer of Record (i.e. new 4x10 beam -section 4, verify double 2x10 connected to cantilevered double 2x10- with hanger, etc.). 2) Special inspections are required for the following. Complete the enclosed special inspection agreement signed by the owner, the general contractor and the special inspector and submit to the City for approval prior to issuance. Special Inspection must either be a Washington State Licensed Professional Engineer or a WABO certified inspector (www.wabo.org Special Inspections/Agency) a Expansion Anchors • Epoxy Holdowns CITY OF EDMONDS SPECIAL INSPECTION AND TESTING AGREEMENT The project at ::I/ I 16ft, 6t issued under building permit number ZM7 M/1 requires special inspection anchor testing per IBC Chapter 17. The complete list of special inspections is attached to this document. BEFORE A PERIVIIT CAN BE ISSUED: The owner and contractor and special inspector shall complete this agreement and the attached structural test(s) and inspections schedule including the required acknowledgements. APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building Official prior to performing any duties or inspections. Each special inspector shall submit Statement of Qualifications to the Building Official for review. Special inspectors shall display identification when performing special inspections on site. Special inspection and testing shall meet the minimum requirements of IBC Chapter 17 and the following: A. Duties and Responsibilities of the Special Inspector 1. Observe Work The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC. Architect or Engineer reviewed shop drawings may be used only as an aid to inspection. Special Inspections are to be performed on a continuous basis—meaning that the special inspector is on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval by the City based on a separate written plan reviewed and approved by the Building Official and the engineer or architect of record 2. Report Non -conforming Items The special inspector shall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report. Any item not resolved in a timely manner shall be immediate cause of the special inspector to notify the Building Official of the plan deviation, error, change or omission. It shall also be the duty of the special inspector to promptly notify the engineer or architect. 3. Complete Daily Reports Each special inspector shall complete and sign both the special inspection record and the daily report form for each day's inspection. These records shall remain at the jobsite with the contractor for review by the City Building Inspector. 4. Furnish Weekly Reports The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports must include the following: • Description of daily inspections and tests made with applicable locations • List of all non -conforming items 0 Report on status of non -conforming items (resolved or unresolved) • Itemized changes authorized by the Architect, Engineer and City if not included in non- conformance items. S. Furnish Final Construction Report The special inspector or inspection agency shall submit a finial signed report to the City stating that all items requiring special inspection and testing were fulfilled and reported. And, to the best of 1.:ITbMP1BUILDING15peciallnspectionAgreementIBC.doc 7104 r his/her knowledge the project is in conformance with the approved plans and specifications, approved change orders and the applicable workmanship provisions of the IBC. Items not in conformance or unresolved items or any discrepancies in inspection coverage, (i.e., missed inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically itemized in this report. B. Contractor Responsibilities 1. Notify the Special Inspector It is the duty of the contractor to notify the special inspector when work is ready for special inspection. Note, the items listed on the attached schedule and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. 2. Provide Access to Approved Plans The contractor is responsible for providing the special inspector access to approved plans at -the jobsite. 3. Retain Special Inspection Records The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City building inspector upon request. C. City of Edmonds Building Department Responsibilities 1. Approve special inspectors or inspection agencies The building department shall approve all special inspectors and special inspection requirements. 2. Monitor special inspection and approve weekly reports Work requiring special inspection and the performance of special inspectors shall be monitored by the City Building Inspector. His/Her approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. Issue Certificate of Occupancy The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports including the final report have been submitted and accepted. D. Owner Responsibilities The project owner or the engineer or architect of record acting as the owner's agent shall fund special inspection services. E. Engineer or Architect of Record Responsibilities The engineer or architect of record shall include special inspection requirements on the plans and specifications. ACKNOWLEDGEMENTS .I have read and agree to comply with the terms and conditions of this agreement. Owner Special Inspector General Contractor City Building Official L:ITEMPI13UILDING1SpeciallnspectionAgreementiBC.doc .7104 Date Date Date Date J SPECIAL INSPECTION AND TESTING SCHEDULE 7_' a* MO;EcfNAW BtrQnttaG; ttustrwR !-7 �- MOJFCr ADDRESS - wtr rc�ra.sPEp/�t tTist'EL7p;t REINFORCED CONCRETE, GUNITE, GROUT AND MORTAR: STRUCTURAL STEELNVELDING_ Concrete Gnnite Grum Mortar — Sample and Test (list specific memb s below) Aggregate Tests — Shop Material Identification Reinfarcing Tests — Welding Inspection 0 Shop D Field Mix Designs _.__ Ultrasonic Inspection O Shop D Field Reinforcing Plapement — High-suength Bolting $itch Plant Inspection Inspection Q Shop 0 Field inspect Placing ' D A325 Cast Samples DA490 ON ❑ ❑ F Pick-up Samples _ Metal Dcck Welding Inspottion Compression Tests — Reinforcing Steel Welding inspection _ Metal Stud Welding Inspection PRECAST/PRESTRESSED CONCRETE: — Conctetc Insert Welding Inspection Pies Post -Tens Pre -Tess Cladding Aggregate Tests FIREPROOFING: Reinforcing Tests ^ Placement Inspection Tendon Tests — Density Texts Mix Desicns - Thickness Tests Reinforcing Placement — Inspect Batching Insert Placement Concrete Batching INSULATING CONCRETE: Concrete Placement — Sample and Test Installation Inacpction — Placement Inspection Cast Samples — Unit Weights Pick-up Samples Compression Tests FILLMATERIAL: — Acceptance Tuts MASONRY: — Placement Inspection — Special Inspection Stresses Used — Field Density Preliminary Acceptance Tests (Masonry Units. Wall Prisms) ' — Subsequent Tests (Mona:. Groat. Feld Wall Prisms) STRUCTURAL WOOD: — Placement Inspection of knits — Shear Wall Nailing Inspection. — Inspection of Glu -lam Fab. — Inspection ofTruss Joist Fab" ADDITIONAL INSTRUCTIONS OR OTHER TESTS — Sample and Test Components AND INSPECTIONS: Form completed by: Title - Telephone itle:Telephone No.: Date-.