20070684 Columbia Rim _4_.pdf
City of Edmonds
TH
121 5 AVENUE NORTH EDMONDS, WA 98020 (425) 771-0220 FAX(425) 771-0221
Website: www.ci.edmonds.wa.us
DEVELOPMENT SERVICES DEPARTMENT
Planning Building Engineering
Plan Review Corrections
# bld20070684 May 28, 2008
Application : Date:
th
Columbia Rim / 8128 240 St SW
Project Name/Address:
Al Ostman / e-mail: ajo@columbiarim.com
Contact Person/Address, Fax or E-mail:
Reviewer: Jeanie McConnellDivision:Engineering
During review of the above noted application, it was found that the following information, corrections, or
clarifications are needed. Please redline plans or submit three (3) sets of revised plans/documents with a
written response to each of the items below to Theresa Umbaugh.
st
1 Review - 9/19/07
nd
2 Review 2/6/08
rd
3 Review 4/20/08
th
4 Review 5/28/08
GENERAL
1.ok
2.ok
3.ok
4.ok
5.Storm Water Review Comments regarding Sheet 7 Biofiltration Swale
a.Callout minimum depth. A minimum of 1 freeboard must be provided above the 100 year or at
least 1.17.
b.The sides of the swale are to be sloped at 3:1 which is called out on the detail. However, a
dimension of 3 from center of swale to the top of slope has been shown and the bottom of the swale
is shown to be 2 in width. This only allows for a 2:1 slope on the swale. Please revise accordingly.
c.Please provide a cross section consistent with the biofiltration swale to be constructed.
d.Please refer to attached standard detail for more information.
6.A performance bond for right-of-way improvements is required in the amount of $65,306.39. Bond forms
can be obtained from Theresa Umbaugh.
Please contact me at 425-771-0220 or by e-mail at mcconnell@ci.edmonds.wa.us if you have specific
questions regarding these plan corrections.
1 of 1
DATE E-MAILED 5/28/08 PAGE