Loading...
20070695 Launceford Add.3.doc City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Plan Review Corrections Application : Date: # bld20070695 June 11, 2008 Project Name/Address: Launceford / 18703 Soundview Pl Contact Person/Address/Fax/e-mail: Phil Kallsen / e-mail: Phil@kallsenarchitecture.com Reviewer: JoAnne ZulaufDivision:Engineering During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to a Permit Coordinator. 1.Any approach to storm water management other than tying in to City storm system must be discussed and approved by our Storm Water Engineer, Don Fiene. Please have your Engineer contact Don Fiene as soon as possible to discuss whether infiltration is a viable option at this location. He can be reached at 425-771- 0220 x-1323 or fiene@ci.edmonds.wa.us. Per the Edmonds Community Development Code Section 18.30.060, any new development or redevelopment with more than 2,000 square feet of new impervious surfacing shall be required to provide storm water quality control. The impervious surface calculations noted on the plans indicate the new impervious area to be 2465sf and therefore you will be required to install an on-site storm detention system. Please refer to City handout #E72 available on the City website at www.ci.edmonds.wa.us under o Development Services Department then Engineering. 06/11/08 STILL NOT DONE. ALL IMPERVIOUS SURFACE NEW AFTER 1977 MUST BE o NOTED AS SUCH AND INCLUDED IN THE CALCULATIONS FOR DETENTION AS DESCRIBED IN THE ABOVE MENTIONED HANDOUT #E72. 3/17/08 Not done. The new stamped concrete pavement shall be included in the new impervious surface o area calculations. Also need to include all impervious surface added after 1977 which City records indicate includes sports court and 1997 two story addition. Plans can not be reviewed until the impervious surface corrections are made. If the new impervious area exceeds 5000sf the storm detention system will need to be designed and o stamped by a licensed engineer. Design and calcs will need to be submitted to the City for review by our Storm Water Program Manager, Blaine Chesterfield. If Infiltration viable per Don Fiene as noted above; plans need at minimum the following to be reviewed: 06/11/08 STILL NOT DONE. AS NOTED ABOVE, ALL IMPERVIOUS SURFACE NEW AFTER o 1977 MUST BE INCLUDED. ALSO EAVES MUST BE INCLUDED IN ADDITION. MY ROUGH CALCULATIONS FOR THIS TOTAL IS 4064SF. DATE E-MAILED 6/11/08 PAGE(s) 1 of 2 THIS TOTAL WAS CALCULATED AS FOLLOWS: 1997 Addition: 441sf Proposed Addition with eaves: 1749sf Proposed Asphalt Patio including sidewalk: 1670sf Proposed Addition to Driveway 204sf I BELIEVE THE SPORTS COURT WAS PUT IN AFTER 1977 AS WELL SO ALSO SHOULD BE ADDED TO THIS AMOUNT. PLEASE REVIEW OUR #E72 HANDOUT REGARDING DRAINAGE REQUIREMENTS IF YOU CONTINUE TO HAVE QUESTIONS ABOUT THIS. PLEASE RESUBMIT INFILTRATION REPORT USING THE CORRECT AMOUNT OF IMPERVIOUS SURFACE TO BE HANDLED. Submitted Infiltration report needs to specifically address the amount of new impervious surface that the o system is to be handling. Infiltration detail does not match the system shown on the drainage site plan. Please show correct o detail to match system proposed. Provided invert elevation for outflow catch basin is 106’ but topo at that point is 104’. Please correct o invert elevation or show grading changes. DONE. o DONE. o 2.Done. 3.DONE. 06/11/08 STILL NOT DONE. 4.3/17/08 Not done. Please show the location of the existing water service line from the meter to the house. 06/11/08 STILL NOT DONE. 5. 3/17/08 Not done. Please show the location of the existing sanitary side sewer from the property line to the house. New Comments as of 3/17/08 regarding additions to plan: 6.DONE. DONE 7.. 6/11/08 NOT DONE. 8. Please indicate top and toe elevations of new brick garden wall added around the sport court at ends, corner and every 2 ft of change. 6/11/08 STILL NEED TOE ELEVATIONS. 9. Indicate top and toe elevations of new retaining wall and provide drainage detail from geotech. 6/11/08 NOT DONE. 10. Please note on site plan area north of “planting area” between new stairs and existing deck at north side of house is as grass, concrete, decking or some other surface. If impervious surface then square footage must also be added to impervious area calculations. Please contact me at 425-771-0220 or by e-mail at zulauf@ci.edmonds.wa.us if you have specific questions regarding these plan corrections. DATE E-MAILED 6/11/08 PAGE(s) 2 of 2