Loading...
20070695 Launceford Add.4.doc Jared, I am waiting for Don Fiene to complete the review of the Storm Drainage Calculations. The only comments I have are that the water service line and the side sewer line are not added to the site plan. As the water and sewer mains both run along Sound View I am concerned about the elevations and how they will be crossed by the added storm drain line to or from the infiltration system. We do not have any asbuilts in our files for either water or sewer for this property unfortunately. At very least by locating the water meter and sewer clean out at property line and making an assumption about where those enter the house, you can redline the site plan. Then, unless they both run under the driveway which is doubtful, I would like a note added to the drainage plan regarding keeping the 12" minimum separation between water/sewer and the storm drain line and if unable to avoid then appropriate sleeving of pipes will be placed etc.. Just in case, I would wait to hear from Don regarding any changes necessary to the calculations before worrying about coming in and redlining. Hopefully he will be able to get to this project by the end of the day today but with his time in the office so limited I can't guarantee it. I will let you know as soon as he has completed his review. JoAnne Zulauf -----Original Message----- From: Jared Underbrink \[mailto:jaredu@cgengineering.com\] Sent: Tuesday, July 08, 2008 4:26 PM To: Zulauf, JoAnne Cc: chevy@cgengineering.com Subject: Launceford Residence JoAnne, I was hoping for a status report on the Launceford Residence (bld20070695). We submitted a set of civil drawings dated 6/25/08 and I wanted to see if they had been approved. If there are any additional comments could you please email a copy to me? Jared Underbrink, EIT CG Engineering 250 4th Ave. South, Suite 200 Edmonds, WA 98020 phone: (425) 778-8500 fax: (425) 778-5536 jaredu@cgengineering.com