Loading...
20070695 Launceford Add.6.doc Jared, Don has completed his review. He said that the calculations looked fine. He would like you to show the rim, invert elevations on the section and profile details. So... to summarize all the remaining comments; 1) Show water and sewer on the site plan. 2) Add note to drainage plan regarding separation between sewer, water, storm. 3) Move drainage line to exit from Launceford property, add catch basin (with rim/invert elev.) in right of way and connect to existing catch basin ---OR--- obtain easement from neighboring property to place line across their property. 4) Show rim, invert elevations on infiltration system section and profile, sheet C3.1. Please let me know if you have any questions. Thank you. JoAnne Zulauf -----Original Message----- From: Jared Underbrink \[mailto:jaredu@cgengineering.com\] Sent: Tuesday, July 08, 2008 4:26 PM To: Zulauf, JoAnne Cc: chevy@cgengineering.com Subject: Launceford Residence JoAnne, I was hoping for a status report on the Launceford Residence (bld20070695). We submitted a set of civil drawings dated 6/25/08 and I wanted to see if they had been approved. If there are any additional comments could you please email a copy to me? Jared Underbrink, EIT CG Engineering 250 4th Ave. South, Suite 200 Edmonds, WA 98020 phone: (425) 778-8500 fax: (425) 778-5536 jaredu@cgengineering.com