20070709093323.pdfEsr. tsa° DATE: July 9, 2007 City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 TO: Eric Sundquist Fax 425-7746315 FROM: Jenny Readwin, Plans E aurin RE: Plan Check # 2007-0551 Project: SFR Project Address: 23575 74' Ave W During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) Please add the following information to the site plan. ■ Site plan must be scaled no smaller than 1"=20'. ■ Label front covered porch. You may redline plans or resubmit three (3) new site plans scaled no smaller than 1"=20' and one on paper no larger than 8 %Z" x 14". 2) Basement wine cellar appears to be a closet for the storage area. Any room with a closet is considered a sleeping room. Either reconfigure this area or provide egress and smoke detector for storage area. 3) Special inspections are required for the following. Complete the enclosed special inspection agreement signed by the owner, the general contractor and the special inspector and submit to the City for approval prior to issuance. • Excavation, grading, & site preparation • Soil bearing verification • Placement of fill & compaction • Proof Rolling • Subsurface drainage installation including footing drains. • Temporary and final erosion Control • Site retaining wall/ rockery construction. • Final letter from geotechnical engineer of record 4) See attached structural comments from city consultant. Respond to each item in writing. BJY Northwest Architecture • Engineering - Planning • Government Services June 05 2007 To: City of Edmonds Contact person:Theresa Re: New single residential building PLAN CK # 2007-0551 23609 74TH AVE. W BJY# 030731-014 The above referenced project is in the process of plan review for compliance with The City of Edmonds ordinances and applicable codes (Structural). The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the ordinance, structural and energy portions of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. 1 STRUCTURAL COMMENTS CALCULATION Provide diaphragm design to make sure the maximum diaphragm dimension ratio (4:1) is within code limit per IBC table 2305.2.3. Provide design, detail and calculation for each diaphragm chord, collector, drag force, boundary element, blocking, and strap, especially at the "L shape" reentrant corner. Please indicate the assumed dimension of diaphragms in your calculations. DRAWINGS 2. General -- Fasteners for preservative -treated and fire -retardant -treated wood shall be of hot -dipped zinc -coated galvanized steel, stainless steel, silicon bronze or copper. Coating weights for zinc -coated fasteners shall be in accordance with ASTM A153. Reference Section IBC Sec.2304.9.5 &I RC Sec. 319.3 3. General -- Provide details for the double wall plate lap splices where the plates act as diaphragm chords per IBC table 2304.9.1 item 10. 4. Sheet A5. Please call out naturally durable woods or treated wood for the structural members that are exposed to weather, such as the out door stair framing and so on. IBC 2304.11.5. 5. Sheet A6/A8. Wood deck attached to the exterior wall shall be designed to resist both vertical and lateral loads. Such connection shall not be accomplished by the use of nail subject to withdrawal per IRC R 502.2.1. Please provide connection detail to clarify. 6. Sheet S 1, shear wall schedule, Please specifies the 3X member for sill plate and framing member receiving edge nailing with staggered nailing for those shear walls has design value exceed 350 PLF (ASD), per IBC table 2306.4.1 note "i". 7. Sheet S 2, It appears the 2- ft long shear walls does not comply with the maximum shear wall aspect ratio per IBC table 2305.3.3. Please clarify. 8. Sheet S 3. Detail 3 9' top restrained end retaining wall. If the retaining wall is designed with the assumption of top and bottom restrained, then, the top reaction forces must transfer to the floor diaphragm or floor -framing members, which will increase the shear forces for diaphragm and shear wall design. All load paths must complete. Please resolve. 6 Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact BJY at (206) 264-8400 between 8:00 am and 5:00 pm. LIM Ted Chen 3 CITY OF EDMONDS SPECIAL INSPECTION AND TESTING AGREEMENT The project at 3575_ 740 ave_ CA-' issued under building permit number requires special inspection and/or testing per IBC Chapter 17. The complete list of special inspections is attached to this document. BEFORE A PERMIT CAN BE ISSUED: The owner and contractor and special inspector small complete this agreement and the attached structural test(s) and inspections schedule including the required acknowledgements. APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building Official prior to performing any duties or inspections. Each special inspector shall submit Statement of Qualifications to the Building Official for review. Special inspectors shall display identification when performing special inspections on site. Special inspection and testing shall meet the minimum requirements of IBC Chapter 17 and the following: A. Duties and Responsibilities of the Special Inspector 1. Observe Work The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC. Architect or Engineer reviewed shop drawings may be used only as an aid to inspection. Special Inspections are to be performed on a continuous basis—meaning that the special inspector is on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval by the City based on a separate written plan reviewed and approved by the Building Official and the engineer or architect of record. 2. Report Non -conforming Items The special inspector shall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report. Any item not resolved in a timely manner shall be immediate cause of the special inspector to notify the Building Official of the plan deviation, error, change or omission. It shall also be the duty of the special inspector to promptly notify the engineer or architect. 3. Complete Daily Reports Each special inspector shall complete and sign both the special inspection record and the daily report form for each day's inspection. These records shall remain at the jobsite with the contractor for review by the City Building Inspector. 4. Furnish Weekly Reports The special inspector or inspection agency shalt furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports must include the following: 0 Description of daily inspections and tests made with applicable locations • List of all non -conforming items • Report on status of non -conforming items (resolved or unresolved) • Itemized changes authorized by the Architect, Engineer and City if not included in non- conformance items. 5. Furnish Final Construction Report The special inspector or inspection agency shall submit a fmal signed report to the City stating that all items requiring special inspection and testing were fulfilled and reported. And, to the best of L:ITEMPIBUILDING\SpeciallnspectionAgreementlBC.doc 7/44 his/her knowledge the project is in conformance with the approved plans and specifications, approved change orders and the applicable workmanship provisions of the IBC. Items not in conformance or unresolved items or any discrepancies in inspection coverage, (i.e., missed inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically itemized in this report. B. Contractor Responsibilities 1. Notify the Special Inspector It is the duty of the contractor to notify the special inspector when work is ready for special inspection. Note, the items listed on the attached schedule and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. 2. Provide Access to Approved Plans The contractor is responsible for providing the special inspector access to approved plans at :the j obsite. 3. Retain Special Inspection Records The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City building inspector upon request. C. City of Edmonds Building Department Responsibilities 1. Approve special inspectors or inspection agencies The building department shall approve all special inspectors and special inspection requirements. 2. Monitor special inspection and approve weekly reports Work requiring special inspection and the performance of special inspectors shall be monitored by the City Building Inspector. His/Her approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. Issue Certificate of.Occupancy The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports including the final report have been submitted and accepted. D. Owner Responsibilities The project owner or the engineer or architect of record acting as the owner's agent shall fund special inspection services. E. Engineer or Architect of Record Responsibilities The engineer or architect of record shall include special inspection requirements on the plans and specifications. ACKNOWLEDGEMENTS 1 have read and agree to comply with the terms and conditions of this agreement. Owner Date Special Inspector Date General Contractor City Building Official L:ITEMPIBUILDINGISpecialInspectionAgreementIBC_doc 7104 Date Date SPECIAL INSPECTION AND TESTING SCHEDULE ^ L �V NAME ,( Rumt)IMPERMUNG PROiiF.CTAt)pRESS - AC04CY.a5PECLM-D PEC-na REINFORCED CONCRETE, GUNITE, GROUT AND MORTAR: STRUCTURAL STEELlWELDINGr Concrete Ganite Groot Mortar Sample and Test [list specific membe, below) Aggregate Tests —Shop Material Identification ReWorci y Tests - Welding Inspection 'DShop O Freed Mix Designs Ultrasonic Inspection OSbop O fieId Reinforcing Plamment — Iligb-strength Bolting Bitcb Plant Inspection Inspection O Sbop •O Field Inspect Placing O A325 Cas[ Samples O A490 CIN O X. O F pick-up samples Metal Deck Welding Inspection " Compression Tests — Reinforcing Steel Welding Inspection — Mesal Stud We)ding Inspections PRECASTIPRESTRESSED CONCRETE: — Concrmlasert welding Inspection Meg Post -Tens Prr%ns Cladding Aggttgatc7csu FIRE-I'ROOFING: Reinforcing Tests — Placement inspection Tendon Tests — Density Tests Mix Designs - Thickness Tests Reinforcing Placement — Inupcct Batching Insert Placement Concrete Batching INSULATING CONCRETE: Concrete Placement _ Sample and Test Installation Insepcoon — Placement Inspection Cast samples — Unit weights Pick-up Samples Compression Tests FILL MATERIAL: MASONRY' — Acceptance Tests — Placement Inspection — Special Inspection Stresses Used — Field Density — Ptcliminary Acceptancc Tests (Masonry units. Wall Prisms) ' Subsequent Tuts (Morro, Grout. Field Wali Prisms) STRUCTURAL WOOD: Placcmeru Inspection of Chits — Shear Wall Nailing Inspection. — Inspection of Glu -]am Fab. - Inspection of TrussJoistFab. ADDITIONAL INSTRUCTIONS OR OTHER TESTS --- Sample and Test Components AND INSPECTIONS: • Excavation, grading, & site preparation • Soil bearing verification • Placement of fill & compaction Proof Rolling • Subsurface drainage installation including footing drains_ . • Temporary and final erosion Control • Site retaining wall/ rockery -construction. • Final letter from geotechnical engineer of record For- completed by: Title Telephone No.: Date: