DATE: July 18, 2007
City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
TO: Renzo Nakata
renzo@rjnarchitects.com
FROM: Jenny Readwin, Plans E ami
RE: Plan Check # 2007-0557
Project: HSU new SFR
Project Address: 805 Driftwood Place
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised
plans/documents (affected sheets only) with a written response to each of the items below to a
Permit Coordinator.
1) Please add the following information to the site plan.
■ Clearly label second story deck. All that is shown is the terrace.
You may redline plans or resubmit three (3) new site plans scaled no smaller than 1"=20' and
one on paper no larger than 8 1/2" x 14".
2) Show how island sinks will be vented through the roof or with a loop vent as permitted by UPC
909.0.Air admittance valves are not permitted unless first approved by the Building Official
under and alternate method per UPC 301.2.
3) It appears that there will be a site built shower. Provide shower pan construction detail including
materials, drain, slope, etc.
4) Clearly show how combustion air per IRC Chapter 17 will be obtained in the mechanical room.
5) Provide letter from Geotechnical Engineer of Record stating that they have reviewed the plans
and that they are consistent with the report recommendations.
6) Special inspections are required for the following. Complete the enclosed special inspection
agreement signed by the owner, the general contractor and the special inspector (Geotechnical
Engineer of Record) and submit to the City for approval prior to issuance.
• Excavation, Grading, & Site preparation
• Soil Bearing Verification
• Placement of Fill & Compaction
• Subsurface Drainage Installation including Footing Drains
• Temporary and Final Erosion Control
• Site Retaining Wall/Rockery Construction.
• General site monitoring from Geotechnical Engineer of Record
• Final letter from Geotechnical Engineer of Record
7) See attached structural comments from city consultant. Respond to each item in writing.
BJY Northwest
Architecture - Engineering . Planning - Government Services
May 312007
To: Nakata .Architect Contact person: Renzo J.
12356 Northup Way Suite 102 Phone: 425-558-5657
Bellevue, WA 98005
Renzo@ RJ N architrcts. com
Re: New single residential building
PLAN CK # 2007-0557 805 DRIFTWOOD PLACE BJY# 030731-013
The above referenced project is in the process of plan review for compliance with
The City of Edmonds ordinances and applicable codes (Structural). The following
comments, deficiencies/corrections must be addressed prior to completion of
plans review and subsequent issuance of permits.
Provide revised plans and calculations along with a written response to each of the
items listed below to facilitate a shorter back -check time.
SCOPE OF REVIEW
The scope of this review is for the ordinance, structural and energy portions of this
project.
All features were checked only to the extent allowed by the submittals provided.
All portions of this project are assumed to meet or will meet other departmental
requirements, conditions and concerns before permit approval.
RECEiVED
JUN 0 4 2007
DEVELOPMENT SERVICES
1
STRUCTURAL COMMENTS
CALCULATION
1. Lateral loads analysis. Package submitted for review is missing seismic
calculation, there is only wind load calculation can be found. Please
provide copy of balance of calculations or indicate why only the wind
load governs the lateral load design.
2. Provide diaphragm design to make sure the maximum diaphragm
dimension ratio (4:1) is within code limit per IBC table 2305.2.3. Provide
design, detail and calculation for each diaphragm chord, collector, drag
force, boundary element, blocking, and strap. Please indicate the
assumed dimension of diaphragms in your calculations.
3. Provide drag strut analysis calculation along grid line 5 since the shear wall
have to sustain lateral loads coming from both garage and maim
building. Drag strut connection detail should be provided for wall
openings.
DRAWINGS
4. General -- Fasteners for preservative -treated and fire -retardant -treated
wood shall be of hot -dipped zinc -coated galvanized steel, stainless steel,
silicon bronze or copper. Coating weights for zinc -coated fasteners shall
be in accordance with ASTM A153. Reference Section IBC
Sec.2304.9.5 & IRC Sec. 319.3
S. Sheet 52.2 & 2.3, Interior shear walls, do not line up with framing lines
above. Provide section cutfdetails to address diaphragm load path
continuity. In other words, what is the connection between the floor and
the wall? Is it good enough to resist the lateral shear force? IBC section
1620.2.6. Collector element.
6. Sheet S 2,2, Can't find shear wall symbol along grid line A & A.2 in the
garage. Is it the design intention to have this cantilever diaphragm? If it
is, please check deflection and verify the adequacy of the diaphragm.
7. Sheet S 2.2, It appears the 2- ft long shear wall SW -4 between grid line 4 &
5 along E does not comply with the maximum shear wall aspect ratio per
IBC table 2305.3.3. Please clarify.
8. Sheet S 2.2, Please call out naturally durable woods or treated wood for the
structural members that are exposed to weather, such as the deck
framing and so on. Reference to A3.1 building section C -C, D -D. IBC.
2304.11.5.
2
9. Sheet S 2.3. It appears that some of the E -W direction shear walls are
missing. Please resolve.
10. Sheet S 3.3. Detail 27 shows deck frame member to rim are connected by
nails. Wood deck attached to the exterior wall shall be designed to resist
both vertical and lateral loads. Such connection shall not be
accomplished by the use of nail subject to withdrawal per IRC R 502.2.1
Additional corrections may be required following receipt of corrections and additional
information as requested
Your plans are being reviewed concurrently with the Building Department, Fite
Department, Zoning Department and Public Works Engineering. Changes, clarifications
or additional corrections may be required subsequent to the Building Department plan
review when comments are received from the other concerned departments.
Should you have any inquiries regarding this letter, please contact 8JY at
(206) 264-8400 between 8.00 am and 5:00 pm.
By:
Ted Chan
3
CITY OF EDMONDS
SPECIAL INSPECTION AND TESTING AGREEMENT
The project at v T i issued under building permit
number!2,A2����requires special inspection and/or testing per IBC Chapter 17. The
complete list of special inspections is attached to this document.
BEFORE A PERNIIT CAN BE ISSUED: The owner and contractor and special inspector shall complete
this agreement and the attached structural test(s) and inspections schedule including the required
acknowledgements.
APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building
Official prior to performing any duties or inspections. Each special inspector shall submit Statement of
Qualifications to the Building Official for review. Special inspectors shall display identification When
performing special inspections on site. Special inspection and testing shall meet the minimum requirements
of IBC Chapter 17 and the following:
A. Duties and Responsibilities of the Special Inspector
.1. Observe Work
The special inspector shall observe the site work for conformance with the approved (stamped) plans
and specifications and applicable workmanship provisions of the IBC. Architect or Engineer
reviewed shop drawings may be used only as an aid to inspection. Special Inspections are to be
performed on a continuous basis—meaning that the special inspector is on site at all times observing
the work requiring special inspection. Periodic inspections, if any, must have prior approval by the
.City based on a separate written plan reviewed and approved by the Building Official and the
engineer or architect of record.
2. Report Non -conforming Items
The special inspector shall bring non -conforming items to the immediate attention of the contractor
and note all such items in the daily field report. Any item not resolved in a timely manner shall be
immediate cause of the special inspector to notify the Building Official of the plan deviation, error,
change or omission. It shall also be the duty of the special inspector to promptly notify the engineer
or architect.
3. Complete Daily Reports
Each special inspector shall complete and sign both the special inspection record and the daily report
form for each day's inspection. These records shall remain at the jobsite with the contractor for
review by the City Building Inspector.
4. Furnish Weekly Reports
The special inspector or inspection agency shall furnish the City with weekly reports of tests and
inspections. The project engineer or architect, and others as designated shall also be copied on
reports. Weekly reports must include the following:
• Description of daily inspections and tests made with applicable locations
+ List of all non -conforming items
Report on status of non -conforming items (resolved or unresolved)
0 Itemized changes authorized by the Architect, Engineer and City if not included in non-
conformance items.
5. Furnish Final Construction Report
The special inspector or inspection agency shall submit a final signed report to the City stating that
all items requiring special inspection and testing were fulfilled and reported. And, to the best of
L.ITEMPIBUIL,DING1SpeciallnspectionAgreementlBC.doc 7/04
his/her knowledge the project is in conformance with the approved plans and specifications,
approved change orders and the applicable workmanship provisions of the IBC. Items not in
conformance or unresolved items or any discrepancies in inspection coverage, (i.e., missed
inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically
itemized in this report.
B. Contractor Responsibilities
1. Notify the Special Inspector
It is the duty of the contractor to notify the special inspector when work is ready for special
inspection. Note, the items listed on the attached schedule and as noted on the approved plans and
specifications are required to have special inspections. Adequate notice shall be provided by the
contractor so that the special inspector has time to become familiar with the project.
2. Provide Access to Approved Plans
The contractor is responsible for providing the special inspector access to approved plans at -the
jobsite.
3. Retain Special Inspection Records
The contractor is responsible to retain at the jobsite all special inspection records submitted by the
special inspector. These records are to be provided to the City building inspector upon request.
C. City of Edmonds Buildinj Department Responsibilities
1. Approve special inspectors or inspection agencies
The building department shall approve all special inspectors and special inspection requirements.
2. Monitor special inspection and approve weekly reports
Work requiring special inspection and the performance of special inspectors shall be monitored by
the City Building Inspector. Ms/Her approval must be obtained prior to placement of concrete or
other similar activities in addition to that of the special inspector.
3. Issue Certificate of Occupancy
The Building Oficial may issue a Certificate of Occupancy after all weekly special inspection reports
including the final report have been submitted and accepted.
D. Owner Responsibilities
The project owner or the engineer or architect of record acting as the owner's agent shall fuzed
special inspection services.
E. Engineer or Architect of Record Responsibilities
The engineer or architect of record shall include special inspection requirements on the plans and
specifications.
ACKNOWLEDGEMENTS
I have read and agree to comply with the terms and conditions of this agreement.
Owner
Special Inspector
General Contractor
City Building Official
T._1TEMPIBUILDINGISpeciallnspectionAgreementlBC.doc 7/04
Date
Date
Date
Date
0
SPECIAL INSPECTION AND TESTING SCHEDULE
7
REINFORCED CONCRETE, GUNITE, GROUT AND MORTAR: STRUCTURAL STEL LIWELDING:
CoDcrete Gtmite Grout Mortar — Sample andTest (Tim specific rumbas below)
Aggregate Tests — Sbop Material Identification
Reinforcing Tests — WrJd ng inspection -D SWp 0 Field
MkDcsigns — Ultzasnnic Inspection ❑Shop OFwId
Reinforcing Platx:rxnI — High-strength Bolting
Batch Plant Inspection Inspection 0 Shop 0 Field
Inspect Placing 0 A325 O N OX OF
Can Samples D A490
Pict: -up Samples — Metal Deck Welding Inspection
Compression Tests Reinforcing Steel Welding htspection j
— Metal Stud Welding inspection
PRECASTIPRESTRESSED CONCRETE: _.._ Concrete Insert Welding Inspection
Plies Past -Tens Pre -Tema Cladding
Aggregate %sts FIREPROOFING:
Reinforcing Tests , Placement Inspection
Tendon Tests — Density Tests
Mix Designs - Tbickness Tests
Reinforcing Placement — Inspect Batching
Insert Placement
Concrete Batching INSULATING CONCRETE:
Concrete Placcnrcnt _ Sample and Test
Installation Inscpaion — Placcomnt Inspection
Cast Samples — Unit Weights
Fick -up Samples
Compression Tests FILL MATERIAL:
MASONRY: — Acceptance Tests
Placement Inspection
— Special Inspection Stresses Used — Field Density
— Preliminary Acceptance Tests (Masonry Units. Wall Prisms)
Subsequent Tests (Mortar. Grout. Field Wan Prisms) STRUCTURAL WOOD:
— Placement Inspection of Units — Shear Wall Nailing Inspection
— Inspection of Glu -lath Fab.
.—. Inspection of Truss Joist Fab.
ADDITIONAL INSTRUCTIONS OR OTHER TESTS — Sample and Test Components
AND INSPECTIONS:
• Excavation, Grading, & Site preparation
• Soil Bearing Verification
• Placement of Fill & Compaction
• Subsurface Drainage Installation including Footing Drains
• Temporary and Final Erosion Control
« Site Retaining Wall/Rockery Constriction.
• General site monitoring from Geotechnical Engineer of Record
0 Final letter from Geotechnical Engineer of Record
Farm completed by: Title:
Telephone No.: Date.