Loading...
20070718085824.pdfOV �Dd DATE: July 18, 2007 City of Edmonds_ PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 TO: Katherine Esser, Architect FAX: 206-264-7769 FROM: Ann Bullis, Assistant Building Official RE: Plan Check #2007-0638 Project: Diener Addition Project Address: 403 Edmonds Street During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Provide written responses to each comment and where changes can be found on the plans. Please resubmit to Theresa Umbaugh, Permit Coordinator. 1. As previously noted in the Preapplication Comments dated February 14 2007. Below are excerpts from those comments: • The architect will need to do a code analysis to determine if the addition would be allowed. Proposed alterations must be designed taking into account the code requirements for both buildings. All alterations must meet current codes. • Many of the answers to these questions depend on the code analysis done by the architect and the design choices she chooses in the code to demonstrate compliance, addressing issues such as IBC 704 and 503 particularly with regards to buildings on the same lot (allowable area, exterior wall and opening protection, imaginary property lines, type of construction); .IBC Chapter 10 far exiting, etc. 2. Special inspection is required for the epoxy anchor installation. Complete the enclosed Special Inspection and Testing Agreement. Have the owner, contractor and special inspector sign the form and return for Building Official approval prior to permit issuance. Special inspectors must either be WABO Certified or a State licensed Professional Engineer. 3. Dimension the finished landing lengths and width for the new stair. R311.5 4. On building sections, show that minimum headroom dimension of 6'8" will be met. R311.5 5. On window schedule, note those that need to be safety glazed. 8308.4 6. Note on Sheet A5 that gas fireplace in master bedroom must be direct vent. G2406.2 See attached comments from the City's plan review consultant. Provide written responses to each comment,and where changes can be found on the plans. BJY Northwest Architecture • Engineering - Planning - Government Services June 27, 2007 Return Correction Notice & Plans to City of Edmonds Only To: Terry & Karen Diener Contact person: JoAnne Zulauf City of Edmonds 425.771.0220 x 1336 Re: Project Description: 1 SFR room addition with 2nd story PLAN CK # 2007-0638 403 EDMONDS ST. BJY# 030731-020 Structure Occupancy Cons't. Type Area S.F SF3 ADDITION R31U TYPE VB 679 The above referenced project is in the process of plan review for compliance with The City of Edmonds ordinances and applicable codes (Structural, Non Structural, Energy & Ventilation). The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response_ to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the ordinance, structural and energy portions of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. SHEET A 3 1. Garages beneath habitable rooms shall be separated from all habitable rooms by not less than 518 -inch type X gypsum board or equivalent. Plan indicates '/Z inch, Please Clarify 1► STRUCTURAL COMMENTS CALCULATION 1. Lateral loads analysis. Package submitted for review is missing seismic load vertical distribution in calculation. Please provide copy of balance of calculations. DRAWINGS 2. General -- Fasteners for preservative -treated and fire -retardant -treated wood shall be of hot -dipped zinc -coated galvanized steel, stainless steel, silicon bronze or copper. Coating weights for zinc -coated fasteners shall be in accordance with ASTM A153. Reference Section IBC Sec.2304.9.5 & IRC Sec. 319.3 3. Sheet A5 &A9, Please call out naturally durable woods or treated wood for the structural members that are exposed to weather, such as the deck framing and so on. IBC 2304.11.5. 4. Sheet A-3. Please call out all the missing beam size on the framing plan. 5. Sheet A-5. Please re -check and verify adequacy of the 2X6 @ 24 " O.C. that span 13 ft in the master bathroom area. 6. Sheet A-5. It appears that some of the E -W direction shear walls are missing. Please resolve. 7. Sheet A-5. Please call out the wood deck framing and its connection to the wall. 8. Sheet S1, Detail 2. The detail depict hanger connects to the top flange of WF steel beam. Simpson Strong tie catalogue shows HU28TF is not acceptable for weld -on application. Please clarify. 9. Sheet S1, Detail 6. Please specify the nailing or bolting that connects the ledger to the existing framing. Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact BJY at (206) 264-8400 between 8:00 am and 5:00 pm. 3 Umbaugh, Theresa From: Robert R. Doobovsky [robert.doobovsky@bjy.com] Sent: Monday, July 02, 2007 6:32 AM To: Umbaugh, Theresa Cc: Ted Chen Subject: Plan CK # 2007-0638 403 Edmonds st. BJY# 030731-020 See attached correction notice for flan CK # 2007-0638 - 403 Edmonds st. - BJY# 030731-020 Thank You Robert Doobovsky BJY Northwest Plans Examiner & Inspector Seattle Office Phone: 206 264.8400 FAX: 206 264.2729 Cell: 512 848-7052 7/2/2007 CITY OF EDMONDS SPECIAL INSPECTION AND TESTING AGREEMENT The project at issued under building permit number requires special inspection and/or testing per IBC Chapter 17. The complete list of special inspections is attached to this document. BEFORE A PERMIT CAN BE ISSUED: The owner and contractor and special inspector shall complete this agreement and the attached structural test(s) and inspections schedule including the required acknowledgements. APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building Official prior to performing any duties or inspections. Each special inspector shall submit Statement of Qualifications to the Building Official for review. Special inspectors shall display identification when performing special inspections on site. Special inspection and testing shall meet the minimum requirements of IBC Chapter 17 and the following: A. Duties and Responsibilities of the Special inspector .1. Observe Work The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC_ Architect or Engineer reviewed shop drawings may be used only as an aid to inspection. Special Inspections are to be performed on a continuous basis --meaning that the special inspector is on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval by the City based on a separate written plan reviewed and approved by the Building Official and the engineer or architect of record. 2. Report Non -conforming Items The special inspector shall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report_ Any item not resolved in a timely manner shall be immediate cause of the special inspector to notify the Building Official of the plan deviation, error, change or omission. It shall also be the duty of the special inspector to promptly notify the engineer or architect. 3. Complete Daily Reports Each special inspector shall complete and sign both the special inspection record and the daily report form for each day's inspection. These records shall remain at the jobsite with the contractor for review by the City Building Inspector. 4. Furnish Weekly Reports The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports must include the following: Description of daily inspections and tests made with applicable locations • List of all non -conforming items • Report on status of non -conforming items (resolved or unresolved) + Itemized changes authorized by the Architect, Engineer and City if not included in non- conformance items. S. Furnish Final Construction Report The special inspector or inspection agency shall submit a final signed report to the City stating that all items requiring special inspection and testing were fulfilled and reported. And, to the best of L:ITEMP1BUILDING1SpeciallnspectionAgreementlBC.doc 7104 his/her knowledge the project is in conformance with the approved plans and specifications, approved change orders and the applicable workmanship provisions of the IBC. Items not in conformance or unresolved items or any discrepancies in inspection coverage, (i.e., missed inspections, periodic inspection .when continuous inspections were required, etc_) shall be specifically itemized in this report. B. Contractor Responsibilities 1. Notify the Special Inspector It is the duty of the contractor to notify the special inspector when work is ready for special inspection. Note, the items listed an the attached schedule and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. 2_ Provide Access to Approved Plans The contractor is responsible for providing the special inspector access to approved plans at.the jobsite. 3. Retain Special Inspection Records The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City building inspector upon request. C. Cid of Edmonds Building Department Responsibilities I_ Approve special inspectors or inspection agencies The building department shall approve all special inspectors and special inspection requirements. 2. Monitor special inspection and approve weekly reports Work requiring special inspection and the performance of special inspectors shall be monitored by the City Building Inspector. HislHer approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. Issue Certificate of Occupancy The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports including the final report have been submitted and accepted. D. Owner Responsibilities The project owner or the engineer or architect of record acting as the owner's agent shall fund special inspection services. E_ En ineer or Architect of Record Responsibilities The engineer or architect of record shall include special inspection requirements on the plans and specifications. ACKNOWLEDGEMENTS I have read and agree to comply with the terms and conditions of this agreement. Owner Special Inspector General Contractor City Building Official L_1TEMPIBUILDINGiSpeciallnspectionAgreementlBC.doc 7104 Date Date Date Date SPECIAL INSPECTION AND TESTING SCHEDULE MOO TNAME REINFORCED CONCRETE, GUNITE, GROUT AND MORTAR: Conarne Guaite Gr"t Mortar Aggtcgate Tests Reinforcing Tcsu Mix Designs Reinforcing Placement Batch Pians Inspection Inspect Placing Cast Samples fief: -up Samples Compression Tests PRECAST/PRESTRESSED CONCRETE: rbcs roar -teres rre-Tmu Cladding Aggregate Tests Reinforcing Tests Tendon Tests Mix DesiRus Reinforcing Placement Insert Placement Concrete Batching Concrete Placemcat eper Installation Insiorl Cast Samples Pick-up sample Compression Tests MASONRY: - Special Inspeaion SUCSseS Used — Preliminary Acceptance Tests fMasomv units. W311 Prisms) Subsequent Tests (Mortar. Grout_ Field Wall Prisms) — Placement Inspection of Units BunDiNG P€RMT too. TLWiNG+WSP£Cr10N AGENCY a SKCIAt. lmsmCrplz STRUCTURAL STEELIWELDING: — Sample and Test (list spxifrc rnembrY baa,) — Shap Material Identification _ Wading 1-1-c ion D Shop D Field llFuasonic Inspection D Shop D FirM --- Higb-strength Bolting Inspection D Sbop D Field DA325 DN ❑X DF D A49() — Metal Deck Welding Inspection € — Reinforcing Steel Welding inspection i — Mewl Stud Welding Inspection — Concrete Insert Welding Inspection FIREi%OOFING: — Placement Inspection — Density Tests — Thickness Tests — Inspect Batching INSULATING CONCRETE: Sample and Fest — Placement Inspection — Unit Wughts FILL MATERIAL: Acceptance Tests Placement inspection Field Density STRUCTURAL WOOD- - Shear Wall Nailing Inspection — Inspection of Glu -lam Fab. — Inspection of Truss Joist Fab_ ADDITIONAL INSTRUCTIONS OR OTHER TESTS — Sample and Tut Components AND INSPECTIONS: Lo Form completed byLI--F Tiede_ Telephone tdo.: V �J? ! 1 Darr: v /