Loading...
20070731080251.pdfDATE: July 31, 2007 City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 TO: Shawn Leiser Fax 206-533-6038 FROM: Jenny Readwin, Plansxamin RE: Plan Check # 2006-1384 Project: Walnut St Condo (Duplex) Project Address: 301 Walnut St. During re -review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) ok. 2) ok 3) ok 4) a) South stair enclosure: i) ok ii) ok iii) ok b) ok c) ok d) Elevator shaft: i) ok ii) ok e) 7/31/07 Still need. No response given. 6/21/07 This information can not be deferred. Please show location of equipment room. You should talk to Labor and Industries about elevator equipment room requirements now so you can design it per their requirements to avoid future location problems. This all needs to be shown on the plans. Show the location of the elevator equipment room on the floor plans. Ventilation (supply and exhaust) will be required to maintain the required operating temperature specified in the manufacturer's information. Show the location of supply and exhaust air. If penetrations are made in the 1 -hour rated assemblies, shown how the fire rated assembly will be maintained, such as with gypsum lined joist bays, shafts, etc. 5) ok 6) ok 7) ok 8) ok 9) ok 10) ok