20070731080251.pdfDATE: July 31, 2007
City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
TO: Shawn Leiser
Fax 206-533-6038
FROM: Jenny Readwin, Plansxamin
RE: Plan Check # 2006-1384
Project: Walnut St Condo (Duplex)
Project Address: 301 Walnut St.
During re -review of the above noted application, it was found that the following information, corrections, or
clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected
sheets only) with a written response to each of the items below to a Permit Coordinator.
1) ok.
2) ok
3) ok
4)
a) South stair enclosure:
i) ok
ii) ok
iii) ok
b) ok
c) ok
d) Elevator shaft:
i) ok
ii) ok
e) 7/31/07 Still need. No response given. 6/21/07 This information can not be deferred. Please show
location of equipment room. You should talk to Labor and Industries about elevator equipment
room requirements now so you can design it per their requirements to avoid future location
problems. This all needs to be shown on the plans. Show the location of the elevator equipment
room on the floor plans. Ventilation (supply and exhaust) will be required to maintain the required
operating temperature specified in the manufacturer's information. Show the location of supply and
exhaust air. If penetrations are made in the 1 -hour rated assemblies, shown how the fire rated
assembly will be maintained, such as with gypsum lined joist bays, shafts, etc.
5) ok
6) ok
7) ok
8) ok
9) ok
10) ok