20070821082520.pdfOV EDo City of Edmonds 4.PLAN REVIEW COMMENTS BUILDING DIVISION �St. ls9° (425) 771-0220 DATE: August 21, 2007 TO: Michael Kerr mkerr@chateaucd.com FROM: Jenny Readwin, Plans Ex in RE: Plan Check # 2007-0498 Project: Chateau SFR Project Address: 8006 192'd Street SW During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) Please add the following information to the site plan. ■ Label covered porch You may redline plans or resubmit three (3) new site plans scaled no smaller than 1 "=20' and one on paper no larger than 8 %" x 14". 2) Per the submitted energy form the whole house fan is to be 150 cfm. Plans show 120 cfin. Please revise plans. 3) An additional smoke detector is required in the master suite and in the hallway outside the den. Please add to plans. 4) Provide footing drain detail on foundation sections complying with R405.1 and show required drain locations on the foundation plan. 5). There are some blue changes made to the upper floor plan. Please clarify these changes and since the plans are stamped by the Architect the plans can not be redlined for these changes (removing a wall?). 6) Special inspections are required for soil bearing verification because of the previous fill that was placed on the site (BLD2007-0553). Complete the enclosed special inspection agreement signed by the owner, the general contractor and the special inspector (Licensed Geotechnical Engineer) and submit to the City for approval prior to issuance. 7) See attached structural comments from city consultant. Respond to each item in writing. BJY Northwest Architecture • Engineering Planning Government Services Aug. 20, 2007 Return Correction Notice.& Plans to City of Edmonds Only To: City of Edmonds Contact person: Theresa Urnbaugh City of Edmonds 425.771.0220 x 1336 Re: Chateau New Single Family Resident Plan CK # 2007-0498 8006192 nd. St. SW BJY# 030731-041 STORY OCCUPANCY CONS'T. TYPE AREA S.F Garage U VB 541 1S Floors- deck R3 VB 2331.120 2" Floor R3 VB 2331 The above referenced project is in the process of plan review for compliance with The City of Edmonds ordinances and applicable codes (Structural, Non Structural, Energy & Ventilation). The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the ordinance, structural and energy portions of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. 1 STRUCTURAL COMMENTS DRAWINGS 1. Sheet A3/A4. It appears that there is no exterior shear wall in the left elevation. The horizontal diaphragm will act as a cantilever beam in this structural modeling and undertake a big deflection. Please provide more detailed calculation to justify this design. 2. Sheet L1. Reference Detail I ". Please specify the stand hook and the lap splice length of the footing dowel rebar with the vertical reinforcement in the concrete stem wall. Call out the thickness of the stem wall. 3. Sheet G1. Reference "typical wall section ". Please show standard hook for the rebar in the footing per IRC R403.1.3. Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact BJY at ted.cheaCbMyxom or (206) 264-8400 between 8:00 am and 5:00 pm 0 Ted Chen CITY OF EDMONDS SPECIAL INSPECTION AND TESTING AGREEMENT The project at ft issued under building permit number requires special inspection and/or testing per IBC Chapter 17. The complete list of speciaf inspections is attached to this document. BEFORE A PERMIT CAN BE ISSUED: The owner and contractor and special inspector shall complete this agreement and the attached structural test(s) and inspections schedule including the required acknowledgements. APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building Official prior to performing any duties or inspections. Each special inspector shall submit Statement of Qualifications to the Building Official for review. Special inspectors shall display identification when performing special inspections on site. Special inspection and testing shall meet the minimum requirements of IBC Chapter 17 and the following: A. Duties and Responsibilities of the Special Inspector I. Observe Work The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC. Architect or Engineer reviewed shop drawings may be used only as an aid to inspection. Special Inspections are to be performed on a continuous basis—meaning that the special inspector is on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval by the City based on a separate written plan reviewed and approved by the Building Official and the engineer or architect of record. 2. Report Non -conforming Items The special inspector shall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report. Any item not resolved in a timely manner shall be immediate cause of the special inspector to notify the Building Official of the plan deviation, error, change or omission. It shall also be the duty of the special inspector to promptly notify the engineer or architect. 3. Complete Daily Reports Each special inspector shall complete and sign both the special inspection record and the daily report form for each day's inspection. These records shall remain at the jobsite with the contractor for review by the City Building Inspector. 4. Furnish Weekly Reports The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports must include the following: • Description of daily inspections and tests made with applicable locations • List of all non -conforming items • Report on status of non -conforming items (resolved or unresolved) • Itemized changes authorized by the Architect, Engineer and City if not included in non- conformance items. 5. Furnish Final Construction Report The special inspector or inspection agency shall submit a final signed report to the City stating that all items requiring special inspection and testing were fulfilled and reported. And, to the best of L.ITEMPIBUILDING1SpeciallnspectionAgreementlBC.doc 7104 his/her knowledge the project is in conformance with the approved plans and specifications, approved change orders and the applicable workmanship provisions of the IBC. Items not in conformance or unresolved items or any discrepancies in inspection coverage, (i.e., missed inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically itemized in this report. B. Contractor Responsibilities 1. Notify the Special Inspector It is the duty of the contractor to notify the special inspector when work is ready for special inspection. Note, the items listed on the attached schedule and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. 2. Provide Access to Approved Plans The contractor is responsible for providing the special inspector access to approved plans at,the jobsite. 3. Retain Special Inspection Records The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City building inspector upon request. C. City of Edmonds Building Department Responsibilities Z. Approve special inspectors or inspection agencies The building department shall approve all special inspectors and special inspection requirements. 2. Monitor special inspection and approve weekly reports Work requiring special inspection and the performance of special inspectors shall be monitored by the City Building Inspector. His/Her approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. Issue Certificate of Occupancy The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports including the final report have been submitted and accepted. D. Owner Responsibilities The project owner or the engineer or architect of record acting as the owner's agent shall fund special inspection services. E. Epaineer_or Architect of Record Responsibilities The engineer or architect of record shall include special inspection requirements on the plans and specifications. ACKNOWLEDGEMENTS I have read and agree to comply with the terms and conditions of this agreement. Owner Date Special Inspector Date General Contractor City Building Official L:ITEMPIBUILDING1SpecialInspectionAgreementIBC.doc 7104 Date Date SPECIAL INSPECTION AND TESTING SCHEDULE PROTECTNAW Btr¢DMPEMrrmQ - i�7SL PROXCTADDREss —_ At,Et4L`rusrECtr�F trtsPEctv3t REINFORCED CONCRETE, GUNITE, GROUT AND MORTAR: STRUCTURALS I`EE%fVVELDINGc Concrete Guise Grant Mortar — Sa-Ple and Test f list specifc members below; Aggegate Tests — Shop Material Identifxation Reinforcing Tests Welding letspection Shop ❑Field Mix Designs T Ulttasrntieinspection ❑Sbop Ql--reld Reinforcing Placement . _ _ High-strength Bolting Batch Plant Inspection Inspection Q Shop O Field Inspect placing ❑ A375 ON DX OF Cast Samples DA490 Pick-up Samples — Metal Dock Welding Inspection Compression Tests Reinforcing Steel Welding Inspection I — Metal Stud Welding Inspection PRECAST/PRESTRESSED CONCRETE: Concrete Insert welding inspection Piles Post -Tens Pre -Teres CiAdding AggregmTests FIRE14tOOFING: Reinforcing Tests — Placement Inspection Tendon Tests — Density Tests Mix Designs - Thickness Tests Reinforcing Placement _.._ Inspect $etching Insert Placement Concrete hatching INSULATING CONCRETE: Cotxrete Placement Sample and Test Installation Inscpction — Placement Inspection Cast Samples — Unit Weights Pick-up Samples Compression Tests FILL MATERIAL: MASONRY — Acceptance Tests — Placement Inspection — Special Inspection Stresses Used — Field Density — Preliminary Acceptance Tests (Masonry Units. Wall Prisms) _ Subsequent Tests (Mortar_ Grout. Field Watt Prisms) STRUCTURAL WOOD_ _ Placement Inspection of Units — Shear Wall Nailing Inspection — Inspection of Glu -Iain Fab. — Inspection of Truss Joist Fab. ADDITIONAL INSTRUCTIONS OR OTHER TESTS — Sample and Test Components AND INSPECTIONS: Form completed by: Title: Telephone No.: Date.. Foundation Drainage Examples Footing drains are required for concrete or masonry foundation walls that retain earth and enclose habitable or useaOle space located below grade - IRC 405.1 Grade shall slope away from 6" minimum waGd- faundatiQn walls minimum 6 earth separation inches Within the first 10 feet. 4, ;J 711111L IT Filter membrane I I 4" perforated drain pipe in -washed gravel or crushed rack (minimum one Steve size larger than the opening or perforations FII 11-1 Habitable or useable space below grade Footing drains are required for crawlspaces if topography does not allow for minimum 6 inch slope away from the foundation wall within the first 10 feet - IRC 401.3 6" minimum wood - earth separation Filter membrane 4- perforated drain pipe in -X washed gravel or crushed rock (minimum.one sieve size larger than the opening or perforation) LAtemp)bLM&ngViw6DurfiXattactwnecdCl.vsd -471)6 i6l Crawlspace ATTACHMENT C1