20070822065531.pdfof EDo City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION Fst t $90 (425).771-0220 DATE: August 21, 2007 TO: Erik Bredberg AD Shapiro Architects FAX: 425-778-3032 FROM: Ann Bullis, Assistant Building Official RE: Plan Check #2007-0641 Project: New Townhouses (Building B) Project Address: 23006 Edmonds Way During review of the proposed plans for the above noted project, it was found that the following information, clarifications or changes are needed. Provide written responses to each comment and where changes can be found on the plans. Please resubmit to Marie Harrison, Permit Coordinator. 1. On Sheet AO.1 under contractor coordination notes, specifically note in one list separate permits and deferred submittals for this project. It appears that you intend mechanical/HVAC, plumbing, fire sprinkler, fire alarm, State electrical, and fire connection to be separate permits. Common deferred submittals are shop drawings, steel stairways, guardrails, listed and tested fire stopping assemblies, etc. Please clearly note for both so there is no confusion what is not included with this main building permit. 2. The "Existing Conditions" plan on Sheet AO shows existing property lines that must be removed or relocated so that buildings do not cross property lines. Contact Planning Division for appropriate procedure. 3. Sheet 20/AO.I Townhouse Lot Perimeters shows that lot lines will be placed between each dwelling unit and building. Clearly note on the plans if the subdivision will take place before or after construction of the buildings. If after building construction, it is the architect's responsibility to insure that the City approved construction plans for the building must address all code requirements with the intent of placing future lot lines between. If the subdivision will take place before building construction, a survey (prepared by a State Licensed Land Surveyor) will be required prior to pour of the foundation wall to insure that the building wall(s) are located on the property lines. 4. Lot lines are proposed to go through the middle of fire sprinkler room connecting Building A and Building B, which would not comply with fire separation distance requirements of the building code (IBC Chapter 7 and IRC R302). The fire sprinkler rooms also appear to connect these 2 buildings, requiring revised allowable area and height calculations to justify Type of Construction (IBC 503). This would also require Building B to be constructed entirely under the IBC rather than the IRC. Please revise to show code compliance. 5. Provide construction details of the fire sprinkler room and cross reference where they apply on the plans. 6. Revised occupancy to R3 for the dwelling units, and U for the garages. 7. Under "Building Code" information on Sheet A0, under the IRC allowable area calculations are not required, and height is limited to 3 stories per R101.2. 8. On the site plan, label all decks, cantilevers, patios, stairways, canopies, dumpsters, etc. Dimension distances to property lines. 9. .Provide stair construction detail for exterior stairways including rise, run, width, handrails on both sides, handrail height, handrail extensions, dimensioned landings, etc. 10. Expand 1/A2.1 by adding dimensions to required setback line to clearly show that all buildings, patios, canopies, retaining walls, etc. meet setback or encroach permitted distances into setback. Clearly label all items. 11. If proposed lot lines will separate dwelling units, a 2 -hour Fire Wall will be required (8317.2) with no openings permitted. Provide construction section details clearly showing a continuous 2 -hour Fire Wall from foundation through to the underside of the roof sheathing (see requirements of R317.2.2 exception 2). Provide listed and tested 2 -hour wall assembly with an STC of 50 or more. The fire wall must be constructed per R317.2. Only roof sheathing is permitted to be continuous across the fire wall, which must be coordinated with the structural plans. Clearly show how fire walls will terminate at the exterior wall. Clearly note what penetrations are proposed at the fire wall and provide listed and tested fire stopping assemblies applicable to the type and size of penetrations (see R317.2 exception in common 2 - hour wall). 12. Since 2 -hour Fire Walls will be creating separate buildings at proposed property lines, provide floor area and occupant load information for each dwelling unit (include fire sprinkler room where applicable). 13. Revise 7/A0.1 to show correct occupancies and fire ratings. 14. The listed and tested assembly for the exterior rated wall calls for Dens Shield on both sides. Please confirm this is what you are proposing. You may want to look at the Exterior Wall section of the Fire Resistance Design Manual (WP 8XXX) or UL assemblies for one that will meet your design. 15. Exterior wall coverings 5 feet or less to real or imaginary property lines must essentially be non- combustible by not exhibiting sustained flaming per NFPA 268. Revise elevation views and provide manufacturer's information for siding to show that it meets this requirement. 16. Sheet A10.1 window and door schedules are missing from the plans. 17. Provide a letter from the geotechnical engineer of record that they have reviewed the plans and they comply with the recommendations in their report from 7/10/2006, or provide addendum to report with additional recommendations. 18. Special Inspections will be required as follows: Geotechnical inspections: a. Excavation, grading and site preparation b. Shoring installation and monitoring c. Placement of fill and compaction d. Soil bearing verification e. Foundation and retaining wall drainage f. General Site monitoring during wet weather construction Structural inspections: g. Concrete construction h. Structural steel fabrication and erection i. Anchor bolt and holdown installation j . Shearwall and diaphragm nailing 19. See attached comments from City Consultant. Provide written responses to each comment and where changes can be found on the plans Page 2 of 2 To Re: Eagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359 hoytjeter@centurytel.net 360 874 0562 Fax 360 874 0591 Marie Harrison City of Edmonds Edmonds, WA 98020 Valhalla Building B (Townhouse) 23006 Edmonds Way Edmonds, WA 98020 Plan Review # 20070640 Date: August 19, 2007 Structure Stated Gross Area S.F. First floor 1296 Second floor 1296 Total 2592 Garage 1061 Total 3653 Sprinkler Yes EECE # EDM 07-29 The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. 4IONXII2411N•AI��.v The scope of this review is for the Structural, Ordinance, Energy and Barrier Free requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Page 2 of 7 EECE#: EDM 07-29 Valhalla Building B STRUCTURAL COMMENTS General 1. Engineer of Record (EOR), please reference where to use each detail. There is a note that states all details may not be used and for the contractor to verify, but the design professional should specify which detail to use where and cross off details that do not apply for this permit. Please modify the drawings to clearly show which detail is to be used where. I will do my best to try to verify where each detail is to be used and review the set based off this but the drawings should be revised to check the minimum code requirements. 2. EOR, the architectural drawings show entry canopy cantilevering off the side of the wall. Submit analysis or the support of this canopy.. 3. EOR, there appears to be items that do not pertain to this structure. For example, portions of the quality assurance plan. Please cross off all portions that do not pertain to this permit. Sheet A4.2 Wall Sections, Details 4. Detail 10: EOR, please provide an analysis for the entrance canopy connections. Sheet S 1.1 B General Notes 5. EOR, it appears there will not be any masonry to be used for this project. Please cross off items that do not apply to the construction of this structure. Sheet S2.1B Foundation & Level 1 Framing Plan 6. EOR, please show the locations of footing F7 in the foundation. It is not clear based off the drawings submitted. 7. EOR, please clarify on the drawings what the (A) stands for. S. Foundation Plan: EOR, please clarify what wall is to be used for WX wall. This is not in the schedule. 9. Add a key to the drawings showing span direction and spacing direction to assure the bearing walls. and joist are placed correctly. 10. It appears there are not any columns specified to support the beams. Please clarify the drawings. Page 3 of 7 EECE#: EDM 07-29 Valhalla Building B 11. EOR, please clarify column mark SC4 all that is in the schedule on sheet S3.1B is up to SC3. Please modify accordinly. 12. EOR please clarify the required column supporting the B10 beam. Sheet S 2.2B Level 2 & Roof Framing Plan 13. The vertical support of the beam mark B7 is not clear. Please clarify on the drawings the required column type. 14. EOR, please clarify what a CX column is. This is not in the schedule. 15. EOR, the required framing above the stairway is not clear. Please clarify on the drawings. 16. EOR, please clarify on the drawings what the (A) stands for. 17. EOR, please specify the required hanger connections for the B1 beam to the supporting member. It is not clear what is required. 18. EOR, please specify the required connections of beam mark B7 to beam mark B7. 19. EOR, please specify the required connections of beam mark B9 to B7. Sheet SMB Schedules 20. Shear wall schedule: EOR, please modify 14 to state single 3X member. The code does not allow (2) 2X members by when nail spacing is at 2" O/C. Please modify drawings accordingly. IBC table 2306.4.1 footnote e. 21. Hold-down schedule: EOR, please verify the reference stating to see 8/55.3 for installations at headers. This does not appear to be correct. Sheet S4.1B Typical Foundation Sections and Details 22. Detail 6: EOR, please submit an analysis for the attachment of the wood ledger to the concrete wall. Also, please specify the required edge distance of the KB3 to the concrete edge. 23. Detail 6: 1 called Hilti at 1-800-8798000 and asked them what the minimum edge clearance for the anchor specified is. They told me the edge distance must be a minimum of 4-114 for 518" bolt no matter how the load is applied. The load must be modified accordingly to their technical guide for influence of edge distances. For the full value you must have 8112". Based off the detail it appears this will not Page 4 of 7 EECE#: EDM 07-29 Valhalla Building B be met. EOR, please modify accordingly or submit documentation that the detail will support the loads as detailed. Hilti product technical guide Sheet S4.213 Typical Foundation Sections and Details 24. It is not clear on the drawings which detail is to be used. Also, without having this specified there is no way to review the analysis with the proposed drawings. Please cross reference the appropriate detail to use where. The design professional shall clearly note this. 25. Section 2 and 4: EOR, please submit an analysis for the ledger connection to the concrete wall to be able to resist the required designs forces. 26. Section 2, 3, 4 and 5: It appears, based off the detail, that the minimum edge distance will not be met for the wood ledger attachment to the concrete wall. Please modify accordingly. See comment per Hilti requirements 27. Based off the detail, the floor system will be bracing the top of the wall and the steel is located on the compression zone. EOR, please clarify the design of this wall and location of the steel as shown. When designing for soil pressure on concrete members the load factor is 1.6, similar to other live loads. Please modify accordingly. ACI 9.2 Sheet S5.1B Typical Framing Sections and Details 28. Detail 1,2,3,4,5: Toe nailing cannot be used to transfer more than 150 plf. Without knowing where these details will be used there is know way to verify this. Please modify the drawings accordingly. IBC 2305.1.4 29. EOR, please clarify where case A is located, as referenced in the details. 30. Please reference the details to the plans to assure the correct detail is used at the correct locations. Sheet S5.2B Typical Framing Sections and Details 31. EOR, please clarify where case A is located, as referenced in the details. 32. Please reference the details to the plans to assure the correct detail is used at the correct locations. Sheet S5.3B Typical Framing Sections and Details 33. Please reference the details to the plans to assure the correct detail is used at the correct locations. Page 5 of 7 EECE#: EDM 07-29 Valhalla Building B Sheet S6. 1B Typical Framing Sections and Details 34. Please reference the details to the plans to assure the correct detail is used at the correct locations. 35. EOR, please clarify the detail call out with a dash in it. It is the detail right after detail 9. Where does this detail apply? Sheet S7.1B Steel Framing Sections and Details 36. Please reference the details to the plans to assure the correct detail is used at the correct locations. ARCHITECTURAL COMMENTS General 37. Structural members supporting occupancy separations shall be the same rating as the occupancy separations. Please add details and clearly show this on the drawings. 38. AOR, it is not clear on the drawing the location of all property lines based off the distance to the exterior wall. Please add this information to the drawings in order to check required opening and rating requirements. R302 39. AOR, please clearly dimension the distance of the overhang (Projections) based off the location of the property line. Please add this information to the drawings. R302.1 Sheet A2.1 Building Plans 40. AOR, the code does not allow openings within 4 feet of the separation wall between the units. Please clearly dimension the sky lights to meet this provision. R317.2.2 41. It appears, based off the roof plan, that the downspouts will be crossing the property lines. Please clarify roof drainage on the drawings. 42. AOR, it appears, based off the drawings, there are openings within 4 feet of the 1 - hour wall due to the bathroom window (at grid line 2). Please modify or justify the opening locations. R317.2.2 Sheet A2.2 Unit B 1 & B2 Floor Plans Page 6 of 7 EECEM EDM 07-29 Valhalla Building B 43. Please add a smoke alarm on each level. One is required on each level and also giving access to each sleeping room. There is not one shown on first floor or garage hall way. Please add one on each level.R313 44. Please add a smoke alarm giving access to the bedrooms. None is shown at this time. R313 45. None of the windows in the bedroom specifies any egress requirements. Please modify the drawings to show the required egress from the sleeping rooms. R310 46. AOR, there are no details for the construction of the stairs. Please add this information on the drawings in order to check compliance with the code. R311.5 47. Please specify the required landing outside each exterior door. R311.4.3 48. AOR,'please show location of the handrails for the stairs as required per code. R311.5.6 49. It appears window 201 is required to be tempered based off the location proximity to the bathtub. Please clarify on the drawings and modify accordingly. R308.4 50. AOR please add detail XX on sheet A7.1 as noted for the first floor plan. Sheet A4.2 Wall Sections, Details 51. Detail 10: Please provide analysis for the entrance canopy shown on detail 10.. 52. Detail 13: AOR please clarify the call out noted XXX and Simpson clip XXX. 53. Detail 10: Please add to the set sheet A10.1. This was not included with this permit. Sheet A9.1 Details 54. Detail 1: Please complete the assemblies to maintain the 1 -hour rating. For . example, the required thickness of the gypsum ceiling, the attachments, etc. 55. Detail 2: EOR, please provide an analysis for the wood ledger. Ventilation and Indoor Air Quality Sheet A2.2 Unit B 1 & B2 Floor Plans 56. Please show the required ventilation for the washer and dryer room. WSV&IAQC 303.3.1 57. AOR, please show the required ventilation for the water closet as required per code. WSV&IAQC 303.3.1 58. AOR, please clarify the whole house ventilation requirements for this structure. WSV&IAQC 303.4 59. Please clarify how the dryer will be vented to the exterior on the drawings. It is not clear how this will be done based off the information submitted. 60. AOR, please clarify the required kitchen fan size and show locations. WSV&IAQC 303.3.1 Energy code General: 61. AOR; please specify the required floor insulation between the garage and residence. I was unable to find where this was clearly specified. 62. AOR, please note the required insulation for the floor at the cantilever portion of the structured. I was unable to find where this was noted. Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874- 0562 between 8:00 a.m. and 5:00 p.m. LO Hoyt Jeter, P.E. President