20070822105958.pdfa HDA City of Edmonds PLAN REVIEW COMMENTS - BUILDING DIVISION gst. 1990 (425) 771-0220 DATE: August 22, 2007 TO: Ralph Allen rwallen@gracearchitectspllc.com FROM: Ann Bullis, Assistant Building Official f6_ RE: Plan Check #2007-0382 Project: Reichler Office Building Addition Project Address: 21827 76�' Ave W During re -review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Provide written responses to each comment and where changes can be found on the plans. Please submit revised plans/documents to Marie Harrison, Permit Coordinator. Below comment numbering corresponds to previous plan review comments dated August 1, 2007, with outstanding issues noted. 1. ok 2. Upper floor use of space adjacent to elevator still not labeled. 3. ok — smoke barrier provided since building will be fully sprinkled 4. ok — architect made additional clarification notes. 5. ok 6. As noted in the first plan review comments dated May 4, 2007, the northeast exit enclosure must exit directly to the outside or to a 1 -hour exit passageway (TBC 1019, 1020, 1023.1). The storage room door is not permitted to open into the stair enclosure nor the exit passageway because it is not a "normally occupied space" as required per IBC 1019.1.1. The original plans for this building show the storage area as a dead space. The resubmitted plans now show the stair enclosure exiting into the parking garage which is not permitted. As noted above, exit enclosures must exit directly to the exterior of the building or to an exit passageway. A redesign of this exiting is required. 7. ok 8. Note on plans that existing beams exposed during construction that support the 1 -hour occupancy separation and fire barrier walls must be individually protected to 1 -hour construction. 9. ok 10. ok 11. ok 12. ok 13. ok 14. ok 15. Clarify on hardware key Sheet A4.0 that exit hardware "E" must not prevent a door from being openable from the egress side without key, special knowledge or effort. Currently it notes "key lock from each side". 16. ok 17. ok -- since building will be fully sprinkled. 18. ok 19. ok 20. The architect's response to this item was that "arrows showing the path for egress has been shown on the plans" which does not address the original comment. Previous item 20 regarding accessibility upgrades to the existing portions of the building: Since the exterior accessible path of travel is provided, this would apply to the parking garage and main floor. Show complying accessible route throughout or if you choose to use exception #1 of .IBC/WAC 3409.6, provide a letter stamped and signed by the architect (reference the code exception), stating what parts of the existing building are not accessible, the project cost and what 20% of it equals, list the upgrades that will be done as part of this permit as well as showing that the total cost of the upgrades is at least 20yoo. 21. ok — Kawneer glazing system now listed as deferred submittal. 22. ok 23. Contractor needs to sign the written statement that was submitted August 10, 2007. 24. Special Inspection Agreement cannot be deferred. It must be submitted and approved prior to permit issuance. 25. Add new sheets C1, C2; and L1 to drawing list on coversheet. Clarify if they are proposed or existing for reference only. Page 2 of 2