Loading...
20070830091803.pdfDATE: August 30, 2007 TO: Brian FAX: 425-776-3622 FROM: Ann Bullis, Assistant Building Official RE: Revision to Permit 2007-0278 Project: Aegis Mechanical Revisions Project Address: 21500 72nd Ave W During re -review of the revised plans for the above noted project, it was found that the following information, clarifications or changes are needed. Provide written responses to each comment and where changes can be found on the plans. Please submit revised plans/documents to Marie Harrison, Permit Coordinator. 1. Previous comment 3: Per City/owner meeting on 8/30/07, both fire dampers and smoke dampers (or combination fire/smoke dampers) are required per IBC 716.5.3.1 for all penetrations of the shaft wall near the central stair. This item is still outstanding. Also, abandoned openings in the shaft, such as at the crawlspace and at room 331, must be infilled with I -hour construction. City of Edmonds `' s; PLAN REVIEW COMMENTS BUILDING DIVISION �sr l8go (425)771-0220 DATE: August 30, 2007 TO: Brian FAX: 425-776-3622 FROM: Ann Bullis, Assistant Building Official RE: Revision to Permit 2007-0278 Project: Aegis Mechanical Revisions Project Address: 21500 72nd Ave W During re -review of the revised plans for the above noted project, it was found that the following information, clarifications or changes are needed. Provide written responses to each comment and where changes can be found on the plans. Please submit revised plans/documents to Marie Harrison, Permit Coordinator. 1. Previous comment 3: Per City/owner meeting on 8/30/07, both fire dampers and smoke dampers (or combination fire/smoke dampers) are required per IBC 716.5.3.1 for all penetrations of the shaft wall near the central stair. This item is still outstanding. Also, abandoned openings in the shaft, such as at the crawlspace and at room 331, must be infilled with I -hour construction.