Loading...
20070904073258.pdfCity of Edmonds 121 5T` AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Plan Review Corrections Application #: bld2007O382 Date: August 30, 2007 Project Name/Address: THE REICHER OFFICE BLDG / 21827 76' Ave W Contact Person/Address, Fax or E-mail: Ralph Allen / e-mail: rwallen(a-)Uacearchitectspllc.com Reviewer: Jeanie McConnell Division: Engineering During review of the re -submittal it was found that -the following information, corrections, or clarifications will need to be addressed: 1. ok 2. ok 3. ok 4. ok 5. ok 6. ok 7. Jeanie McConnell's continents of April 9 and August 15: Sewer line adequacy must be determined at this time as all site improvement work will be approved under this permit, not the plumbing permit as referred to in the response letter. The location of the existing sewer line and pipe size needs to be shown on the site plan and the adequacy of the line size must be verified. Comment 419107 - Verify the adequacy of the existing 6" sewer lateral and provide the necessary calcs for review. were not adequately addressed. The redlined phrase, "Contractor to field inspect and verify adequacy of sewer line," is not an appropriate response. Your engineer must in writing compare the capacity of the existing line and show how the additional fixtures do or do not exceed that capacity. 8. ok 9. ok DATE E-MAILED 8130/07 PAGE(s) 1 of 1