20070919103011.pdfCity of Edmonds €;Ad PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: September 19, 2007 TO: Kambiz Yaraei kaya@u.washington.edu FROM: Jenny Readwin, Plans E amin;' f RE: Plan Check # 2007-0549 Project: Remodel Project Address: 23712 101st Ave W. During re -review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) ok 2) ok 3) ok 4) 9/17/07 Please add all of your proposed information to the plans. Show the windows being re laced and the walls where the insulation is proposed. Please add to all applicable pages. 8/15/07 Just chanzina out the windows can not substitute for lack of floor and wall insulation. Please propose addition upgrades (i.e. additional insulation throughout existing attic chap a out other windows in the main house etc.) or provide component performance analysis(see below). Also, we need to know what the wall insulation is in this portion of the residence. Response said the walls are sheet rocked and appear to have insulation. Please specify R_value of insulation. 816107 Although the room was previously converted it was not done with permits. Now that we are permitting it the insulation must meet current code. This correction still applies. Minimum insulation R -Values for habitable space is R-21 wall, R-30 floor or R-10 slab and R-38 ceiling. Based on plans submitted this area does not meet minimum insulation requirements. Complete a component performance analysis found at www.energy.wsu.edu or submit letter stating proposed upgrades to existing residence such as new windows, more attic insulation, etc. to compensate. 5) 9/17/07 response to my correction states that the roof will be altered to make the upper floor bedroom meet the minimum 7' headroom. Please provide roof framing plan and section details showing haw this will be done. $/15/07 Minimum headroom habitable ac..e is ,7'per 8305 and then the roof can slope from there. Upper floor does not meet minimum headroom pier plans submitted. 8/6/07 floor framing plan needed to check joist size, spacing and span. Provide framing plans for second floor. Also specify use of space, headroom, and dimensions. 6) ok 7) ok 8) ok. 9) ok