Loading...
20071001080635.pdfor Eby City of Edmonds ``e`;`=```"`, PLAN REVIEW COMMENTS - BUILDING DIVISION 'yt.} g90 (425) 771-0220 DATE: October 1, 2007 TO: Francois Madath francoism@archreports.com FROM: Jenny Readwin, Plans E amin RE: Plan Check # 2007-0910 Project: Addition/Remodel Project Address: 513 2"d Ave N. During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) Please add the following information to the site plan. ■ Show 36" landings outside the laundry and garage mandoors. You may redline plans or resubmit three (3) new site plans scaled no smaller than 1 "=20' and one on paper no larger than 8 '/Z" x 14". 2) On the floor plans specify all room uses in the existing residence and specify if any remodel work will take place in these rooms (i.e. sheetrock). If the proposed dormers are going in sleeping rooms specify that the windows meet egress requirements. 3) Note hardwired and interconnected smoke detectors with battery back up are required throughout the existing residence in each sleeping room and in the hallway outside each separate sleeping area. 4) See attached structural comments from city consultant. Respond to each item in writing. Eagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359 hoytjeter@centurytel.net 360 874 0562 Fax 360 874 0591 To: Francois & Donna Madath 121 5th Ave. W Edmonds, WA, WA 98020 Re: Madath Addition 513 2nd Ave. N Edmonds, WA, WA 98020 Plan Review 9 2007-0910 Date: September 21, 2007 EECE ff EDM 07-35 Structure Stated Area S.F. Existing Main floor ??? New Main floor 339 ExistiRg Upper floor ??? New 11pper floor 838 Total 1177 Garage 564 Total 1741 xisting Main floor Deck ??? rand total ??? The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the Ordnance Energy and Ventilations and Indoor Air Quality and Structural requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Page 2 of 3 EECE#: EDM 07-35 Madath Addition STRUCTURAL COMMENTS General 1. Please provide framing plans for the existing house. Proposed new openings and new roof configurations within the existing structure can not be adequately reviewed without existing framing information. Sheet 3: Main Floor Plan 2. Please specify the required connection of the 3-118 x 10-112 Glulam to the supporting members at the garage opening. 3. It appears that a new opening (a new door) is being cut into the existing exterior wall at the new laundry room. Please provide analysis and existing framing plans to show that the new opening is not compromising an existing bearing wall or that the specified header is adequate for the loads. Sheet 4: Upper Floor Plan 4. It appears that a new opening (a new door) is being cut into the existing exterior wall at the stair landing. Please provide analysis and existing framing plans to show that the new opening is not compromising an existing bearing wall or that the specified header is adequate for the loads. Sheet 5: Roof Framing Plan 5. Please provide a detail and analysis to show how the 2x6 rafters and the 2x4 ceiling joists cantilever from side of the exterior wall. 6. Please specify the size of the 2x ledger. 7. Please specify the required connection of the 2x ledger. 8. It appears that the change in configuration of the two existing roof dormers from `shed' to `gable' will change the location of the load path (bearing walls) of the roof. Sheet 6: Sections 9. Please reference the details to the drawings, and detail all details that do not pertain to this structure. R106.1.1 ` Page 3 of 3 EECE#: EDM 07-35 Madath Addition ORDINANCE COMMENTS General 10. Please submit floor plans of existing house (all floors) with the all rooms labeled. R106.1.1 Sheet 1: Elevations 11. It appears from the elevations, that new windows are being installed in existing dormers. Please clarify use of existing dormers, and if new windows are to meet emergency egress requirements in these locations. 8310.1 Sheet 2: Foundation Plan 12. Please clarify that the existing foundation venting is not being diminished by the addition. ENERGY CODE Prescriptive method used. No comments at this time. VENTILATION & INDOOR AIR QUALITY CODE (V&IAQC) 13. Please specify the location of the whole house fan. It does not appear to be within the new addition. 14. Please specify the size of the whole house fan. Since the area of the existing house and the total number of bedrooms is not provided, the size of the whole house fan cannot be determined. Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874- 0562 between 8:00 am. and 5:00 p.m. By: Hoyt Jeter, P.E. President