Loading...
20071003091636.pdfPlan Check #_ / Zr (���iDate Project Name/Address 05— Contact Person/Address AAt-�—Wo- z—:�ii�iL Department: Building l Engineering ❑ Planning ❑ Fire ❑ Public Works ❑ ReviewerS flr'7�"7�1r��.t4 ► !I� ! :.l �Df a r`c _■ � i/ a ■i �■ L_�1�2.. J1g11iI /r b� ,moi ls�t Submit 2 sets of revised plans/documents to the Permit Coordinator. ❑ Corrections may be made by red lining plans/documents on file with the City. DATE FAXED (Attach fax transmittal) PAGE � OF Eagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359 hoytjeter@centurytel. net 360 874 0562 Fax 360 874 0591 To: Ron & Sheri Honeycutt 16719 Cobblestone DR Edmonds, WA, 98037 Re: Honeycutt Garage Addition 8615 187th PL SW Edmonds, WA, 98020 Plan Review # 2007-0929 Date: October 1, 2007 EECE # EDM 07-40 Structure Existing Area Stated SF New Area S.F. Main Level Exiting Residence 1958 New Exercise Room ? ? Total Existing Garage 523 Garage 684 Total ? Porch 56 Grand total ? ? The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the Structural requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Page 2 of 3 EECE#: EDM 07-40 Honeycutt Garage Addition STRUCTURAL COMMENTS Sheet Al: General Notes/ Site Plan 1. Please update the general note to state nailing shall be per the TBC 2006 and not the 2003 TRC. There are many changes between the codes and the 2006 is the adopted code since July 12007, R table R602.3.1 Sheet A6: Foundation Plan/ Details 2. Please submit analysis for the retaining wall per the IBC 2006. Walls exceeding 4' of retained soil are required to be engineered and with appropriate details. This has not been submitted at this time. IBC 1806 Sheet A7: Roof Framings/ Details 3. On Sheet A6 existing bearing wall is being removed and a beam is being added. Please submit analysis and details for this new beam being added to transfer the design loads. Also, please specify the required beam size to support the required design forces. 4. Please add to the drawing the required post base connections for the new 4x6 wood column supporting the ridge beam. This is bearing on a concrete wall below and a base connection is required to be specified. 5. Please specify the required post and connection for the new (2) 2x 12 added. Nothing is specified at this time. 6. Please provide details on the drawings for the framing of the new ridge line. It appears the existing ridge line is changing and it is not clear how this will be framed. 7. In order to use the alternate brace panel the header shall be a minimum of 3"X11.25" net size. Drawings state 5-1/4X9-1/2. Please modify the drawings to state a depth of 12" and not 9". Figure R602.10.6.2 8. The drawing show a new upper level being added without any lateral resisting elements. Please clarify the lateral resisting elements at this area. Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications Page 3 of 3 EECE#: EDM 07-40 Honeycutt Garage Addition or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874- 0562 between 8:00 a.m. and 5:00 p.m. In Hoyt Jeter, P.E. President