20071011145152.pdfor �� City of Edmonds ,a - ' PLAN REVIEW COMMENTS BUILDING DIVISION �Sr t g9n (425) 771-0220 DATE: October 11, 2007 TO: Ron Johnson, Architect E-mail: ronmaile@verizon.net FROM: Ann Bullis, Assistant Building Official 17— RE: Plan Check # 2007-0962 Project: Stella De' Oro Apartments Project Address: 1120 5' Ave S During review of the plans and documents for the above noted project, it was found that the following information, clarifications or changes are needed. Provide written responses to each comment and where changes can be found on the plans. Please resubmit to Theresa Umbaugh; Permit Coordinator. 1. Provide itemized written contractor's bid for the work, including detailed description of work to be done. Commonly dry rot repair work is difficult to bid since conditions are not seen until construction is exposed. If during construction, it is found that additional structural work must be done that was not accounted for in the original bid, the permit on record with the City must be revised and additional fees paid based on a required new bid. 2. A special inspection is required, by either the Architect (Ron Johnson) or a ,State Licensed Professional Engineer, of existing structural members once they are exposed to determine if the cantilevered joists must be replaced. Complete the enclosed Special Inspection Agreement; have the building owner, general contractor and special inspector sign the agreement and return for Building Official approval prior to permit issuance. 3. In anticipation of one or more cantilevered joist being replaced in its entirety, provide an S 1/2 x 11 detail (stamped and signed by Architect) showing how this will be done, including nailing of floor sheathing, blocking at bearing walls, replacement of 1 -hour rated assemblies, and fire stopping of penetrations of rated assemblies exposed during construction. If sintering of joists will be done, provide size of joist, nailing size and spacing, and minimum backspan of sistered section. 4. Clarify Sheet 16 of plans that siding, exterior gypsum sheathing, and plywood sheathing replaced during construction will be replaced per original approved plans (some of these notes appear to have been crossed out). CITY OF EDMONDS SPECIAL INSPECTION AND TESTING AGREEMENT The project at LT ,a.. �2 JJ?=Q Z j-EQ(Lyiyffgan� issued under building permit number At 7{ CQq lo -2-- requires special inspection and/or testing per IBC Chapter 17. The complete list of special inspections is attached to this document. BEFORE A PERMIT CAN BE ISSUED: The owner and contractor and special inspector shall complete this agreement and the attached structural test(s) and inspections schedule including the required acknowledgements. APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building Official prior to performing any duties or inspections. Each special inspector shall submit Statement of Qualifications to the Building Official for review. Special inspectors shall display identification when performing special inspections on site. Special inspection and testing shall meet the minimum requirements of IBC Chapter 17 and the following: A. Duties and Responsibilities of the Special Inspector 1. Observe Work The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC_ Architect or Engineer reviewed shop drawings may be used only as an aid to inspection. Special Inspections are to be performed on a continuous basis --meaning that the special inspector is on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval by the City based on a separate written plan reviewed and approved by the Building Official and the engineer or architect of record. 2. Report Non -conforming Items The special inspector shall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report. Any item not resolved in a timely manner shall be immediate cause of the special inspector to notify the Building Official of the plan deviation, error, change or omission. It shall also be the duty of the special inspector to promptly notify the engineer or architect. 3. Complete Daily Reports Each special inspector shall complete and sign both the special inspection record and the daily report form for each day's inspection. These records shall remain at the jobsite with the contractor for review by the City Building Inspector. 4. Furnish Weekly Reports The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports must include the following: • Description of daily inspections and tests made with applicable locations • List of all non -conforming items Report on status of non -conforming items (resolved or unresolved) Itemized changes authorized by the Architect, Engineer and City if not included in non- conformance items. S. Furnish Final Construction Report The special inspector or inspection agency shall submit a final signed report to the City stating that all items requiring special inspection and testing were fulfilled. and reported_ And, to the best of L:!TEMPIBUILDING1SpecialImpectionA.greementIBC_doc 7/04 his/her knowledge the project is in conformance with the approved plans and specifications, approved change orders and the applicable workmanship provisions of the TBC. Items not in conformance or unresolved items or any discrepancies in inspection coverage, (ie_, missed inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically itemized in this report. B. Contractor Responsibilities 1. Notify the Special Inspector It is the duty of the contractor to notify the special inspector when work is ready for special inspection. Note, the items listed on the attached schedule and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. 2. Provide Access to Approved Plans The contractor is responsible for providing the special inspector access to approved plans at the jobsite. 3. Retain Special Inspection Records The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City building inspector upon request. C. City of Edmonds Building Department Responsibilities 1. Approve special inspectors or inspection agencies The building department shall approve all special inspectors and special inspection requirements. 2. Monitor special inspection and approve weekly reports Work requiring special inspection and the performance of special inspectors shall be monitored by the City Building Inspector. His/Her approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. Issue Certificate of Occupancy The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports including the final report have been submitted and accepted_ D. Owner Responsibilities The project owner or the engineer or architect of record acting as the owner's agent shall fund special inspection services. E. Engineer or Architect of Record Responsibilities The engineer or architect of record shall include special inspection requirements on the plans and specifications. ACKNOWLEDGEMENTS I have read and agree to comply with the terms and conditions of this agreement. Owner Special Inspector General Contractor City Building Official L_tTEMI'1BUILDING\SpeciallnspectionAgFeementlBC_doc 7/04 Date Date Date Date SPECIAL INSPECTION AND TESTING SCHEDULE MMCT NAME motto A -TESIINGM45PECDON wGEtwCY,� spE[L}t_ Iu5F&Crott REINFORCED CONCRETE, GUNITE, GROUT AND MORTAR: Concttiett Gnnite Grout Mortar Aggregate Tests Reinforcing Trus Km Designs Rtintorcieg PlaccmcnF Batch Plant Inspection Inspect Placing Cast Samples Pick-up Samples Compression Tau PRECAST/PRESTRESSED CONCRETE- . - ONCRETE: l- rm-m-scm ere"it:as Aggcgate Tests Reinfmcing Tests Tendon Tests Mix Desians Reinforcing Placement Insert Placement Concrete Batching Concrete Placemcut Installation Insetection Tests MASONRY- - Special Inspection Stresses Used — preliminary Acceptance Tests (Masoary Units. Wall Prisms) Su" -w "Pests (Mone. Grow. Field Wall Prisms) ____ Placement Inspection of Units ADDITIONAL INSTRUCTIONS OR OTHER TESTS AND INSPECTIONS: Form complcwd by_ STRUCTURAL STEEUWELDING: — Sampk and Test (list spedfic menbcrs below) — Shop MaterialIdcruificat Wcidin€ I -Peed— 0 Shop Q Field Uhrasonic Inspection Q Shap Q Field — Higb-strength Bolting I -P -Tion Q Shop F7 Field Q A325 QA490 QM QX OF _ Metal Deck Wclding Inspection Reinforcing Steel welding hnpecam # — Mcul Stud Welding Inspection — Concrete Insert welding Inspection FIREfi"FING: — Plaeemeter Inspection — DensiryTests — ThickncssTcsts — Inspect Batching INSULATING CONCRETE: — Sample and Test — Placcrnrnt Inspection — Unit Weights . FILL MATERIAL: — Acceptance Tests — Placemcm Inspection Field Density STRUCTURAL WOOD: Shear Wall Mailing Insptcliom Inspection of Glu -lam Fab. Inspection of Truss )dist Fab - Sample and Test Components e---VAi.J; _'i'. vZm it Title Tclephone No.—