Loading...
20071019104434.pdfo� EDO City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION .(425) 771-0220 DATE: October 19, 2007 TO: Norco Construction FAX 360-654-0881 FROM: Jenny Readwin, Plans E amin RE: Plan Check # 2007-0902 Project: SFR Project Address: 9725 227�h Place SW During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) Please add the following information to the site plan. 9 Show the roof outline ■ Label all bumpouts (i.e. fireplace) You may redline plans or resubmit three (3) new site plans scaled no smaller than 1"=20' and one on paper no larger than 8 %" x 14". 2) See attached structural comments from city consultant. Respond to each item in writing. Eagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359 hoytjeter@oenturytel.net 360 874 0562 Fax 360 874 0591 To: Jerry & Virginia Lowe 121 5th Ave. N Edmonds, WA, WA 98020 Re: Lowe Residence 9725 227th PL SW Edmonds, WA, WA 98020 Plan Review # 2007-0902 Structure Stated Area S.E First floor 2076 Second floor 878 Total 2954 Garage 720 Total 3674 overed Knq 24 rand total 3698 September 19, 2007 EECE # EDM 07-34 The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the Structural, Ordinance, Ventilations and Indoor Air Quality and, Energy requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. STRUCTURAL CONBMNTS Sheet 5: Foundation Plan Page 2 of 4 EECE#: EDM 07-34 Lowe Residence 1. Engineer of Record (EOR), please specify the required footing size at the left end wall under the post shown. The size of this footing is not clear. 2. EOR, please clarify the TH truss specified as a T3I 250. This joist is not in the truss joist catalog to check capacity. Please modify to state the joist that will be used per published data or submit ICC report of the joist specified in order to check that it will support the design loads. 3. EOR, please provide calculations that the perimeter footing will support the point loads from the girder beam. 4. The analysis submitted for the 42X42X12 footing states 6 #4 required but the drawings state 5#4. Please clarify why a smaller reinforcement is specified than the analysis requires. 5. Please submit an analysis for the 24X24X10 footing. This was not in the analysis submitted. Per check analysis it appears 4#4 are required, not 3#4 as specified on the drawings. Please justify footings at this location. Sheet 6: Upper Floor Framing 6. EOR, please specify the required connections of the 5-1/4X5-114 PSL column to the 5-114X16 PSL beam. 7. EOR, please specify the connections of the (3) 2x6 column to the 5-114X16 PSL beam. Nothing is specified at this time. 8. EOR, please specify the required connection of the 3-112X5-113 P -lam column to the different beams framed into it. It is not clear what the required connections will be. 9. EOR, please provide an analysis for the 6X12 beam supporting the hip master truss. 10. EOR, please note (3) 2x6 shall also be at the other end of the 6X12 or submit an analysis to justify that it is not required. 11. Please provide a detail between the low roof and the upper framing floor. It is not clear how this is going to be built in order to complete the review. Sheet 8: Details & Sections 12. Deck Detail: Please specify the required connection of the Scab ties on the drawings. Page 3 of 4 EECE#: EDM 07-34 Lowe Residence 13. Deck Details: Nails cannot be used for the ledger of deck construction. Please modify detail accordingly. R502.2.1 14. Please note that reinforcement steel shall have a 90 degree hook on the wall to footing. R403.1.3 15. Stair detail: EOR, please specify the required connection of the stair stringer to the supporting beams. Nothing is specified at this time. ORDINACE COMMENTS Sheet 3: Main Floor Plan 16. Please show the location of the low roof attic space. Each separate attic space must have a minimum sized access. R807 17. Please dimension the space in front of the WC in the powder room to meet the minimum of 21" clearance. Figure 8307.1 18. Please dimension the intermediate landing on the drawings. R311.5.4 Sheet 5: Foundation Plan 19. The drawings do not show under floor vents within three feet of each corner. Please modify accordingly. Sheet 6: Upper Floor Framing 20. The drawings do not clearly show how the roof area will meet the minimum ventilation requirements as required per code. Please clarify on the drawings. Sheet 7: Roof Framing 21. Please clarify how the minimum roof ventilation is being met on the drawings. Please modify accordingly. R806 22. Please clarify the drainage for the roof system. I assume there will be gutters and downspouts but the drawings do not show this. Please modify accordingly. Sheet 8: Details & Sections 23. Please modify the tub and shower note to state 72" and not 70 ". R307.2 ENERGY COMMENTS Sheet 8; Details & Sections Page 4 of 4 EECE#: EDM 07-34 Lowe Residence 24. Please modify the energy table to match the current state energy code. This has changed as of July 1 2007. VENTIALTIONS AND INDOOR AIRQUALTIY COMMENTS (V&IAQC) General 25. Please clarify the locations and the minimum sizes of the whole house fan on the drawings. I was unable to find where this information was specified. Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874- 0562 between 8:00 a.m. and 5:00 p.m. U-12 Hoyt Jeter, P.E. President