20071024104721.pdfo� EDS City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
I9P (425) 771-0220
DATE: October 24, 2007
TO: Kyle Kragseth
Kyle.kragseth@lewisbuilds.com
FROM: Jenny Readwin, Plans Ex iner
RE: Plan Check # 2007-0776
Project: Kragseth new SFR
Project Address: 22706 95"' Place W
During re -review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised
plans/documents (affected sheets only) with a written response to each of the items below to a
Permit Coordinator.
1) Please add the following information to the site plan.
10/24/07 Still need shown on the site plan. Show North garage door landing (36"x 36"
minimum).
You may redline plans or resubmit three (3) new site plans scaled no smaller than 1"=20' and
one on paper no larger than S %2" x 1459
.
2) Based on comments dated September 10, 2007 by Jen Machuga, planner a geotechnical report is
required. Please make sure your geotech addresses all the requirements of IRC chapter 4. See
attached for minimum building department geotech report requirements to assure that the report
covers Building and Planning requirements.
• 10/24/07 Report submitted with this resubmittal dated September 18, 2007 by Earth
Consulting Incorporated references additional reports (Associated Earth Sciences, Earth
Consulting Incorporated ,etc). Please submit 3 copies of each of these reports for the
building permit file.
Please provide letter from Earth Consulting Incorporated stating that they have are not
the Geotechnical Engineer of Record for this project
* Special inspections are required for the following soil bearing verification, placement of
fill and compaction, subsurface drainage installation including footing drains and
temporary and final erosion control. Complete the enclosed special inspection agreement
signed by the owner, the general contractor and the special inspector (Geotechnical
Engineer of Record) and submit to the City for approval prior to issuance.
• Please revise foundation plan to reflect foundation recommendations in the Earth
Consulting Incorporated report dated September 18, 2007.
3) ok
4) ok
5) 10/24/07 new sheet DI needs to be signed by the Architect of Record.
�, ED,V
�A , .: 0
Fsr_ 1840
CITY OF EDMONDS
SPECIAL INSPECTION AND TESTING AGREEMENT
PERMIT # 2M:l 0:Z DATE:
PROJECT SITE ADDRESS: lP 9I/ _ EV
PROJECT NAME:
SPECIAL INSPECTION AGENCY_
*One form must be completed by each Special nspection Agency or
SPECIAL INSPECTIONS REQUIRED: Special inspections are required for this project in accordance
with IBC Chapter 17 or in accordance with IRC R109.2 as applicable. IBC Section 1704.1 requires the
owner or the registered design professional in charge to employ an independent testing/inspection
agency/special inspector to perform required special inspections. The independent agency hired to
perform the duties of special inspection is required to be a registered agency with WABO under the
Special Inspection Registration Program (SIRP). The special inspector shall be a qualified person with
competence for inspection of the particular type of construction or operation requiring special inspection
(SOQ may be required by the Building Official). The owner, registered professional, contractor and
special inspector/agency shall complete the attached form and submit directly to the Building Division.
WORK REQURING SPECIAL INSPECTION: Special inspections will be required for the following
categories of work in accordance with IBC Chapter 17 and IRC R109.2: FOR SPECIFIC
INFORMATION REGARDING REQUIRED SPE AL INSPECTIONS SEE THE STATEMENT OF
SPECIAL INSPECTION ❑ATTACHED PPROVED PLAN SHEET
❑ Fabrication (1704.2)
❑ Xood Construction (1704.6)
❑ Steel Construction (1704.3)
Soils (1704.7)
a Concrete (1704.4)
❑ nits installed in Concrete (1704.13)
❑ Special Moment Resisting Concrete Frames (1704.4)
❑ Reinforcing Steel, Prestressing Steel Tendons (1704.4)
❑ Structural Welding (1704.3.1)
❑ High Strength Bolting (1704.3.3)
❑ Masonry (1704.5)
o Reinforced Gypsum Concrete (1704.4)
❑ Structural Masonry for Seismic Resistance (1708.1)
o Structural Observation (1709)
❑ Insulating Concrete Fill (1704.4)
❑ Spray Applied Fire -Resistive Materials (1704.10)
❑ Piling, Drilled Piers, and Caissons (1704.8, 1704.9)
❑ Shotcrete (1704.4)
❑ Pier Foundations (1707.5)
❑ Structural Steel (1707.2)
❑ Grading, Excavation, Ffll, Proof Rollin (1704.7)
a Smoke -Control Systems (1704.14)
❑ Exterior Insulation and Finish Systems (1704.12)
n Designated Seismic Systems (1707.9)
❑ Mechanical Components (1707.8)
❑ Cold Formed Steel Framing (1707.4)
❑ Storage Racks (1707.6)
❑ Architectural Components (1707.7)
❑ Structural Wood (17073)
❑ Special Cases (1704.13)
❑ Seismic Isolation System (1707.10)
❑
❑ Mastic, Intumescent Fire Resistant Coatings (1704.11)
❑
❑ High Load Diaphragms (1704.6_ L)
❑
BEFORE A PERMIT CAN BE ISSUED: The owner and contractor and special inspector shall
complete this agreement and the attached Special Inspection Information Form, including the required
acknowledgements and return: to the Building Division for approval prior to permit issuance.
W.1BuildinglHANDOU3' ICODESIFORMSISPECIAL INSPECTION AGREEMENT FORM_doc7/07
APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building
Official prior to performing any duties or inspections. The company performing inspections must be
WABO certified as well as the individual completing inspections. When required by the Building
Official, each special inspector shall submit Statement of Qualifications to the City for review. Special
inspectors shall display identification when performing special inspections on the project site. Special
inspection and testing shall meet the minimum requirements of IBC Chapter 17 and the following:
A. Duties and Responsibilities of the Special Inspector
1. OBSERVE WORK
The special inspector shall observe the site work for conformance with the approved (stamped)
plans and specifications and applicable workmanship provisions of the IBC. Architect or
Engineer reviewed shop drawings may be used only as an aid to inspection. Special inspections
are to be performed on a continuous basis—meaning that the special inspector is on site at all
times observing the work requiring special inspection. Periodic inspections are permitted only as
specifically noted in the approved project plans in accordance with IBC Chapter 17, and as
approved by the Building Official.
Continuous Inspection means the same inspector is on site day to day to observe the work
requiring special inspection.
Periodic Inspection means some inspections may be performed on a periodic basis to satisfy the
requirements of continuous inspection, provided these periodic inspections are performed as
outlined in the project plans and specifications, and approved by the Building Official.
2. REPORT NONCONFORMING ITEMS
The special inspector shall bring non -conforming items to the immediate attention of the
contractor and note all such items in the daily field report. Any item not resolved in a timely
manner shall be immediate cause of the special inspector to notify the Building Official by
telephone at (425-771-0220) or in person at City Hall, of the plan deviation, error, change or
omission. It shall also be the duty of the special inspector to promptly notify the engineer or
architect of record.
3. DAILY REPORTS KEPT ON SITE WITH CONTRACTOR
Each special inspector shall complete and sign a daily report for each day's inspections. The daily
reports shall remain at the jobsite with the contractor for review by the. City Building Inspector.
4. WEEKLY REPORTS TO CITY
The special inspector or inspection agency shall furnish the City with weekly reports of tests and
inspections. The project engineer or architect, and others as designated shall also be copied on
reports. Weekly reports must include the following:
• Description and date of daily inspections and tests made with applicable locations
• List of all non -conforming items and locations
• Report on status of non -conforming items (how each was resolved or unresolved)
• Field changes authorized by the Architect, Engineer or City Inspector if not included in
non-conformance items.
W:1Bui1dinglHAND0UT ICODESIFORMSISPECIAI. INSPECTION AGREEMENT FORM.&0/07
5. FINAL CONSTRUCTION REPORT
The special inspector or inspection agency shall submit a final signed report or Certificate of
Compliance to the City stating that all items requiring special inspection and testing were fulfilled
and reported. And, to the best of his/her knowledge the project is in conformance with the
approved plans and specifications, approved change orders and the applicable workmanship
provisions of the IBC. Items not in conformance, unresolved items or any discrepancies in
inspection coverage (i.e., missed inspections, periodic inspection when continuous inspections were
required, etc.) shall be specifically addressed in this report.
B. Contractor Responsibilities
1. NOTIFY THE SPECIAL INSPECTOR OF ALL REQUIRED SPECIAL INSPECTIONS
It is the duty of the contractor to notify the special inspector when work is ready for special
inspection. Note, the items listed on the attached Special Inspection Information Form and as
noted on the approved plans and specifications are required to have special inspections. Adequate
notice shall be provided by the contractor so that the special inspector has time to become familiar
with the project. All work requiring special inspection must be approved prior to concealing or
covering said work.
2. PROVIDE ACCESS TO APPROVED PLANS
The contractor is responsible for providing the special inspector access to approved plans at the
j obsite.
3. RETAIN SPECIAL INSPECTION RECORDS
The contractor is responsible to retain at the jobsite all special inspection records submitted by the
special inspector. These records are to be provided to the City building inspector upon request.
C. City of Edmonds Buildine Division Responsibilities
1. APPROVE SPECIAL INSPECTION
The Building Division shall approve all Special Inspectors and special inspection requirements.
2. MONITOR SPECIAL INSPECTIONS AND APPROVE WEEKLY REPORTS
Work requiring special inspection and the performance of special inspectors shall be monitored
by the City Building Inspector. Building Inspector approval must be obtained prior to placement
of concrete or other similar activities in addition to that of the special inspector.
3. ISSUE CERTIFICATE OF OCCUPANCY
The Building Official may issue a Certificate of Occupancy after all weekly special inspection
reports including the final report have been submitted and accepted by the City.
D. Owner Responsibilities
1. The project owner or the engineer or architect of record acting as the owner's agent shall fund
special inspection services.
E. Engineer or Architect of Record Responsibilities
1. Prepare Statement of Special Inspections in accordance with IBC Section 1705.
2. Review the special inspection reports and provide corrective action for work that may not
conform to the approved plans.
WABuildinglHANDOUT ICODESIFORMSISPECIAL INSPECTION AGREEMENT FORM.doc7/07
Owner name
ACKNOWLEDGEMENTS
I have read and agree to comply with the terms and conditions ofthis agreement.
(please print or type)
Signature Date
General Contractor Company/Owner name
Signature.
Special Inspector/Agency name
Signature
(please print or type)
Date
(please print or type)
Architect/Engineer of Record name
(please print or type)
Signature,
Return the original signed agreement to the Building Division
City of Edmonds Building Division
121 Stn Avenue North, City Hall Second Floor
Edmonds, WA 98020
Date
Date
ACCEPTED BY CITY OF EDMONDS BUILDING DIVISION:
City Official Signature Date
Title:
...............
_
:REQUIRED SPECIAL INSPECTIONS FOR THIS PROJECT:
1) Soil bearing verification
2) Placement of fill & compaction
3j Subsurface Drainage Installation Including Footing
Drains .
4) Temporary and Final Erosion Control
W:\BuildinglRANDOUT ICODESIFORMSISPECIAL INSPECTION AGREEMENT FORM_do0/07