20071048 - Valhalla - grading.pdf
City of Edmonds
TH
121 5 AVENUE NORTH EDMONDS, WA 98020 (425) 771-0220 FAX(425) 771-0221
Website: www.ci.edmonds.wa.us
DEVELOPMENT SERVICES DEPARTMENT
Planning Building Engineering
CIVIL Plan Review Corrections
Application : bld20071048 (grading)Date:
# bld20070040-20070645 (townhomes) April 22, 2008
Project Name/Address:
Valhalla / 23004 Edmonds Way
Contact Person/Address, Fax or E-mail:
Lesley Brown / lesleyb@adshapiro.com
Reviewer: Jeanie McConnellDivision:Engineering
During review of the above noted application, it was found that the following information, corrections, or
clarifications are needed. Please redline plans or submit three (3) sets of revised plans/documents with a
written response to each of the items below to Marie Harrison.
GENERAL
Review Comments #1 9/10/07
Review Comments #2 12/5/07
Review Comments #3 2/22/08
Review Comments #4 3/24/08
Review Comments #5 4/22/08
th
Please note, I will be out of the office April 23-29. Please contact Ed Sibrel with any questions you may
have regarding your project. Ed can be reached at 425-771-0220 or by e-mail at
sibrel@ci.edmonds.wa.us. Ed is prepared to review the remaining items needed prior to issuance of your
permit. Permit submittals should still be made directly to Marie Harrison.
1.4/22/08 - The cost estimate was e-mailed to me today. I have reviewed the submittal and the following
changes need to be made and resubmitted to the City for review. Once the cost estimate has been approved
the inspection fees and appropriate bond amount will be established for the project. Please add the
following items to the cost estimate:
a.Storm drainage facilities, including piping and structures.
b.Frontage improvements, including but not limited to curb, gutter, sidewalk, & asphalt widening.
c.Retaining walls, shoring, eco blocks, etc.
d.Traffic control
e.Erosion and sedimentation control
This list is not all inclusive. All civil site improvements are to be included in the cost estimate.
DATE E-MAILED 4/22/08 PAGE
1 of 2
2.9/10/07 comment - Please provide a traffic control and haul route plan. Traffic control shall be shown for
nd
work on SR104 as well as 232.
12/5/07 response letter states this will be provided by contractor. To date, City has not received.
o
2/22/08 To date, City has not received.
o
3/24/08 Thank you for submitting a traffic control plan. Please revise and resubmit per the following:
o
nd
a.TCP plan shall show 232 St SW & SR-104 intersection.
b.Please remove signage from 2-way left turn lane.
nd
c.Provide TCP for work on 232 St SW.
d.Will only 400 of the east bound travel lane be closed at one time? The traffic control plan calls
out a 400 closure.
4/22/08 I was not been able to find a revised traffic control plan with the latest submittal. Please
o
revise as requested. No work shall commence in the City right-of-way prior to approval of the
traffic control plan.
Please contact me at 425-771-0220 or by e-mail at mcconnell@ci.edmonds.wa.us if you have specific
questions regarding these plan corrections.
DATE E-MAILED 4/22/08 PAGE
2 of 2