Loading...
20071113112102.pdfor Eb,� City of Edmonds � �ro PLAN REVIEW COMMENTS BUILDING DIVISION Fsr. z a9° (425) 771-0220 DATE: November 13, 2007 TO: Stephen and Diana White Diana.white 1 @comcast.net FROM: Jenny Readwin, Plans amin RE: Plan Check # 2007-1046 Project: White Addition/Remodel Project Address: 831 Northstream Lane During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) Please add the following information to the site plan. ■ Proposed keystone or rockery wall is proposed along the East property line. Please specify type of wall to be used (requirements vary between retaining walls and rockeries -see handouts) and specify top and bottom wall elevations. ■ Plans shows new cover over reconstructed deck. Please clarify portion of deck to be "re- constructed" (Le. entire deck? Just area under the cover?) and provide structural plans accordingly. You may redline plans or resubmit three (3) new site plans scaled no smaller than 1"=20' and one on paper no larger than 8 %" x 14". 2) Show how island sink will be vented through the roof or with a loop vent as permitted by UPC 909.0.Air admittance valves are not permitted unless first approved by the Building Official under and alternate method per UPC 301.2. 3) Special inspections are required for the following. Complete the enclosed special inspection agreement signed by the owner, the general contractor and the special inspector and submit to the City for approval prior to issuance. Special Inspector must be a Licensed Engineer or WABO certified inspector. • Epoxy or Expansion anchors or holdowns 4) See attached structural comments from city consultant. Respond to each item in writing. Eagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359 hoAeter@centurytel.net 360 874 0562 To: Marie Harrison 121 5th Ave N Edmonds, WA, 98020 Re: White Residence 831 Northstream Lane Edmonds, WA, 98020 Plan Review # 2007-1046 Date: 26 October 2007 EECE # EDM 0753 Structure Stated Area S.F. xistin Lower Floor ? Existing. Upper Floor ? New Upper Floor 1471 Total ? New Garage 678 Total ? Deck 118 rand total ? The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the Ordinance, Structural, V&IAQC, and Energy requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. ORDINANCE COMMENTS Sheet A2.1 UPPER FLOOR PLAN: 1. Please specify the required landing outside the Master Bedroom exterior door. R311.4.3 Page 2 of 4 EECE#: EDM 07-53 # 2007-1046 White Residence Addition and Remodel 2. Please note that the window next to the tub in the Master Bathroom shall be safety glazing. R308.4 3. It appears that there is anew fireplace. Please specify the type of fireplace, and how the required ventilation will be achieved. 4. Please provide deck and guardrail details for the new deck. R312 Sheet A2.2 LOWER FLOOR PLAN: 5. Please specify the required landing outside the Garage exterior door. R311.4.3 Sheet A2.3 ROOF PLAN: 6. Please provide details for new skylight. 8308.6.8 7. Please clarify how the roof drainage is being accomplished. It appears, for example, that the roof area around the skylight appears to be a low -slope (nearly flat) roof. R903.4 8. Please provide an attic space ventilation calculation and show the required attic space ventilation on the new addition roof. R806.1 9. Please clarify how the existing attic ventilation will not be negatively affected by the new addition. Sheet A5.1 FOUNDATION PLAN: 10. Please show locations of the crawl space vents in the new crawl space area. 11. Please clarify how the existing crawl space ventilation will not be negatively affected by the new addition. 12. Please specify the required minimum crawl space clearance to the bottom of the joists and to the bottom of the beams. 8319.1 13. Please specify the location of the required crawl space access. R408.4 Sheet A7.1 UPPER FLOOR ELECTRICAL PLAN: 14. Please add an additional smoke alarm in the area giving access to the (3) existing bedrooms. R313.2 15. Please specify that all the smoke alarms in the house will be hard -wired together and that the system will be supplied with a battery back-up system in the event of the power supply fail. R313.2.1 Page 3 of 4 EECE#: EDM 07-53 # 2007-1046 White Residence Addition and Remodel STRUCTURAL COMMENTS Sheet A2.1 UPPER FLOOR PLAN: 16. Please provide deck and guardrail details for the new deck. Table R301, R502.2.2 Sheet A5.1 FOUNDATION PLAN: 17. Please specify the size of the beam on the drawings. Sheet A5.2 FLOOR FRAMING PLAN: 18. Please specify the required connection of the 4x8 beams to the concrete wall. 19. Please specify the required connection of the 4x 10 to the 4x 12 beam. 20. Please specify the required connection of the 4x12 to the 7x18 PSL. 21. Please clarify the vertical support of the 4x12 at the double 2x1 Os 22. Please provide a section detail at the wall between the 18 TJIs and the 11-7/8 TJIs 23. Please clarify the support of the 2x 10 deck joists to the wall. Sheet A5.3 FLOOR FRAMING PLAN: 24. It is not clear what is supporting the 5-114x14 PSL. Please clarify. 25. Please specify the required connection of the 5-118x12 Glulam beam to the post. 26. Please specify the required connection of the 3-1/8x9 Glulam beam to the beam. 27. Please specify the required connection of the 2x8 rafter to the Glulam beam. 28. Please specify the required connection of the 2x8 rafter to the exterior wall. 29. Please specify the required beam and connection below the 3-1/2x9 Glulam at the corner of the new roof. 30. Please specify the required connection of the 3-112x9-1/4 PSL to the corner at the Living room windows. 31. Please specify the required beam over the window at the north-west wall of the Living room. 32. Please specify the required support of the 3-1/2x11-114 PSL. Page 4 of 4 EECE#: EDM 07-53 # 2007-1046 White Residence Addition and Remodel Sheet S-3 DETAILS: 33. Detail 16: Please specify the required hurricane hanger for the connection of the rafter to the beam. Sheet S-4 DETAILS: 34. Shear Wall Schedule: Wall type P1-2 requires a single 3 -inch nominal wide member or wider. Please revise accordingly. IBC Table 2306.4.1 Footnote E ENERGY CODE GENERAL 35. Please specify the required vapor barrier at the new crawl space. WSEC 502.1.6.2 Sheet A3.2 NORTH & EAST ELEVATONS: 36. Please specify the required U -values for the windows. Include the skylight. Note 13d states `minimum per code'. VENTILATION & INDOOR AIR QUALITY CODE (V&IAQC) 37. Please add an additional exhaust fan in the new Master Bath area. One is needed in the vicinity of the tub and shower area. 38. Please clarify the location and size of the required whole house fan. WSVIAQ 39. Please specify the locations of the required radon vents WSVIAQ 502.1.2 Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874-0562 between 8:00 a.m. and 5:00 p.m. Hoyt Jeter, P.E. President of EDAf Fsr_ Igo') CITY OF EDMONDS SPECIAL INSPECTION AND TESTING AGREEMENT PERMIT # z-00-7 10DATE: PROJECT SITE ADDRESS: 251 PROJECT NAME.• SPECIAL INSPECTION AGENCY *One form must be completed by each Special Inspection Agency or Inspector. SPECIAL INSPECTIONS REQUIRED: Special inspections are required for this project in accordance with IBC Chapter 17 or in accordance with IRC R109.2 as applicable. IBC Section 1704.1 requires the owner or the registered design professional in charge to employ an independent testing/inspection agency/special inspector to perform required special inspections. The independent agency hired to perform the duties of special inspection is required to be a registered agency with WABO under the Special Inspection Registration Program (SIRP). The special inspector shall be a qualified person with competence for inspection of the particular type of construction or operation requiring special inspection (SOQ may be required by the Building Official). The owner, registered professional, contractor and special inspector/agency shall complete the attached form and submit directly to the Building Division. WORK REQURING SPECIAL INSPECTION: Special inspections will be required for the following categories of work in accordance with IBC Chapter 17 and IRC R109.2: FOR SPECIFIC INFORMATION REGARDING REQUIRED SPECIAL INSPECTIONS SEE THE STATEMENT OF SPECIAL INSPECTION ❑ATTACHED ❑APPROVED PLAN SHEET ❑ Fabrication (1704.2) u Wood Construction ( t 704.6) ❑ Steel Construction (1704-3) oSpils (1704.7) ❑ Concrete (1704.4) olts installed in Concrete (1704.13) a Special Moment Resisting Concrete Frames (I 704A) ❑ Reinforcing Steel, Prestressing Steel Tendons (1704.4) ❑ Structural Welding() 704.3.1) ❑ High Strength Bolting (1704.3.3) ❑ Masonry (1704.5) ❑ Reinforced Gypsum Concrete (1704.4) ❑ Structural Masonry for Seismic Resistance (1708.1) ❑ Structural Observation (1709) ❑ Insulating Concrete Fill (1704.4) ❑ Spray Applied Fire -Resistive Materials (1704.10) • Piling, Drilled Piers, and Caissons (1704.8, I704.9) ❑ Shotcrete (1704.4) ❑ Pier Foundations (1707.5) ❑ Structural Steel (1707.2) ❑ Gradin , Excavation, Fill, Proof Rollin (1704.7) ❑ Smoke -Control Systems (1704.14) ❑ Exterior Insulation and Finish Systems (1704.12) ❑ Designated Seismic Systems (I707.9) ❑ Mechanical Components (1707.8) a Cold Formed Steel Framing (1707.4) ❑ Stora e Racks (1707.6) ❑ Architectural Components (1707.7) ❑ Structural Wood (I707.3) ❑ Special Cases (1704.13) ❑ Seismic Isolation System (1707.10) ❑ ❑ Mastic, Intumescent Fire Resistant Coatings (1704.11) ❑ ❑ High Load Diaphragms (1704.6.1) ❑ BEFORE A PERMIT CAN BE ISSUED: The owner and contractor and special inspector shall complete this agreement and the attached Special Inspection Information Form, including the required acknowledgements and return to the Building Division for approval prior to permit issuance. W:1BuildinglHANDOUI" ICODESIFORMSISPECIAL INSPECTION AGREEMENT FORM.doc7/07 .APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building Official prior to performing any duties or inspections. The company performing inspections must be WABO certified as well as the individual completing inspections. When required by the Building Official, each special inspector shall submit Statement of Qualifications to the City for review. Special inspectors shall display identification when performing special inspections on the project site. Special inspection and testing shall meet the minimum requirements of IBC Chapter 17 and the following: A. Duties and Responsibilities of the Special Inspector 1. OBSERVE WORK The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions, of the IBC. Architect or Engineer reviewed shop drawings may be used only as an aid to inspection. Special inspections are to be performed on a continuous basis ---meaning that the special inspector is on site at all times observing the work requiring special inspection. Periodic inspections are permitted only as specifically noted in the approved project plans in accordance with IBC Chapter 17, and as approved by the Building Official. Continuous Inspection means the same inspector is on site day to day to observe the work requiring special inspection. Periodic Inspection means some inspections may be performed on a periodic basis to satisfy the requirements of continuous inspection, provided these periodic inspections are performed as outlined in the project plans and specifications, and approved by the Building Official. 2. REPORT NONCONFORMING ITEMS The special inspector shall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report. Any item not resolved in a timely manner shall be immediate cause of the special inspector to notify the Building Official by telephone at (425-771-0220) or in person at City Hall, of the plan deviation, error, change or omission. It shall also be the duty of the special inspector to promptly notify the engineer or architect of record. 3. DAILY REPORTS KEPT ON SITE WITH CONTRACTOR Each special inspector shall complete and sign a daily report for each day's inspections. The daily reports shall remain at the jobsite with the contractor for review by the City Building Inspector. 4. WEEKLY REPORTS TO CITY The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also he copied on reports. Weekly reports must include the following: + Description and date of daily inspections and tests made with applicable locations • List of all non -conforming items and locations • Report on status of non -conforming items (how each was resolved or unresolved) + Field changes authorized by the Architect, Engineer or City Inspector if not included in non-conformance items. W:1Bui1dinglHANDOUT ICODESIFORMSISPECIAL INSPECTION AGREEMENT FORM.doc7/07 5. FINAL CONSTRUCTION REPORT The special inspector or inspection agency shall submit a final signed report or Certificate of Compliance to the City stating that all items requiring special inspection and testing were fulfilled and reported. And, to the best of his/her knowledge the project is in conformance with the approved plans and specifications, approved change orders and the applicable workmanship provisions of the IBC. Items not in conformance, unresolved items or any discrepancies in inspection coverage (i.e., missed inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically addressed in this report. B. Contractor Responsibilities 1. NOTIFY THE SPECIAL INSPECTOR OF ALL REQUIRED SPECIAL INSPECTIONS It is the duty of the contractor to notify the special inspector when work is ready for special inspection. Note, the items listed on the attached Special Inspection Information Form and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. All work requiring special inspection must be approved prior to concealing or covering said work. 2. PROVIDE ACCESS TO APPROVED PLANS The contractor is responsible for providing the special inspector access to approved plans at the jobsite. 3. RETAIN SPECIAL INSPECTION RECORDS The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City building inspector upon request. C. City of Edmonds Building Division Responsibilities 1. APPROVE SPECIAL INSPECTION The Building Division shall approve all Special Inspectors and special inspection requirements. 2. MONITOR SPECIAL INSPECTIONS AND APPROVE WEEKLY REPORTS Work requiring special inspection and the performance of special inspectors shall be monitored by the City Building Inspector. Building Inspector approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. ISSUE CERTIFICATE OF OCCUPANCY The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports including the final report have been submitted and accepted by the City. D. Owner Responsibilities 1. The project owner or the engineer or architect of record acting as the owner's agent shall fund special inspection services. E. Engineer or Architect of Record Responsibilities I. Prepare Statement of Special Inspections in accordance with IBC Section 1705. 2. Review the special inspection reports and provide corrective action for work that may not conform to the approved plans. WABuilding\HANDOUT ICODESIFORMSISPECIAL INSPECTION AGREEMENT FORM_doc7/07 ACKNOWLEDGEMENTS Z have read and agree to comply with the terms and conditions of this agreement Owner name (please print or type) Signature Date General Contractor Company/Owner name Signature (please print or type) Date Special Inspector/Agency name (please print or type) Signature Date Architect/Engineer of Record name (please print or type) Signature Date Return the original signed agreement to the Building Division City of Edmonds Building Division 121 5th Avenue North, City Hall Second Floor Edmonds, WA 98020 ACCEPTED BY CITY OF EDMONDS BUILDING DIVISION: City Official Signature Date Title: WA1BuildinglHANDOUT 1CODESIFORMSISPECIAL INSPECTION AGREEMENT FORM_doc7/47