Loading...
20071120135828.pdfo� EDS City of Edmonds O d PLAN REVIEW COMMENTS BUILDING DIVISION �Sf i s9° (425) 771-0220 DATE: November 20, 2007 TO: Landsverk Quality Homes Lgh.inc@comeast.net FROM: Jenny Readwin, Plans Eamine .. RE: Plan Check # 2007-0860 Project: SFR Project Address: 9007 196' Street SW During re -review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) ok 2) 11120/07 Still Need. Show how island sink will be vented through the roof or with a loop vent as permitted by UPC 909.0.Air admittance valves are not permitted unless first approved by the Building Official under and alternate method per UPC 301.2. 3) 11120107 See comments below. See attached structural comments from city consultant. Respond to each item in writing. I I t Ile g e lwader is supporting a point ltd from thehas not beep bladed ire the design of this hea&r. please cls on the response. Response to item 11 above was I fail to see a point load on a garage header. There does appear to be a point load on the single car garage header from the large girder truss running East and West (see sheet 5). 15, "IU d ram s do not show any method to comet the beam to the supporting post, A motive connection is mq* d to be added w the d vdnp to prevent lat= tai do . plea add this Wormadon to the draw Response referred to detail A4 on page 6. First at the base the A23 must be on both sides and secondly please cross reference ALL details on page 6 to their location on the plans. 19. EOR, please provide a detail at the intense ion iDf the triple ,joist double joist and the girder beams at the nock area. New detail was provided (D2/6) again this needs to be referenced to it's location on the plans as well as all other. details on page 6.