Loading...
20071212110514.pdfof Epo City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION gst 18go (425) 771-0220 DATE: December 12, 2007 TO: Jerry and Sally Epler. Jerry.cpler@gte.net FROM: Jenny Readwin, Plans EC ami Plan Check # 2007-1031 Project: Epler Sunroom Project Address: 812 Pine Street During re -review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) ok 2) ok 3) ok 4) ok 5) 12/12/07 Still need. Pack should be stamped by a Washington State Licensed Engineer with all applicable information showing thatpanels are designed to the City of Edmonds Design Criteria (25 mph snow load, 85 mph wind load and seismic design category D2). Provide manufactures specifications and installation instructions for proposed pre -manufactured roof panels. 6) 12/12/07 Still Need. Proposed structure does not meet conventional construction. Provide complete gravity and lateral calculations for proposed sunroom stamped and signed by a Washington State Licensed Professional Engineer. The Engineer you choose needs to take into account known organic soils in this area when designing the foundation and the pre - manufactured roof panels when designing the roof supports. 7) 12/12/07 Still Need. Due to the known organic soils in your area special inspection is required for soil bearing verification. Complete the enclosed special inspection agreement signed by the owner, the general contractor and the special inspector (Washington State Licensed Professional Engineer) and submit to the City for approval prior to issuance.