Loading...
20071212154926.pdfof EBS City of Edmonds d PLAN REVIEW COMMENTS BUILDING DIVISION �sr 3 ado (425) 771-0220 DATE: December 12, 2007 TO: Ben Holt ben@peoples-storage.com FROM: Jenny Readwin, Plans E amin RE: Plan Check # 2007-1100 Project. SFR Project Address: 1141 Sea Vista Place During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) Please add the following information to the site plan. ■ Please choose alternate datum point (i.e. fire hydrant -specify top or bottom, etc.) not located in the middle of 9th Ave. The datum point chosen will be too dangerous for the building inspector to perform height inspection. You may redline plans or resubmit three (3) new site plans scaled no smaller than 1 "=20' and one on paper no larger than 8 I/z" x 14". 2). Provide eco block shoring detail and a separate site plan showing locations of the temporary shoring walls or show how max 1:1 temporary cuts will be done as required by the Geotechnical Engineer of Record.. If their height exceeds 4' then structural calculations and peer review will be required. 3) Special inspections are required for the following. Complete the enclosed special inspection agreement signed by the owner, the general contractor and the special inspector and submit to the City for approval prior to issuance. • SOIL CUTS • TEMPORARY ECO BLOCK SHORING • FOUNDATION SUB -GRADE VERIFICATION • RETAINING WALL/ROCKERY PLACEMENT • PLACEMENT OF FILL AND COMPACTION (INCLUDING SWIMMING POOL) 0 SUBSURFACE DRAINAGE INSTALLATION • TEMPORARY AND PERMANENT EROSION CONTROL 4) See attached structural comments from city consultant. Respond to each item in writing. Eagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359 hoytjeter@centurytel.net 360 874 0562 Fax 360 874 0591 To: Theresa Umbaugh 121 5th Avenue Edmonds, WA 98020 Re: Holt Residence 1141 Sea Vista Place Edmonds, WA 98020 Plan Review # 2007-1100 21 November 15, 2007 EECE # EDM 07-59 Structure Area S.F. Lower floor Finished 1346 Lower Floor Unfinished 874 Main Floor 3934 Total 6154 Garage/storage 1556 Total 7707 Covered porch 919 Deck 761 Grand total 9387 Sprinklers 7707 The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the Ordinance, Structural, V&IAQC, and Energy Code requirements of this project. The project was reviewed under guidelines and regulations for residential facilities of the State of Washington Building Code All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Page 2 of 5 EECE#: EDM 07-59 Edmonds #: BLD2007-1100 Holt Residence ORDINANCE COMMENTS General 1. Please specify on the drawings that the all penetrations through the separation wall between the house and the garage shall be protected by filling the opening around the penetrating item with approved material to resist the free passage of flame and products of combustion. 8309.1.2 Sheet 1: Main Floor Plan 2. Please specify that the window next to the tub in the Master Bath shall be safety glazing. 8308.4 3. Please specify the required stair illumination on the drawings. 8303.6 4. Please specify the location of the required light activation at the top of the stairway. 8303.6.1 5. Please clarify how the Living Room gas fireplace will be vented to the exterior. 6. It appears that the Dining room window closest to the Living Room is required to be safety glazed, per its proximity to the door. R308.4 7. It appears that the Master Suite window closest to the French door is required to be safety glazed. R308.4 Sheet 2: Lower Floor Plan 8. Please add a smoke alarm in the Guest Room. 8313.2 9. Please add a smoke alarm in the area giving access to the Guest Room. R313.2 10. It appears that the Media window closest to the French door is required to be, safety glazed. 8308.4 11. Please specify the required stair illumination on the drawings. R303.6 12. Please clarify how the Media room gas fireplace will be vented to the exterior. Sheet 3: Roof Framing Plan 13. Please show the location of required roof ventilation (each roof jack, or similar). 14. Please specify the required roofing assembly on this sheet, Details on Sheet 4 state `per plan'. Page 3 of 5 EECE#: EDM 07-59 Edmonds #: BLD2007-1100 Holt Residence STRUCTURAL COMMENTS General 15. Please submit the original geotechnical report, dated October 31, 2006, as referenced by the letter by the geotechnical engineer dated October 17, 2007. 16. Please note that the bottom chord of the pre -manufactured trusses shall be designed to resist 20 lbs per square foot live load. R301.5 footnote B Sheet 5 ELEVATIONS: 17. Please specify the required connection of the tile roof on the drawings. Nothing is shown at this time. 8905.3 Sheet 1 MAIN FLOOR PLAN: 18. EOR, please verify the hold down specified at the corners of the library. The hold down specified is smaller on one ,side than the other. Submit an analysis to justify the smaller hold down. Lateral forces will be applied in either direction. 19. EOR, the drawings do not show any collector element to drag the horizontal diaphragm force into the interior shear wall specified on the drawings. Please clearly add to the drawing the required collector elements in order to transfer the lateral forces. 20. EOR, please specify the required spacing of the vertical post and attachment for the glass guard rail support. Nothing is shown to show how the code required design forces will be resisted. Please add this information. 21. EOR please provide analysis for the 4x8 beam over the large picture window at the Living Room. Per dead loads and live loads per calculations, it appears that deflection here may exceed the code minimum. Sheet 2 BASEMENT & FOUNDATION PLAN: 22. Please specify the number of studs required to support each side of beam #15. It is not clear at this time. 23. EOR, please specify the required connection of the 5 -1.8x13 -1I2 at the beam pocket. Nothing is specified at this time. 24. Please specify the required connection of the cantilever beam to the supporting member. Nothing is specified at this time. 25. EOR, please provide an analysis for the 2x8 ledger supporting the deck loads. Page 4 of 5 EECE#: EDM 07-59 Edmonds #: BLD2007-1100 Holt Residence 26. All beams that are supported by posts, including built-up posts and in -wall posts, shall clearly note the required connections on the drawings. Currently this is not clearly noted on the drawings. Please note all required post to beam connections on the drawings. 27. EOR, the analysis for the glu-lam beams in the garage appear not to include the point loads from the glu-lam beams. For example, glu 1am beam mark 19 is supporting beams marks 10, 11, and 14. Please modify accordingly. 28. The analysis shows there will be an uplift force required to be resisted on the back span. Currently there aren't any connections specified to resist this loads -Beam 9 is an example. Please clearly specify the required connections to resist the code prescribed forces. 29. EOR, please specify the required number of studs to support the multiple joists on the interior wall. A single stud will not support the design loads under conventional framing. .30. EOR, please provide analysis for the 28" diameter footing supporting two posts at the dropped deck. 31. EOR, please provide calculations for the exterior spread footing supporting the floor and the roof trusses. The prescriptive foundations widths are when the IRC spans are met. This is not the case for this house. A foundation design is required to show compliance. IBC 1801.2 32. AOR please provide analysis for the 2xl2 @ 16" OIC spanning over 15 feet. Also note the floor joist are supporting tile floor and this will have a larger dead load than typical framed floors. 33. Please specify the required connection for the (3) 2xl2's to the post. Sheet 3 ROOF FRAMING PLAN: 34. EOR, please provide calculations for the exterior studs to support the truss spanning 64 feet. All load combinations shall be included when analyzing the exterior stud wall. The engineer has only done the shear wall design in plane but out of plane forces must also be checked to support the roof framing members and all load combinations. Sheet 4 Details: 35. EOR, please provide an analysis of the deck details shown on this sheet. The notes are per the old UBC and not the adopted code at this time. Page 5 of 5 EECE#: EDM 07-59 Edmonds #: BLD2007-1100 Holt Residence 36. Deck detail: Please provide an analysis for the !/2" diameter lag bolts at 16" o.c. Also, it is not clear what the lag bolts are connecting to in order to support the design loads. 37. Please note the vertical reinforcement shall have a 90 degree hook in the footing or submit an analysis to justify straight bar embedment. Sheet S: LATERAL ANALYSIS/TYPICAL DETAILS: 38. EOR, please submit a design analysis for the full -height cantilevered retaining wall. IBC 1806.5 U IIig lu ! �l►Y IF.y Prescriptive method used. No Comments at this time. VENTILATION & INDOOR AIR QUALITY CODE (V&IAQC) Sheet 1 MAIN FLOOR PLAN: 39. Please specify the required fan in the Guest Bath toilet room. 40. Please specify the CFM of the kitchen hood vent. Sheet 2 BASEMENT FLOOR PLAN: 41. Please specify the CFM of the recreation room kitchen hood vent. Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plait review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874- 0562 between 8:00 a.m. and 5:00 p.m. By: Hoyt Jeter, P.E. President CITY OF EDMONDS SPECIAL INSPECTION AND TESTING AGREEMENT PERMIT 9 �, awl �(� V _ DATE: PROJECT SITE ADDRESS: ��Srl✓ PROJECT NAME:' SPECIAL INSPECTION AGENCY_ i(� 1(�AC�- + *One form must be completed by each Special Inspection Agency or Inspector. SPECIAL INSPECTIONS REQUIRED: Special inspections are required for this project in accordance with IBC Chapter 17 or in accordance with IRC R109.2 as applicable. IBC Section 1704.1 requires the owner or the registered design professional in charge to employ an independent testing/inspection agency/special inspector to perform required special inspections. The independent agency hired to perform the duties of special inspection is required to be a registered agency with WABO under the Special Inspection Registration Program (SIRP). The special inspector shall be a qualified person with competence for inspection of the particular type of construction or operation requiring special inspection (SOQ may be required by the Building Official). The owner, registered professional, contractor and special inspector/agency shall complete the attached form and submit directly to the Building Division. WORK REQURING SPECIAL INSPECTION: Special inspections will be required for the following categories of work in accordance with IBC Chapter 17 and IRC R109.2: FOR SPECIFIC INFORMATION REGARDING REQUIRED SPE IAL INSPECTIONS SEE THE STATEMENT OF SPECIAL INSPECTION ❑ATTACHED VPPROVED PLAN SHEET L3 fabrication (1704.2) ❑ Wood Construction (1704.6) ❑ Steel Construction (1704.3) ❑ Soils (1704.7) ❑ Concrete (1704.4) ❑ Bolts installed in Concrete (t704.13) ❑ Special Moment Resisting Concrete Frames (1704.4) o Reinforcing Steel, Prestressing Steel Tendons (1704.4) ❑ Structural Welding (1704.3. 1) ❑ High Strength Bolting (1704.3.3) ❑ Masonry (1704.5) ❑ Reinforced Gypsum Concrete (1704.4) ❑ Structural Masonry for Seismic Resistance (1708.1) ❑ Structural. Observation (1709) ❑ Insulatin Concrete Fill (1704.4) ❑ Sppy SprayA lied Fire -Resistive Materials (1704.10) ❑ Piling, Drilled Piers, and Caissons (1704.8, 1704.9) ❑ Shotcrete (1704.4) n Pier Foundations (1707.5) ❑ Structural Steel (1707.2) ❑ Grading, Excavation, Fill, Proof Rollin (1704.7) ❑ Smoke -Control Systems (1704.14) ❑ Exterior Insulation and Finish Systems (1704.12) ❑ Designated Seismic Systems (1707.9) ❑ Mechanical Components (1707.8) ❑ Cold Formed Steel Framing (1707.4) ❑ Storage Racks (1707.6) ❑ Architectural Components (1707.7) ❑ Structural Wood (1707.3) o Special Cases (1704.13) n Seismic Isolation System (1707.10) ❑ ❑ Mastic, Intumescent Fire Resistant Coatings (1704.11) ❑ ❑ High Load Diaphragms (1704.6.1) ❑ V BEFORE A PERMIT CAN BE ISSUED: The owner and contractor and special inspector shall complete this agreement and the attached Special Inspection Information Form, including the required acknowledgements and return to the Building Division for approval prior to permit issuance. W_1BuildinglHANDOUi' ICODESIFORMSISPECIAL INSPECTION AGREEMENT FORM.doc7/07 r APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building Official prior to performing any duties or inspections. The company performing inspections must be WABO certified as well as the individual completing inspections. When required by the Building Official, each special inspector shall submit Statement of Qualifications to the City for review. Special inspectors shall display identification when performing special inspections on the project site. Special inspection and testing shall meet the minimum requirements of IBC Chapter 17 and the following: A. Duties and Responsibilities of the Special Inspector I. OBSERVE WORK The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC. Architect or Engineer reviewed shop drawings may be used only as an aid to inspection. Special inspections are to be performed on a continuous basis ---meaning that the special inspector is on site at all times observing the work requiring special inspection. Periodic inspections are permitted only as specifically noted in the approved project plans in accordance with IBC Chapter 17, and as approved by the Building Official. Continuous Inspection means the same inspector is on site day to day to observe the work requiring special inspection. Periodic Inspection means some inspections may be performed on a periodic basis to satisfy the requirements of continuous inspection, provided these periodic inspections are performed as outlined in the project plans and specifications, and approved by the Building Official. 2. REPORT NONCONFORMING ITEMS The special inspector shall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report. Any item not resolved in a timely manner shall be immediate cause of the special inspector to notify the Building Official by telephone at (425-771-0220) or in person at City Hall, of the plan deviation, error, change or omission. It shall also be the duty of the special inspector to promptly notify the engineer or architect of record. 3. DAILY REPORTS KEPT ON SITE WITH CONTRACTOR Each special inspector shall complete and sign a daily report for each day's inspections. The daily reports shall remain at the jobsite with the contractor for review by the City Building Inspector. 4. WEEKLY REPORTS TO CITY The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports must include the following: • Description and date of daily inspections and tests made with applicable locations • List of all non -conforming items and locations • Report on status of non -conforming items (how each was resolved or unresolved) • Field changes authorized by the Architect, Engineer or City Inspector if not included in non-conformance items. W-1BuildinglHANDOUT ICODESTORMSISPECIAL INSPECTION AGREEMENT FORM.doc7107 5. FINAL CONSTRUCTION REPORT The special inspector or inspection agency shall submit a final signed report or Certificate of Compliance to the City stating that all items requiring special inspection and testing were fulfilled and reported. And, to the best of his/her knowledge the project is in conformance with the approved plans and specifications, approved change orders and the applicable workmanship provisions of the IBC. Items not in conformance, unresolved items or any discrepancies in inspection coverage (i.e., missed inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically addressed in this report. B. Contractor Responsibilities 1. NOTIFY THE SPECIAL INSPECTOR OF ALL REQUIRED SPECIAL INSPECTIONS It is the duty of the contractor to notify the special inspector when work is ready for special inspection. Note, the items listed on the attached Special Inspection Information Form and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall he provided by the contractor so that the special inspector has time to become familiar with the project. All work requiring special inspection must be approved prior to concealing or covering said work. 2. PROVIDE ACCESS TO APPROVED PLANS The contractor is responsible for providing the special inspector access to approved pians at the jobsite. 3. RETAIN SPECIAL INSPECTION RECORDS The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City building inspector upon request. C. City of Edmonds Building Division Responsibilities 1. APPROVE SPECIAL INSPECTION The Building Division shall approve all Special Inspectors and special inspection requirements. 2. MONITOR SPECIAL INSPECTIONS AND APPROVE WEEKLY REPORTS Work requiring special inspection and the performance of special inspectors shall be monitored by the City Building Inspector. Building Inspector approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. ISSUE CERTIFICATE OF OCCUPANCY The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports including the final report have been submitted and accepted by the City. D. Owner Responsibilities 1. The project owner or the engineer or architect of record acting as the owner's agent shall fund special inspection services. E. Engineer or Architect of Record Responsibilities 1. Prepare Statement of Special Inspections in accordance with IBC Section 1705. 2. Review the special inspection reports and provide corrective action for work that may not conform to the approved plans_ W:1BuildinglHANDOUT ICODESIFORMSISPECIAL INSPECTION AGREEMENT FORM_doc7/07 ACKNOWLEDGEMENTS I have read and agree to comply with the terms and conditions of this agreement Owner name (please print or type) Signature, General Contractor Company/Owner name Date (please print or type) Signature Date _ Special Inspector/Agency name (please print or type) Signature Date Architect/Engineer of Record name (please print or type) Signature Date Return the original signed agreement to the Building Division City of Edmonds Building Division 1215"' Avenue North, City Hall Second Floor Edmonds, WA 95020 ACCEPTED BY CITY OF EDMONDS BUILDING DIVISION: City Official Signature Date Title: • SOIL CUTS • TEMPORARY ECO BLOCK SHORING • FOUNDATION SUB -GRADE VERIFICATION • RETAINING WALL/ROCKERY PLACEMENT • PLACEMENT OF FILL AND COMPACTION (INCLUDING SWIMMING POOL) • SUBSURFACE DRAINAGE INSTALLATION • TEMPORARY. AND PERMANENT EROSION CONTROL WABuilding\HANDOUT ICODESTORMSISPECIAL INSPECTION AGREEMENT FORM_doc7/07