20071213094710.pdfor EDS City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION �sr 1g90 (425) 771-0220 DATE: December 13, 2007 TO: Prestige Builders, Inc. prestigebuilders@comcast.net FROM: Jenny Readwin, Plans Ex ine RE: Plan Check # 2007-1175 Project: Hovik addition/remodel Proj ect Address: 1103 12t' Ave N. During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) Please add the following information to the site plan. ■ Label deck and covered porch as existing. • Swimming pools must be completely surrounded by a substantial fence at least six feet in height, no openings greater than 2" and self-closing, self -latching gates with inside lock inaccessible to children is required. Per ECDC19.00.005(C)(7)(C) any swimming pool not presently fenced complying with these requirements must be upgraded. Please show complying fence on the site plan and specify if existing or proposed. You may redline plans or resubmit three. (3) new site plans scaled no smaller than 1"=20' and one on paper no larger than 8 %2" x 14". 2) Show how island sink will be vented through the roof or with a loop vent as permitted by UPC 909.0 -Air admittance valves are not permitted unless first approved by the Building Official under and alternate method per UPC 301.2. 3) Note garage/dwelling separation on plans. Minimum %2" sheetrock required on garage side of wall and 5/8" type X on the ceiling when there is habitable space above and minimum 20 minute rated or 13/8" solid core door. 4) See attached structural comments from city consultant. Respond to each item in writing. Eagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359 �^ hoytjeter@centurytel.net I 360 874 0562 Fax 360 874 0591 To: Marie Harrison 121 5th Ave. N r Edmonds, WA 98020 Re: Hovik Addition 1103 12th Ave N. `T Edmonds, WA 98020 Plan Review # 2007-1175 EECE # EDM 07-78 Plan review number 1 Structure Stated Area S.F. Existing 3484 New Added 157 otal 3641. The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the Structural, ordinance, ventilations and indoor air quality, and energy code requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Page 2 of 4 Plan Review Number 01 EECE#: EDM 07-78 Hovik Addition STRUCTURAL COMMENTS Sheet 1: Plot flan 1. Please add the shear schedule to the plans as noted in the general notes. 2. EOR, please clarify where the horizontal floor diaphragm nailing requirements are specified on the drawings. I was unable to determine this from the drawings submitted. Sheet 2: Existing Basement Plan and purposed changes 3. EOR, please specify the required post to beam connections. For example, the 5- 1/8X12 GLB to the supporting post. All that is noted is the post size. I was unable to find where this was specified. 4. EOR, please provide analysis for the ledger attached to the house to support the design loads. ( Note nails can not be used for ledgers connections for withdrawal) 5. Please provide section B as noted on this sheet. I was unable to find where this was specified on the drawings. 6. Please provide sections at the 2 -car Garage. It is not clear how this is being build as noted on this sheet. 7. EOR, please provide a detail at the 3-112X9-1/4 PSL at the family room additions. It is not clear if the beams is below the 2x10 or in the same plane and hangers are required. Please add a detail at these locations. 8. EOR, please specify the required connection of the diagonal DBL 2X10 to the supporting members. Nothing is specified at this time. 9. EOR please clarify the connection of the 6X8 to the 4X10 header beam over the window. 10. EOR, please specify the required connections of the 6X8 beam (over the pool equipment). Nothing is specified at this time. 11. EOR, please specify the required connections of the 2x6 joist (over the pool equipment). Nothing is specified at this time Sheet 5: Elevations 12. EOR, please provide information for the new brick veneer connection on the drawings. Nothing was specified at this time. Page 3 of 4 Plan Review Number 01 EECE#: EDM 07-78 Hovik Addition Sheet 7: Construction Details 13. Please specify the required joist hanger to be used for the details. All that is noted is joist hanger with the actual one to use. Please modify accordingly. 14. EOR, please justify the nail spacing to be 6" OIC. Based off the analysis submitted the nails should be 6" OIC and not 6' OIC. Please modify accordingly. 15. EOR, please modify the shear wall nailing schedule to state single 3X member required for nails spacing of 2" OIC and the nails shall be staggered. Double 2X member is not allowed to be used for 2" OIC. IBC table 2306.4.1 footnote e. Ordinance Comments General 16. AOR, please give a break down of the new and existing portion of the house total area. Sheet 2: Existing Basement Plan and Proposed changes 17. AOR please specify the door that is being used to separate the residence from the garage. R309.1 18. AOR, please note on the drawings that penetrations through the garage and main house shall be protected by filling the opening around the penetrations with approved material to resist free passage of flame and product of combustions. With the appliance in the garage there will be penetrations. R309.1.2 19. AOR, please add to the drawing a method to protect the hot water heater and gas furnace for impact when located in the garage. M1307.3.1 20. AOR, please note on the drawing the required seismic anchorage strapping of the appliances. M1307.2 Sheet 4: Main Floor Plan with Proposed Changes 21. Please show locations of all smoke alarms on the drawings. This is required to be shown in all code required places. That is one in each sleeping room and on giving access to each sleeping room.. Please modify drawings accordingly. R313 22. Please justify the NE bedroom window meets the egress requirements. This is required to meet egress if the existing window does not. Please modify accordingly. R310 Page 4 of 4 Plan Review Number 01 EECE#: EDM 07-78 Hovik Addition 23. Please not on the drawing that the tile in the bathtub shall not be less then 6 feet. R307.2 24. Please note the locations of the light activations. This is required to be placed at the bottom and top of the stairs. Please modify the drawings accordingly. R303.6.1 25. 1 can not tell from the drawing the height of the window at the deck and they may required to be tempered. Please noted tempered or justify on the drawings not required. R308.4 26. Please provide guard detail for the deck framing. If the exiting guard does not meet the guar provisions this should be modified. Please note the code required guard requirement to be field verify on the drawings. R312 Energy Comments General 27. Please specify the required U value to be used for the new windows being added. The energy code has modified the window U values and this must be used for the remodel if using prescriptive methods. WSEC table 6-1 Ventilation and indoor air quality Comments Sheet 4: Main Floor Plan with Proposed Changes 28. Please specify the required fan size in the new kitchen. 29. Please specify the required fan size in the new bathroom. 30. Please specify the required fan size in the new master bathroom. Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874- 0562 between 8:00 a.m. and 5:00 p.m. By: Hoyt Jeter, P.E. President