PLAN REVIEW COMMENTS
BUILDING DIVISION
�sr g90 (425) 771.-0220
DATE: December 17, 2007
TO: Janet Start and John Marts
martslaw@msn.com
FROM: Jenny Readwin, Pians E amin
RE: Plan Check # 2007-1063
Project: Addition
Project Address: 805 Aloha Street
During rereview of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised
plans/documents (affected sheets only) with a written response to each of the items below to a
Permit Coordinator.
1) 12117107 See attached additional comments. See attached structural comments from city
consultant. Respond to each item in writing.
Eagle Eye Consulting Engineers, P.S.
PO Box 523
Olalla, WA 98359
hoAeter@centurytel.net
360 874 0562
Fax 360 874 0591
To: Marie Harrison.
121 5th St. N
Edmonds, WA 98020
Re: Stark Addition
805 Aloha St.
Edmonds, WA 98020
rra
Plan Review # 2007-1063 EECE # EDM 07-55 (2)
Second Comment letter
Structure
Area S.P.
Existing Main Floor
???
New Addition Kitchen
429
New extend FamiiJ
oom
145
otal
574
The above referenced project is in the process of plan review for compliance with
Edmonds ordinances and applicable codes. The following comments,
deficiencies/corrections must be addressed prior to completion of plans review and
subsequent issuance of permits.
Provide revised pians and calculations along with a written response to each of the items
listed below to facilitate a shorter back -check time.
SCOPE OF REVIEW
The scope of this review is for the Ordinance, Structural, V&IAQC and Energy
requirements of this project.
All features were checked only to the extent allowed by the submittals provided. All
portions of this project are assumed to meet or will meet other departmental requirements,
conditions and concerns before permit approval.
STRUCTURAL COMMENTS
Sheet 1: Foundation Details
1. 2. The drawing state the post will be noted on the plan but the post sizes appear
not to be specified. Please add this to the drawings. Post size is not specified for
the crawl space beam. All that is noted is 4x6 post at beam splices. I assume the
intent is to use a 4x4 but this is not specified on the drawings. Please modify
accordingly.
2. 3. Detail 2: Please sped the required connection of the joist to the supporting
crawl space beam. This is very important since this is what braces the
compression part due to bending. The alternative is to submit analysis for the
beam completely un -braced. This still has not been added to the drawings. Detail 2
on sheet 1 does not specified how the joist will be connected to the supporting
beam.
3. 4. Engineer of Record (EOR), please specify the required past to foundation
connections for the post above the supporting 7X9-1/2 PSI, and girder truss at the
extended family room. I was unable to determine this from the drawings submitted.
EOR, please submit manufacture information. for ABU to be used for multi sawn
lumber. The drawings state 5-2x to be used as post. Please provide detail how this
will be built.
Sheet 2 Main Floor framing plan
4. S. EOR please provide analysis for the 2x]0 ledger attached to the house to
support the design loads. Note nails cannot be used for withdrawal loads for
ledger connections. IBC 1604.8.3 8502.2.2. Analysis still has not been submitted
for the ledger connections. Justify one V2 lag screw @ 32" OIC will support the
required design loads. Also the response state there is not any withdrawal on the
ledger. But there is as required per code. The deck will see lateral due to minimum
out of plane loads. This must be addressed.
Sheet Sl: Details
5. 13. EOR, please note a 90 degree hook for the vertical reinforcement steel in the
footing. The alternative is to submit an analysis for straight embedment(s) as
required per ACI. Response states see revised drawings but the drawings do not
specify a 90 degree hook. Please modify drawings as noted in the response.
ORDINANCE COMMENTS
No comment at this time
Page 3 of 3
EECE#: EDM 07-55
Stark Addition 2007-1063
VENTILATION & INDOOR AIR QUALITY CODE (V&IAQC)
No comment at this time.
ENERGY COMMENTS
Prescriptive method used
No comment at this time.
Additional corrections may be required following receipt of corrections and additional
information as requested.
Your plans are being reviewed concurrently with the Building Department, Fire
Department, Zoning Department and Public Works Engineering. Changes, clarifications
or additional corrections may be required subsequent to the Building Department plan
review when comments are received from the other concerned departments.
Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874-
0562 between 8:00 a.m. and 5:00 p.m.
By.
Hoyt Jeter, P.E.
President