Loading...
20071218133150.pdf�V EDo City of Edmonds PLAN REVIEW COMMENTS z BUILDING DIVISION (425) 771-0220 DATE: December 18, 2007 TO: George Ostrow Velocipede FAX: 206-529-0259 FROM: Ann Bullis, Assistant Building Official RE: Plan Check # 2007-1181 Project: PCC Market — Shell Core Project Address: 9803 Edmonds Way During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Provide written responses to each comment and where changes can be found on the plans. Please resubmit to Marie Harrison, Permit Coordinator. 1. A shell/core building must meet minimum fire, life -safety, sanitation and ventilation codes. Please provide the following information on the plans: a. Show locations emergency lighting and illuminated exit signage, including method of power backup. .b. Provide plumbing fixture calculations per WAC 51-50 Chapter 29 for minimum restrooms. c. Provide plumbing plans (see enclosed handout) — this can be a deferred submittal for the shell/core items. d. See Fire Marshal comments regarding fire sprinkler and fire alarm requirements. e. Provide mechanical/HVAC plans (see enclosed handout), including State forms (forms can be found on hM2://www.neec.net/resources/_resources.html). Mechanical can be deferred submittal for the shell/core items. 2. List all deferred submittals/separate permit on the coversheet of the plans. Common deferred items to accommodate the shell/core permit only are plumbing, mechanical, fire sprinkler, fire alarm, State Electrical, Structural shop drawings. 3. On the coversheet, note the addition floor area. 4. Provide a statement on the coversheet of the plans as to how the alterations to the building comply with minimum Energy Code requirements of WSEC 1332. 5. Dimension the accessible parking stalls, including width, length, and striped access aisle. Show the location and detail of the accessible parking sign. Where the accessible path of travel crosses or is within a drive aisle, provide a crosswalk from the access aisle(s) to the building entrance. 6. Provide details of the accessible curb ramps. 7. Show the accessible path of travel from the public sidewalk to the building entrance. Provide a painted crosswalk where it crosses drive aisles. 8. On the site plan, note the type of fuel for the future generator. If there will be a storage tank (such as for propane or diesel) show the location. Please be aware that minimum distances to property lines as well as structures must be maintained for the future generator. 9. Clarify 17/A5.9 to show that 42" high guards (in addition to the handrails) will be provided on each side of the mezzanine stairway and landing to protect falls greater than 30". IBC 1013 10. The mezzanines, either walls or complying guards need to be provided with the shell/core plans to protect falls greater than 30". Revise note on mezzanine plans accordingly. IBC 1013 11. Dimension width of corridor with doors in the open position to show that the doors will not reduce the required width to less than I/2. IBC 1005.2 12. Cross-reference the mezzanine floor plans on the main floor plan. 13. Provide code justification for spaces enclosed with walls where only one means of egress is provided from the mezzanine. 1BC 505.4 14. Provide listed and tested 1 -hour wall assembly for corridor wall (such as from Fire Resistance Design Manual, UL, IBC Chapter 7 Tables, etc.). Note the requirements of the assembly on the applicable details. 15. The four required exits must be provided and be useable as part of the shell/core. The construction of the corridor wall without the "future" corridor doors will not allow the southeast and northeast exits to be used. Please revise/clarify. 16. Provide notes on door schedule that power operated doors will meet the requirements of IBC 1008.1.3.2. 17. Special inspections are required for all items noted on Sheet S L L Complete the enclosed Special Inspection and Testing Agreement; have all parties sign the form and return for approval prior to permit issuance. One form is required for each special inspection firm. 18. Provide a written statement of Contractor Responsibility per IBC 1706, signed by the General Contractor for the project and submit prior to permit issuance. See attached structural comments from the City's consulant. Please provide written responses to each comment and where changes can be found on the plans Page 2 of 2 Eagle Eye Consulting Engineers, P.S. PO Box 523 Qlalla, WA 98359 , hoytjeter@centurytel.net 360 874 0562 Fax 360 874 0591 To: Marie Harrison 121 5th Ave N Edmonds, WA 98020 Re: PCC Market Remodel 9803 Edmonds Way Edmonds, WA 98020 Plan Review # 2007-1182 EECE # EDM 07.83 Plan review number 01 Structure Occupancy Type Of Constructions Stated Area S.F. Main Floor M III -B 34160 Additions Main Floor M III -B 905 Mezzanines M III -B 369 Total 35434 Sprinklers 13 Yes The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the Structural requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Page 2 of 4 Plan Review Number 01 EECE#: EDM 07-83 PCC Market STRUCTURAL COMMENTS General: 1. Engineer of Record (FOR), the frame top connections state the connections are NO good. Please modify accordingly. ( Also see comment on sheet S5.1) IBC 106.1.1 Sheet S 1.2: General Notes No comment for this sheet at this time Sheet S2.1: Foundation Plan. 2. FOR, the new south mezzanine appears not to the show any vertical lateral resistance. Please provide analysis how the diaphragm's horizontal lateral loads are being resisted. ASCE 12.10 3. EOR, please provide analysis for the detail 161 S6.1 to support the design loads. This is required to resist a force of 3.2 kips. ACI 530.1 2.1.4.2.3 Sheet S2.2: Roof Framing Plan 4. FOR, please provide a detail for the connection of the 6-314X24 Glu -lam beam to the supporting structures. Nothing is specified at this time. ( I assumed the detail to use is 15 on sheet S6.3 but it is not clear if this is correct) Also note HU216 is not wide enough to except the 6-3/4 width beam) IBC 106. 1.1 5. FOR, please specify the required connection of the 6-314X18 Glu -lam beams to the exterior wall along grid line F.9. Without know the existing ledger connections to the wall there was no way to check the connections for a reactions of 3.2 kips. 6. FOR, please add the requirement for the sub diaphragm nailing on the drawing. Analysis required nailing to be 4" O/C and 3X member used. Also, the diaphragm is required to be blocked in that region. Please add this information to the drawings. IBC 106.1.1 Sheet S2.3: Canopy Framing Plan 7. FOR, please add the 4" OIC required nail spacing and note blocked diaphragm is required for the canopy framing as per the analysis. All I was able to find was the typical nailing noted in the general notes which does not match this. Page 3 of 4 Plan Review Number 41 EECE#: EDM 07-83 PCC Market Sheet 53.1: Foundation Plan No comment for this sheet at this time Sheet 55.1: Braced Frame Elevations 8. Detail 10: EOR please specify the required gusset plate size. Nothing is specified at this time. IBC 16049 9. Detail 10: EOR, please clarify the length of the kerf and weld required for the brace. Nothing is specified at this time. ( I assumed it is per 13 on this sheet but it is not clear) Sheet 56.1: Framing Details 10. Detail 9 and Detail 16: EOR, please provide analysis for the connection to the exiting CMU wall. 11. Detail 9: EOR, please provide analysis for this connection and add pertaining information to complete the load path. For example, what is the weld required for the kerf plate to the back plate. Analysis should be submitted for this connection to show it will be able to transfer the required design force and the pertinent information added to complete the connections. Sheet 56.2: Framing Details 12. Detail 13: EOR, please clarify what the base connection of the "EX COL. PER PLAN" to the new beam. It is not clear what the connections will be at these locations. Sheet 56.3: Framing Details No comment for this sheet at this time. Sheet 56.4: Sign, Fascia, Banner Framing 13. Detail 20: EOR, please provide analysis for the steel beam being load not at the center. It appears based off the detail torsions should be addressed for this beam. Please submit analysis or justify not required. Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, Page 4 of 4 Plan Review Number 01 EECE#: EDM 07-83 PCC Market clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874-0562 between 8:00 a.m. and 5:00 p.m. By: Hoyt Jeter, P.E. President