PLAN REVIEW COMMENTS
BUILDING DIVISION
Fsr . g90 (425) 771-0220
DATE: December 26, 2007
TO: Trevor and Melissa Thirsk
tthirsk@msn.com
FROM: Jenny Readwin, Plans Ex me
RE: Plan Check # 2007-1017
Project: Remodel
Project Address: 7232 170 Street SW
During re -review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised
plans/documents (affected sheets only) with a written response to each of the items below to a
Permit Coordinator.
1) Ok
2) Ok
3) Ok
4) Ok
5) Ok
6) Still need insulation values on the plans.
7) Still need smoke detectors shown on the plans.
8) Response says door opens right to deck without step but the plans no longer show the door and
there is a note to delete deck. Please clarify.
9) Ok
10) Ok
11) Ok
12) For detail 1 show how all loads are carried to bearing. Even if existing all loads must be carried
to bearing.
13) Ok
14) Ok
15) Post to beam and post to footing connectors must be noted on plans.
16) Provide a North/South and East/West section detail through the building to clearly show how all
loads are carried to bearing. Also, provide detail where new ridge and existing ridge intersect.
17) Beam C is still not dimensioned.
18) Ok
19) Provide a section detail at beam C. Plans show a point load from above. Please clarify what this
point load is from and clearly show how the posts supporting this beam are carried to bearing.
Please appear to be a different scaled -they do not line up with the foundation plan.
20) Please clarify if Beam A is sitting on existing or proposed posts.
21) On the roof framing plan show existing beams, headers, posts, etc. to show how all loads are
carried to bearing. Also specify what is supporting the knee bracing.