Loading...
20071226141021.pdfOV Eoo Cite of Edmonds IiR PLAN REVIEW COMMENTS BUILDING DIVISION ES r. ] sP (425) 771-0220 DATE: December 26, 2007 TO: Adam Kielski akielski@gmail.com FROM: Jenny Readwin, Plans amine RE: Plan Check # 2007-1270 Project: Interior Remodel Project Address: 8514 Madrona Lane During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) Scope of work item #5 also is to remove a portion of the wall like item #9 yet it is not shown on the roof framing plan and no calculations are provided. Please add this information to the plans and provide a calculations. Also, for both areas please not beam sizes. 2) Show size and location of posts/multiple studs supporting new beams. Also provide general foundation plan to show that these loads are being carried to bearing. 3) Specify how combustion air for new mechanical closet is provided (i.e. louvered doors, high/low vents, etc.). 4) Smoke detectors are required throughout the existing house in each sleeping room and in the hallway outside each separate sleeping area. Also, they must be hardwired and interconnected. Please note on plans and show location of all existing and/or proposed smoke detectors. 5) Minimum 100 cfm exhaust fan is required over the stove. Note on plans. 6) , For item #7 where the window size is changing please specify size of existing as well as the proposed window size. If the width of the window is changing please specify size of proposed header.