Loading...
20080109150744.pdfCity of Edmonds 121 5"r"1 AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 FAX(425) 771-0221 Website: WW"'.6.edM011dS.W1.L1S DEVELOPM ENTSERV ICES DEPARTMENT Planning - Building - Engineering Plan Cheek #: 2008-0005 Date: January 9, 2008 Project Name/Address: Bannister. 1820176"' Ave W Sump Pump Contact Person/Address/Fax: Jonathan & Wend v Bannister wibannister.@ yer.izon.net Reviewer: JoAnne Zulauf Division: Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at our website: www.ci.edmonds.wa.us, under City Government / Development Services Department EngineeringDivision then scroll down to Handouts: 1. Please clarify "Joint surnp drain". Is this the point at which the put -rip force line connects to the existing gravity systern? 2. A catch basin is required at the connection of the force line to gravity system. Please indicate rind and invert elevations. 3. Once location of catch basin is detert-nined the putrip sizing will be deterl-nined. Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED/E-MAILED 1/9/2008 PAGE F. OF F.