20080109150744.pdfCity of Edmonds
121 5"r"1 AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 FAX(425) 771-0221
Website: WW"'.6.edM011dS.W1.L1S
DEVELOPM ENTSERV ICES DEPARTMENT
Planning - Building - Engineering
Plan Cheek #: 2008-0005 Date: January 9, 2008
Project Name/Address: Bannister. 1820176"' Ave W Sump Pump
Contact Person/Address/Fax: Jonathan & Wend v Bannister wibannister.@ yer.izon.net
Reviewer: JoAnne Zulauf Division: Engineering
During review of the subject submittal, it was found that the following information, corrections, or
clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at
our website: www.ci.edmonds.wa.us, under City Government / Development Services Department
EngineeringDivision then scroll down to Handouts:
1. Please clarify "Joint surnp drain". Is this the point at which the put -rip force line connects to the existing
gravity systern?
2. A catch basin is required at the connection of the force line to gravity system. Please indicate rind and
invert elevations.
3. Once location of catch basin is detert-nined the putrip sizing will be deterl-nined.
Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please
contact me at 425-771-0220 if you have specific questions regarding these plan corrections.
DATE FAXED/E-MAILED 1/9/2008 PAGE F. OF F.