20080118094250.pdfMessage Page I of I
From: Zulauf, JoAnne
Sent: Friday, January 18, 2008 9:24 AM
To: 'Jonathan, Bannister'
Subject: RE: Bld 20080005
Thank you for sending the photographs of sump pump installation. Jeanie McConnell and I spoke with the
Assistant City Engineer Don Fiene thus morning about the issues we discussed with you at the counter
yesterday. If the water you were purnping out was going to go direcfly into the city storm system, a permit MUM
be required. As we learned yesterday, YOU will be directing the water into the existing detention vault therefore it
has been decided that we will not require a permit for this pump.
'rhe sump pump installation can proceed at your own risk.
I will notify the pert -nit coordinator that this perrnit is not necessary and to refund fees paid if any.
If you have any further ClUestions, please don't hesitate to contact rne.
Thank you!
JoAnne Zulauf
Engineering "Technician
City of Edmonds
(425), 771-0220 x'I 324
-----Original Message -----
From: Jonathan Bannister [mailto:wjbannister@verizon.net]
Sent: Thursday, January 17, 2008, 12:15 PIM
To: Zulauf, JoAnne
Subject: Re: Bld 20080005
Thank you for meeting with me this morning. I have attached photographs of the installation for your
information. I look forward to hearing from your.
Sincerely,
Jonathan Bannister
----- Original Message
From: Zu�a,Uf, JoAnne
To: wjbannister@verizon.net
Sent: Wednesday, January 16, 2008 10:46 AM
Subject: Bld 20080005
Please find Engineering Division Comments attached. <<76th Ave W- 18201 BLD20080005
Banniister2.doc>>
Engineering Techniclan
WRTSURIT1710M14
(425) 771-0220 Fax (425) 771-0221
1/18/2008