Loading...
20080204132614.pdfPiWchuck Contractors, In Job It I Date r, -2 Sheet lof l PROJECT MANAGER GA��'q NO fED 11 EMIG ovaRv M80M avou Notes: 1. All signs and spacing to conform to M UTC D & S Nc, v\rm Traffic Control specs. 2. Channelizing devices are 28" traffic cones, 1 All Signs are 48" x 48" 13/0 unless otherwise specified, 4. Alert affected residents. 5. Work to take place between 9 a.m. And 4 p.m. & All sidewalks & crosswalks to remain open unless otherwise noted. 7. Work area will be a55LIAl— of C/L of�-230 57 �SW & 4t" W of C/L 170 WORK--"� AREA M LEGEND 0 28" TRAFFIC CONE WORK AREA TRAFFIC FLOW FLAGGER WORK VEHICLE SIGN LOCATION ARROW BOAR[) SPEED LIMIT I CHANNELIZATION DEVICE SPACING dvIPH TAPER TANGENT 50170 40 80 3S/-45 .. 30 60 25/36 2D —26-- o �Q� SIGN SPACING MPH 45+ 500, 35 30 311' 200, 25 100, (I SO' Seattle) '200'SeaToc) ROAD WORK AHEAD APPR K, AN - 0 P Y, RECEIVED h2008 ENGWERING DIVISION