20080205115628.pdfCONSTRUCTION February 4, 2008 RECEIVED City of Edmonds FEB .0 5 2008 Development Services Department PERMIT COUNTER 121 5,h Avenue S. Edmonds, WA 98020 Attn: Jeannine Graf City Building Official & Theresa Umbaueh Senior Permit Coordinator Subject: Request for Temporary Certificate of Occupancy for Edmonds Professional Center permit #2006-1195 except for Summit T.I. Dear Jeannine: As requested, please allow this letter to serve as JTM Construction's formal written request for a temporary certificate of occupancy at the Edmonds Professional Center project building permit #2006- 1195 on February 7, 2003. All fire & life safety, site work and egress will be complete for all the new spaces except for the Suite 2300 (Summit T.I.), which will be completed by 41110$. If you require and additional information, pleasedo not hesitate to contact. me at 206-713-8225 (Cell) or via e-mail at rbrenkus@jtm-construction.com. 4erel , . Ray renkus Project .tanager ATNF CONSTRUCTION TEL 205.5$74000 METROPOLITAN PARK EAST FA, '205.587.4003 1730 M1NOR,AVENUE, SUITE 1120 SEATTLE, WASHJNGTON 98101 www (TM=.CONSTRUCTION.COM REQUEST FOR TEMPORARY OCCUPANCY FORM Projeci:Naine Project :Address Person: Requesting Temporary Occupancy _, L-5:50 :i Note only the propem.oimcr ur.SuAding;o_ „iirc rri;j'%mquesi temporary p-cupancv} (Pririi l�lamej Today's Date ���� �'� Date Ternporary Occupancy Needed "2— -71 $ Check the box indicating diaz the rioted items are complete on site. gill fire and life -safer requirements for Building, Fire anis Engineering shallbe complete in aider for Temparan Occupancy to be considered. fist any specific item that is inissirig and. indicate'1he date when: ir. tii:ill:& provided, l , All building wiridoi��s; exterior siding, too. f, and exterior doors are nsta edfe mplete_ Missing: 2.Ali required :lire rated construction (Iloorlceiling; 4 -ails &unit separations, etc.) and s . etural members .(cluriins, beams, etc.) are complete. missing: I ' r All required fire protections. syste;tns are. coiriple.te. and to full operation including: fire . 'rin ler, lire alarm, standpipes, fire and smoke .detection, five Suppression., etc.). .Aiinunciation.andlor notificationequipment is installed and is operational.. Missing: 4. All required components of the means of egress -system shall be complete and. opera le, including but not limited to :exit enclosures/corn d�rs, fire rated doorsand utlindoujs, door hardware„ illuminated exit signage, and emergency. lighting; stair handrails, guardrails etc. Missing: 5. Accessible signage, accessible parking, ramps, and directional signage is .installed. 1�15;S1rl�'_ 5:All interior finish materials on floors and walls -are complete. X Missing'. 7. The number parking spaces:on-si.te striped are V63 includin-'L6 accessible parkine space(s). Missing 8. Circle the following utilities that are complete (atom eater, sewer. electrical, { heat, lEght",phone, cable, and garbage,recycling). €:e A)7 -F-. Missing; 9. 5. Required crass connection protection of the: potable water system installed for premise isolation and all required interior fixtures. .y STT6 P:OTABLC L-JA7�5)2: Missing__ 10. u Specifv the unit numbers, tenant spaces or Moors requesting oceupanCy. U. D. For multifamily or mixed use buildings. submit a wnuen statement of how ,continued construction and occupant co -existence will be achieved s: 12= U Attach a site plata shovving the followin— AIL SgL�ec ;, ;- �' , '724—'5 0- •. Now, Fire. Department access will be maintained_ • Location of construction worker parking (on street parking shall be regulated by Parking Enforcement and will.be subject to applicable fines). + Construction materialstorage_ How safe tenant access will be maintained to the spaces/areas where tcrrtporary occupancy is tieing.requested. How required parking will .be kept clear of construction worker parking and material storage. • How garbage access will be maintained clear and accessible. • A nark schedule ietaiiijrgcompletion of the remainder o€ the pro-ect' and estimated date for request for Certificate of Occupancy for the.entire buiWing- 13, in. gIS, 0 The State Electrical inspector has approved.smice: p,I/ A ae Missing: K. E) Ellevator service has been apprar-ed.bv the State Inspector, tJ j r, .missing-. 15. Q Snohomish County Health District approval has been granted. N�issug; . 16., Plumbing systems are complete_ 'Missing.. 17 - Mechanical and HVAC systems are complete. Missing:w. �-� ► ;9 18; D Address numbers posted, occupant load signs posted, accessible signage is posted. Missing- 19- containing 0 a For building more than two units. submit the Building Enclosure - letter required. by :HB 1548.. 20. € 3 Attach a work schedule detailing the. remaining «ork oat the project and �nclude a final: completion date_ -^ y. . T L Ni 6L A. 3 MA Architectural Site Plaril8ection Prodded to Build Ors Exchange of WA, Inc. For usage Conditions Agreement see www-bx.w.a.-c=