Loading...
20080213081619.pdfTO: Diana White diana.white1@comcast.net FROM: Jenny Readwin, Plans Ex finer RE: Permit # 2007-1046 Project: White Revision Project Address: 831 Northstream Lane During review of the above noted revision, it was found that the following information, corrections, or clarifications are needed. 1) New revised foundation detail 4/S2 does not match similar detail 1/S2 that the contractor used in the field (#5 rebar vs #4 rebar). Correction notice written gave permission to pour at own risk pending stamped details from Engineer of Record (EOR). Provide new detail from EOR using rebar size and spacing shown on detail 1/S2 or alternate fix. 2) For the new building section 1 on sheet A -4.2a provide foundation detail that specifies required foundation information (10/S-2 and 9/S-3) do not give widths, rebar size and spacing, etc. For this detail also the upper floor joists are not actually running the way they are shown. Please revise detail to show actual construction. 3) Provide revised shear wall calculations for garage door changes including man door location change. City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION �sr ts9� (425)771-0220 DATE: February 13, 2008 TO: Diana White diana.white1@comcast.net FROM: Jenny Readwin, Plans Ex finer RE: Permit # 2007-1046 Project: White Revision Project Address: 831 Northstream Lane During review of the above noted revision, it was found that the following information, corrections, or clarifications are needed. 1) New revised foundation detail 4/S2 does not match similar detail 1/S2 that the contractor used in the field (#5 rebar vs #4 rebar). Correction notice written gave permission to pour at own risk pending stamped details from Engineer of Record (EOR). Provide new detail from EOR using rebar size and spacing shown on detail 1/S2 or alternate fix. 2) For the new building section 1 on sheet A -4.2a provide foundation detail that specifies required foundation information (10/S-2 and 9/S-3) do not give widths, rebar size and spacing, etc. For this detail also the upper floor joists are not actually running the way they are shown. Please revise detail to show actual construction. 3) Provide revised shear wall calculations for garage door changes including man door location change.