20080213084846.pdfoV �b o� City of Edmonds `g} PLAN REVIEW COMMENTS BUILDING DIVISION Fs� ggo (425) 771-0220 DATE: February 13, 2008 TO: Terri (Murphy) Gietzen and Daniel Gietzen mu,rphyts@comcast.net FROM: Jenny Readwin, Plans E min RE: Plan Check # 2007-1022 Project: New SFR Project Address: 8715 Talbot Rd. During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) ok 2) ok 3) ok 4) ok 5) 2113108 See attached additional Structural Comments. 2/4/08 See attached additional structural comments. See attached structural comments from city consultant. Respond to each item in writing. Eagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 95359 hoAeter@centurytel.net 360 874 0562 Fax 360 874 0599 To: Theresa Umbaugh 121 5th Ave N Edmonds, WA 98020 Re: Gietzen Residence 8715 Talbot Rd Edmonds, WA, 98020 Plan Review # 2007-1022 EECE # EDM 08-06(2) Plan review number 02 Structure Area S.F. Main floor 2615 Second floor 2015 Total 4630 Garage 723 Total 5353 Deck Second floor 98 Porch 46 Grand total 5497 The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the Structural requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. STRUCURAL COMMENTS Sheet S2 Main Floor Framing Page 2 of 3 Plan Review Number 02 EECE#: EDM 08-06(2) Gietzen Residence 2007-1022 1. 1. EngineerJofRecord (EOR), please submit an analysis for the continuous spread footing to support the reaction from the post bearing at the edge. For example the new 4x10 beam at the family room. Based off the reactions and the load applied at the edge it appear the footing will not support this force. Please submit analysis to justify or increase the size of this footing similar to detail 3. IBC 1805.4.1 The analysis submitted has not applied the force at the edge of the footing. It has applied it at the center of the stem wall but this is not how the drawings show it to be applied. The continuous footing has a post bearing on the edge of the 16" footing. So a wall 8" wide center on the 16" footing only leaves 4" for bearing. The post that is shown bearing on the edge. Submit analysis to show this condition or modify the footing accordingly. 2. 2. EOR, please submit analysis for the continuous spread footing to support the reaction from the post bearing at the edge supporting the new double joist under wall. Based off the reactions and the load applied at the edge it appear the footing will not support this force. Please submit analysis to justify or increase the size of this footing similar to detail 3. IBC 1805.4.1. This still has not been submitted. The analysis for this response still applies the force at the center of the footing but this is not the case. Please modify accordingly. Sheet S3 Second Floor Framing 5. EOR, please provide a detail for the 4x10 down to the supporting post. There is a 1-3/4X11-7/8 beam framing in one direction and the other directions there is a 9-1/2X 11-7/8 PSL flush. There also perpendicular to the column is a 4x10 down. Please add a detail at this location for the complete load path. It was not clear how these members will be connected. A detail still has not been added at this location. Please submit details as requested to assure a complete load path. Sheet S4 Roof Plan 4. 10. EOR, please specify the required anchorage of the girder truss to the supporting structures. The IBC required the register design professional to specify this. IBC 2303.4.1.6. The response states a Hl will be used at all trusses. But this will not work for the girder trusses. The trusses engineer does not deal with this unless this is listed as a deferred submittal. This is one reason why this portion of the code was added due to truss manufactures building code committee. The engineer of records is required to provide this positive connection. Please add a detail and the required connections of the Girder truss to the supporting structures. 5. 11. EOR, design analysis for the RH7 state shear stress to be 201 psi. Please clarify how the 6X8 DF#2 allowable stress will not exceed this. The shear may be Page 3 of 3 Plan Review Number 02 EECE#: EDM 08.06(2) Gietzen Residence 2007-1022 taken d from the support. So if the reaction is with d of the support this may be ignored for calculating the shear stress. Please clearly dimension the location of the Girder truss on the drawings to assure this reaction will be with -in this limit or modify the member to not exceed the allowable shear stress. NDS 3.4.2. The neva analysis submitted still show the shear stress exceeding the code requirements. Shear maybe taken d from the support is correct. Please clearly dimension on the drawings that the girder truss locations on the drawings. The beam is 7.5" deep and it is not clear on the submitted document that the girder truss will be less then 7.5" from the support as assumed in the design. Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874- 0562 between 8:00 a.m. and 5:00 p.m. LISM Hoyt Jeter, P.E. President