Loading...
20080226135227.pdfo Eby City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION Fey. 1g90 (425) 771-0220 DATE: February 26, 2008 TO: Duane Landsverk duane@lgh.inc.com FROM: Jenny Readwin, Plans xarni RE: Permit # 2007-0859 Project: Framing Revision Project Address: 9007 196'' Street SW During re -review of the above noted revision, it was found that the following information, corrections, or clarifications are needed. 1) ok 2) 2126/08 Calculations submitted call out a 4x10 header for the upper floor windows and calculation is for a 6' span. Rec Room window on the plans is 8'. Please provide calculation for 4x10 header with 8' span. Also, calculation for garage door header below (5118"x 13 112" GLB) does not appear to account for the point load from 4x10 above. Please provide calculation including point loads. Now that the upper floor roof has changed direction please specify size and provide calculations for the stair door header and East wall windows as well as calculations for the garage door headers with new point loads from above.