August 4, 2008
Warren LaFon, AIA
849 Puget Way
Edmonds WA 98020
Phone: 425.794.0580
Email: warrenlafon@earthlink.net
RE: BLD-2008-0287 – Greg Jantz Addition @ 547 Dayton Street (BD2 Zone)
Dear Applicant,
I have re-reviewed the above building permit application for the Planning Division and it was found that the
following information, corrections, or clarifications will need to be addressed before review can continue. If you
have any questions, please do not hesitate to contact me. I look forward to working with you on this project.
Please provide a written response to the items mentioned below…
1.Height:
Thank you for updating the height calculations. It looks like you updated the height rectangle to
enclose all of the structure – thank you. You changed the SW point from 98.70 to 97.33, but your height
calculations still include the old point (98.70). When I did the math, using the new number seems to have put
you over the 25’ limit. Please explain/revise/modify – I’d be happy to go over this further with you. Once you
update your calculations, please transfer these numbers onto an elevation view showing the “average grade”
line, the “maximum elevation” line, and the “actual height” (redlining your plans is acceptable).
2.Elevations:
Response received – thank you.
3.Design Review:
Response received – thank you.
4.Landscaping:
Response received – thank you.
5.Land Use:
Response received – thank you.
6.Rooftop Mechanical Equipment:
\[No response received from 5/12/2008\]Is there any rooftop mechanical
equipment proposed? If so, how will it be screened from view? Will it be painted to match the roof? If
proposed, please show how it remains under the height limit. Please provide a response.
Sincerely,
Gina Coccia, Associate Planner
Phone: 425.771.0220, x 1778 | Email: coccia@ci.edmonds.wa.us
cc: BLD-2008-0287
Please provide a written response to the items mentioned above. Also, please redline your plans to reflect any changes – or, if you are submitting
new plans, please submit three site plans (one must be reduced size) and two sets of the changed pages of the plans. Please make all submittals
to the Development Services Permit Coordinator (Theresa Umbaugh) Monday through Friday, 8am-4pm (except Wednesdays). All Edmonds
Community Development Code (ECDC) citations can be found on the City of Edmonds website: www.ci.edmonds.wa.us.