Loading...
20080305100644.pdfOV �D City of Edmonds tel:. i PLAN REVIEW COMMENTS BUILDING DIVISION ESc. lg90 (425) 771-0220 DATE: March 5, 2008 TO: Charles and Marilyn Yeider PO BOX 55265 Shoreline, WA 98155 FROM: Jenny Readwin, Plans ami RE: Plan Check # 2008-0026 Project: Yeider Remodel Project Address: 8445 198th Place SW During re -review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) ok 2) ok 3) 3/5/08 Specify size of new floor joists as well as their spacing. Also, Specify if foundation will be mono pour. If not, then vertical #4 hooked rebar is required at 4' on center. Provide complete foundation, floor and roof framing for the bathroom addition. Also provide a section detail showing foundation, wall construction, etc. See attached Addition Handout for minimum submittal requirements. 4) ok 5) ok 6) 3/5/08 Note ventilation requirements on the roof frame plan. Provide attic ventilation calculations according to R806.2 (1 square foot for every 300 square feet of attic space if using both cave and ridge vents and 1 square foot for every 150 square feet if not). 7) 3/5/08 2x4 walls will not accommodate R-21 batt insulation. Note rigid insulation or upgrade to 2x6 walls. For the new bathroom addition the minimum wall insulation is R-21. Please revise plans. 8) ok 9) 3/5/08 Because the ceiling joists in the new living room are being removed it is eliminated the tie far the existing roof therefore collar ties are required in the upper third of the existing roof area at no more than 4' on center. Note on plans. For new vaulted ceiling over the living room, Per R802.3.1 Collar ties are required in the upper third of the attic area. Please show collar ties on roof section detail and clarify that the new ridge and rafters shown is under the existing roof (i.e. no roof loads are applied just there to hold sheetrock for vaulted area). 10) ok