Loading...
20080307132956.pdfono City of Edmonds V � d PLAN REVIEW COMMENTS - Rvi" BUILDING DIVISION Est. i g90 (425) 771-0220 DATE: March 7, 2008 TO: Joe Myers joemyersconstmetion@comeast.com FROM: Jenny Readwin, Plans E ani' RE: Permit # 2008-0026 Project: Revision Project Address: 8723 Talbot Rd. During re -review of the above noted revision, it was found that the following information, corrections, or clarifications are needed. 1) 3/7/08 Still need. Please revise building section on sheet 2 to match actual conditions (i.e. footing supporting 4x4 post at the existing foundation wall, direction of floor joist, etc.). 2) 3/7/08 Please provide section detail for construction of new framed wall on the existing foundation from the foundation through the floor joists supported on this wall. 6x10 beam for crawl space access does not reflect actual construction. The existing foundation all at this location, per my site visit, was about 2'-3' high and was all open into the crawlspace area. Please show beam for this area to completely support the floor joist and provide beam calculation. 3) 3/7/08 Still need. Please show 2x10 floor joists extending all the way to the 4x10 at the 4) 5) 6) fireplace. 3/7/08 A new footing and post was added to the plan but it does not line up with the beam. Please clarify. Plans show 4x10 at the fireplace between the two footings but how will the floor joists be supported on the other sides of that beam? If the beam extends to the exterior wall and to the beam past the furnace please show it as well as how it is carried to bearing at each end (i.e. hangers at the furnace side and post and footing the other). ok 3/7/08 if there are beams in this location please note size and label as existing. It is important to provide complete framing information to see how the existing ties into the proposed. Please specify size of the beam that runs the same direction as the floor joist near the storage area and provide calculation including point loads if the 6x10 and 4x10 beams are hanging from them.