Loading...
2008-0319_NordicCenter.pdf CE ITY OF DMONDS th 121 5 Avenue North • Edmonds, WA 98020 Phone: 425.771.0220 • Fax: 425.771.0221 • Web: www.ci.edmonds.wa.us DSD: PD EVELOPMENTERVICESEPARTMENTLANNINGIVISION June 4, 2008 Megumi Matsumura CDA + Pirscher Architects 20011 Ballinger Way NE #200 Shoreline WA 98155 Phone: 206.368.9668 | Email: megumim@cdaarch.com th RE: BLD-2008-0319 – Nordic Center Mixed Use @ 310 5 Avenue South (BD2 Zone) Dear Applicant, I have reviewed the above building permit application for the Planning Division and it was found that the following information, corrections, or clarifications will need to be addressed before review can continue. If you have any questions, please do not hesitate to contact me. I look forward to working with you on this project. Please provide a written response to the items mentioned below… 1.Height Calculations: Please confirm that the height calculations shown on the site plan have been derived based on the following definition of height: ECDC 21.40.030 Height. A. Height means the average vertical distance, from the average level of the undisturbed soil of the site covered by a structure, to the highest point of the structure. (See subsection (C) of this section for exceptions to this rule.) B. “Average level” shall be determined by averaging elevations of the downward projections of the four corners of the smallest rectangle which will enclose all of the building, excluding a maximum of 30 inches of eaves. If a corner falls off the site, its elevation shall be the average elevation of the two points projected downward where the two sides of the rectangle cross the property line. (See subsection (C)(1) of this section for exceptions to this rule.) Because no setbacks are required, I realize you’re building almost to the property lines, but it looks like the height rectangle points were taken from the property corners instead of the smallest rectangle enclosing all of the building. Please verify, and revise the site plan and elevations, if necessary.Please also note if moving the four corners of the height rectangle in a few inches results in the elevation points remaining exactly the same. 2.Street Tree: I’m checking with the Parks & Recreation Department to determine the exact species of the existing street tree; the required species shown on the Streetscape Plan is Acer rubrum ‘Scarsen’ (Scarlet Sentinel Maple) so please plan on using this species for the new street tree (unless I hear otherwise from P&R). 3.Mechanical Equipment: I didn’t notice any rooftop mechanical equipment on your elevations – please confirm. Please know that any future rooftop mechanical equipment will not only need to be screened from view, but will also need to remain under the height limit. Sincerely, Gina Coccia, Associate Planner Phone: 425.771.0220, x 1778 | Email: coccia@ci.edmonds.wa.us cc: BLD-2008-0319 Please provide a written response to the items mentioned above. Also, please redline your plans to reflect any changes – or, if you are submitting new plans, please submit three site plans (one must be reduced size) and two sets of the changed pages of the plans. Please make all submittals to the Development Services Permit Coordinator (Marie Harrison) Monday through Friday, 8am-4pm (except Wednesdays). All Edmonds Community Development Code (ECDC) citations can be found on the City of Edmonds website: www.ci.edmonds.wa.us. Page 1 of 1