Loading...
20080331072438.pdfof EOE City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION �sf. ts9° (425) 771-6220 DATE: March 31, 2008 TO: Wayne Davenport e-mail: wayneandtone@hotmail.com FROM: Ann Bullis, Assistant Building Official RE: Plan Check # 2008-0239 Project: Campbell Nelson Nissan — My Friends Cafe Project Address: 24329 Highway 99 During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Provide written responses to each comment and where changes can be found on the plans. Please resubmit to Marie Harrison, Permit Coordinator. Please provide this comment letter to your architect for response and coordination with plumbing and mechanical. 1. On the coversheet, note current code information (2006 editions), current Type of Construction, current occupancies, and occupant loads. 2. Show the floor area of the cafe (including kitchen, customer, and seating areas) and show that it is less than 750 sf (IBC 303.1 exceptions) or an accessory occupancy (IBC 508.3.1). 3. Plumbing must be included with this permit. Please submit plumbing plan (8 % x 11 ok) for drain/waste/vent and hot/cold potable water piping — see enclosed handout. Also provide for condensate wastes for refrigeration equipment. 4. A Type IT hood is required over the cooking equipment unless calculations are provided showing that the heat and moisture produced can be accounted for in the existing HVAC system (11\4C 507.2.2). Calculations must be stamped and signed by a State licensed mechanical engineer. If a Type H hood will be provided, show the location and efin rating, and show how it will be vented to the outside. 5. Label the existing l -hour fire barrier on the plans. All penetrations (such as electrical and plumbing) must be fire stopped with 1 -hour fire stopping assemblies. Please note on the plans. city of edmonds development information /nc. I Sqo Plumbing Permit Submittal Requirements PERMIT REQUIRED: A permit is required to install, alter, repair, relocate, or replace any portion of a potable or waste plumbing System. Including gas hot water tank replacement, water service line repair or replacement, propane tanks, and to install or alter gas piping. EXEMPT WORK: The clearing of stoppages or the repairing of leaks in drains, pipes, valves, vents or fixtures, and the removal and reinstallation of water closets, provided such repairs do not involve or require the replacement or rearrangement of valves, pipes or fixtures. CODES: Uniform Plumbing Code 2006 Edition International Fuel Gas Code 2006 Edition LPG per 2001 NFPA-58 and 2002 ANSI 2223_ UNFPA -54 FEE: Base fee $30 plus additional fees based on the number and type of plumbing fixtures plus $15 City surcharge fee SUBMITTAL REQUIREMENTS FOR NEW INSTALLATIONS: I . Permit Application Farm C and Plumbing Fixture Form B (attached) 2. On a scaled floor plan show the following: a. Drain, Waste and Vent piping layout; sizing, slope and pipe material b. Potable water line layout, sizing and pipe material c. Fixture unit and flow calculations to support line sizing 3. Cross connection devices are required on all direct connections to the potable water system. Specify all fixtures that require cross connection devices (i.e., ice machines, soap ejection systems, beverage dispensers, boilers, etc_) and note the make and model of each device. 4. Indicate the location and cross connection device for premise isolation 5. Manufacturer's specifications for equipment such as sump pumps, ejector pumps, water heater boosters, etc. 6. Gas piping layout, sizing and pipe material, pipe sizing calculations, maximum design operating pressure and location of pressure regulators 7. For Commercial and Multifamily projects, provide Listed and Tested Fire Stopping Assemblies NOTE_ THE PURPOSE OF THIS HANDOUT IS TO ASSIST THE PUBLIC IN COMPLYING WITH DETAILED PERMIT SUBMITTAL REQUIREMENTS. IT IS NOT A COMPLETE LIST OF PERMIT OR CODE REQUIREMENTS AND SHOULD NOT BE USED AS A SUBSTITUTE FOR APPLICABLE LAWS AND REGULATIONS. IT IS THE RESPONSIBILITY OF THE OWNER/DESIGN PROFESSIONAL TO REVIEW THE SUBMITTAL FOR COMPLETENESS AND APPLICABILrFY TO OTHER CODES. ONLY COMPLETE APPLICATIONS WILL BE ACCEPTED BY THE CITY FOR REVIEW. Revised 7/07 rF'r PLUMBING FIXTURE COUNT {Form B Number Fixture Tvue Revised 7/07 Water Closet (Toilet) Sink (kitchen, laundry, bar, etc_) Lavatory Tub/Shower Dishwasher Hose Bib Water Heater Expansion Tank For Water Heater Floor Drain Pressure Reduction Valve Water Service Line Drinking Fountain Bidet/Urinat Clothes Washer Backflow Protection Device Hydronic Heat In Floor Wall Other GAS OUTLETS AC Unit BTUs Location Furnace BTUs Location Water Heater BTUs Location Boiler BTUs Location Dryer Stove/Range/Oven Fireplacelinsert BTUs Location Outdoor BBQ Revised 7/07