Loading...
20080403135954.pdfEagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359 hoytjeter@centurytel.net 360 874 0582 Fax 360 874 0594 To: Marie Harrison 121 5th Ave N Edmonds, WA 98020 Re: Riechler Office Building 21827 76th Ave W Edmonds, WA 98026 Plan Review # 2008-0223 EECE # EDM 08-24 The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes (Fire Suppression only). The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for Fire Suppression requirements of this project All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Page 2 of 2 EECE#: EDM 08-24 Riechler Office Building 2008-0223 Fire Suppression Comments PKe I 1. On the riser detail, provide and show a pressure gauge on the supply side of the valves. NFPA 13, 7.1.1.1 Page 3 2. On the lower level, provide a sprinkler head in the elevator pit. NFPA 13, 8.15.5.1 3. On the lower level, the two sprinkler heads that are next to the elevator need to be at least six feet apart from each other. They appear to be approximately 4.5 to 5 feet from each other. NFPA 13, 8.6.3.4.1 4. On the lower level, provide and show seismic bracing on the main. NFPA 13, 9.3.5.1 5. On the upper level, provide detail which show why the sprinkler heads between grids 2.4 — 4.1 / D --- E (and on the opposite side of the building) are spaced so close together. NFPA 13, 8.6.3.4.1 Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt .Teter at (360) 874- 0562 between 8:00 a.m. and 5:00 p.m. By: Hoyt Jeter, P.E. President