20080403135954.pdfEagle Eye Consulting Engineers, P.S.
PO Box 523
Olalla, WA 98359
hoytjeter@centurytel.net
360 874 0582
Fax 360 874 0594
To: Marie Harrison
121 5th Ave N
Edmonds, WA 98020
Re: Riechler Office Building
21827 76th Ave W
Edmonds, WA 98026
Plan Review # 2008-0223
EECE # EDM 08-24
The above referenced project is in the process of plan review for compliance with
Edmonds ordinances and applicable codes (Fire Suppression only). The following
comments, deficiencies/corrections must be addressed prior to completion of plans review
and subsequent issuance of permits.
Provide revised plans and calculations along with a written response to each of the items
listed below to facilitate a shorter back -check time.
SCOPE OF REVIEW
The scope of this review is for Fire Suppression requirements of this project
All features were checked only to the extent allowed by the submittals provided. All
portions of this project are assumed to meet or will meet other departmental requirements,
conditions and concerns before permit approval.
Page 2 of 2
EECE#: EDM 08-24
Riechler Office Building 2008-0223
Fire Suppression Comments
PKe I
1. On the riser detail, provide and show a pressure gauge on the supply side of the valves.
NFPA 13, 7.1.1.1
Page 3
2. On the lower level, provide a sprinkler head in the elevator pit. NFPA 13, 8.15.5.1
3. On the lower level, the two sprinkler heads that are next to the elevator need to be at
least six feet apart from each other. They appear to be approximately 4.5 to 5 feet
from each other. NFPA 13, 8.6.3.4.1
4. On the lower level, provide and show seismic bracing on the main. NFPA 13, 9.3.5.1
5. On the upper level, provide detail which show why the sprinkler heads between grids
2.4 — 4.1 / D --- E (and on the opposite side of the building) are spaced so close
together. NFPA 13, 8.6.3.4.1
Additional corrections may be required following receipt of corrections and additional
information as requested.
Your plans are being reviewed concurrently with the Building Department, Fire
Department, Zoning Department and Public Works Engineering. Changes, clarifications
or additional corrections may be required subsequent to the Building Department plan
review when comments are received from the other concerned departments.
Should you have any inquiries regarding this letter, please contact Hoyt .Teter at (360) 874-
0562 between 8:00 a.m. and 5:00 p.m.