Loading...
20080425105755.pdfPlan Check # 09"02-03 _ _ Date 4-2-S-7-- 08 Project Name/Address -- A &/ Contact Person/Address Department: Building E Engineering ❑ Planning ❑ Fire ❑ Public Works ❑ Reviewer r ❑ Submit 2 sets of revised plans/documents to the Permit Coordinator. Corrections may be made by red lining plans/documents on file with the City. DATE FAXED (Attach fax transmittal) PAGE I OF Eagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359 hoytjeter@ceriturytel.net 360 874 0562 Fax 360 874 0591 To: Marie Harrison 1215' Ave N Edmonds, WA 98020 Re: Ragan Addition 10601 242"' PL SW Edmonds, WA 98020 Plan Review 42008-0283 Plan review number 01 EECE 4 EDM 08-33 Structure Stated Area S.F. Existing Main Floor 1344 New Main Floor 459 Total 1803 New Deck 318 Grand total 2121 The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the Ordinance, Structural, V&IAQC, and Energy requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Page 2 of 4 Plan Review Number 01 EECE#: EDM 08-33 Ragan Addition 2008-0283 ORDINANCE COMMENTS Sheet 3 Foundation Plan 1. The under floor vents maybe 11300 and only one side may note have vents. Based off the additions, two sides will not have vents. Please modify the under floor vents to 11150. R408. 2. It is not clear how the minimum roof ventilations are being used for this structure. The state has not adopted conditions attic assemblies. Please justify on the drawings the minimum roof ventilations. R806 Sheet 4 Main Floor Plan 3. Please clarify the locations of the smoke alarm on this level. R313.2.1 Sheet 5 Roof Framing Plan 4. Please clarify the locations of the down spouts and roof drains on the drawings. R903.4 Sheet 6 Notes and Details 5. Please cross off items that do not pertain to this remodel. For example, the chimney notes. All pertinent information for the remodel should be on the plans but items that do not pertain should be crossed off. STRUCTURAL COMMENTS Prescriptive Method Used General 6. Please reference which detail shall be used and where. All that has been provided is with typical details. Some of the details do not even apply for this structure. The drawings should clearly reference which detail shall be used, where on the plans and details that do not apply should be removed from the set. Please modify to clearly show where each detail will be used. 7. Please add to the drawing the required fastening schedule per table R602.3(1) Sheet 3 Foundation Plan S. Please specify the required connections for the Joist to the supporting beam. Page 3 of 4 Plan Review Number 01 EECE#: EDM 08-33 Ragan Addition 2008-0283 9. Please specify the required connection of the ledger to the main house as shown on this sheet. Nothing is specified at this time. 10. Please specify the require support of the 2x10 new floor joist to the exterior wall. 11. Please dimension the locations for ht post supporting the 4x8 beam. This is important in order to check the capacity of the beam. This information should be specified on the drawings. 12. Simpson catalog does not specify a LUS can be skewed. Submit documentation from the manufacture the capacity for a LUS skewed hanger that will be modified Simpson Hanger option Matrix. 13. There is not any method to transfer the horizontal diaphragm loads at the house side. A ledger or another method must be provided in order to transfer this force. Please modify the drawings accordingly. Sheet 4 Main Floor Plan 14. BWP is required to be placed on all 4 sides not just three sides of the diaphragm. Please modify the drawings to show the required braced wall panel on all sides of the additions. R602.10.5 Sheet 5 Roof Framing Plan 15. Please add detail for the interface between the existing and new roof. How is this to be constructed and connected in order to transfer the lateral forces? More information is required to complete the review. Sheet 6 Notes and Details 16. Please note a 90 -degree hook for the vertical steel in the footing. WSA IRC 403.1.3 17. Reinforcement steel shall be grade 60 not grade 40 as noted in the notes. 18. Please cross off information that does not apply for this permit. For example, there are 5 roof options. A complete review cannot be performed unless the roof to be used is specified. I will base the review off the elevations but this may or may not be correct. Please modify accordingly. Page 4 of 4 Plan Review Number Of EECE#: EDM 08-33 Ragan Addition 2008-0283 VENTILATION AND INDOOR AIR QUALITY CONTROL COMMENTS Less then 500 square foot will be added so whole house fan is not required to be met for this addition. WSV&IAQC 101.3.1.1 ENERGY COMMENTS No comment at this time. Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874- 0562 between 8:00 a.m. and 5:00 p.m. LE Hoyt Jeter, P.E. President