20080502103016.pdfCity of Edmonds
121 5""' AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 FAX(425) 771-0221
Website: www.ci,edmon(1s.wd.US'
DEVELOPMENT SERVICES DEPARTMENT
Planning * Building - Engineering
Plan Check #: 2008-0288 Date: May 2, 2008
Project Name/Address: Landsverk SFR
Contact Person/Address/Fax: Torn Leren Fax: 425-771-8401 torn@lerendesi n.com
Reviewer: JoAnne Zulauf Division: Engineering
During review of the subject submittal, it was found that the following information, corrections, or
clarifications would need to be addressed. All Handouts referred to in these comments, can be accessed at
our website: "www.ci.ednionds.wams under City Government / Development Services Department
Engineering Division then scroll down to Handouts:
Show gas utility connection from street to house on site plan.
2. Show side sewer clean out on right of way side of property line as 6" with 12" cast iron larnphole cover.
Identify on plan if side sewer on private property to be 4" or 6". See Handouts and Standard details
available on our website for more information. Show how it connects from main to house. Please show
4" clean out at house. Note: Minimum horizontal separation of water and sewer line is 10 feet.
I Please label gas, sewer and water mains along Grandview for clarity.
4. Please label water meter on large civil plans.
5. Water meter is shown on private property on reduced size site plan. Please move to northeast of
property line into the right of way.
6. Clearly indicate property lines and property corners.
T Please Correct sheet indexing as shown on C L
8. Please add "and catch basin inserts" to end of step #5 in Construction Sequence.
9. Please add the word "Permanently" to the beginning of step 49 in the Construction Sequence.
10, All new impervious surface must be routed through the detention system and credit cannot be given for
impervious surface removed. As the total new impervious Surface exceeds 5000sf, the drainage system
rnust be designed, stamped and signed by a Washington State Licensed Engineer. Our standard handout
calculations do not apply to systems over 5000st'. Please submit a new drainage plan.
Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please
contact me at 425-771-0220 if you have specific questions regarding these plan corrections.
DATE FAXED/E-MAILED 5/2/2008 PAGE 1 OF 1