Loading...
20080505141943.pdfPlan Check # � Project Name/. Contact Person/Add Department: Building City of Edmonds Plan Review Corrections Reviewer14-'J �i a S Engineering 0 Date J Planning ❑ �1` �►tLr J/ r! IIIIIIIIIIII Z111', w -Ir_i! Fire ❑ ❑ Submit 2 sets of revised plans/documents to the Permit Coordinator. Corrections may be made by red lining plans/documents on file with the City. DATE EAXE D !�{Attach fax transmittal} PAGE OF Eagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359 hoytjeter@centurytel.net 360 874 0562 Fax 360 874 0591 To: Theresa Umbaugh 121 5th Ave N Edmonds, WA 98020 Re: Lee Additons 19120 83' Ave W Edmonds, WA 98020 Plan Review # 2007-0804 EECE # EDM 08-43 Plan review number 01 Structure Area S.F. Main Floor 320 Grand total 320 The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the Struetural Only requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Page 2 of 3 Platt Review Number 01 EECE#: EDM 08-43 Lee Additions 2008-0804 Structural Comments Only General 1. AOR, please note on the drawing that the bottom chord for the truss shall be design for a live load of 20 psf. IBC table 1607.1 R301.5 2. Several structural details show bolts, joist hangers, nails, etc. in contact with pressure treated wood. The new pressure treated lumber has been shown to be very corrosive, with some of the treatments being 5times more corrosive than others. Hot dipped galvanizing may not provide adequate protection for some of the treatments being used. At present the industry is recommending a higher grade of hot -dipped galvanizing as a minimum, with stainless steel being preferred. Please specify bolt, nailing, and joist hanger protection where these items are in contact with pressure treated wood. It is recommended to specifically state as a minimum to use triple zinc ZMAX (G185 per ASTM A653) Hot Dip Galvanize (ASTM A123 for connectors and ASTM 153 for fasteners and anchors). Simpson T- PTWOOD 1106 expires 1/08. R319.3 Sheet 7 3. Detail 1: Please specify the required reinforcement for the foundations stem wall. Reinforcement's steel is required for D2 seismic zone. 4. Please specify the required connection of the floor joist to the supporting beam. This is important to make sure the compression zone of the beam is braced under bending. Please modify accordingly. 5. Please note the 4x8 shall be full length of the floor system. The post 4x4 supporting the 4x8 will not support the design stresses if the 4x8 is spliced at the post. Please note this one the drawings. Sheet 4 First Floor Plan 6. Please specify the required braced wall panel at the interface between the existing living room and new additions. One is required at this location. Sheet 5 Foundations Plan 7. Please note the plate washer shall be a minimum 3 x 3 x .229" at all anchor bolts. R602.11.1. and IBC 2305.3.11 Page 3 of 3 PIan Review Number 01 EECE#: EDM 08-43 Lee Additions 2008-0804 8. Please provide a detail at the 2x8 ledge being connected to the concrete stem. What is noted is 2x8 ledge lag into an 8" basement wall. This will not work. Please specify the required concrete anchor to use to transfer the design loads. Sheet 6 Second Floor 9. Please provide a detail at the interface between the existing structure and the new additions. It is not clear how the lateral diaphragm forces will be transferred. Please modify accordingly. Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874- 0562 between 8:00 a.m. and 5:00 p.m. By: Hoyt Jeter, P.E. President