May 5, 2008
Marie Harrison, Permit Coordinator, for
Ann Bullis, Assistant Building Official
City of Edmonds
Building Division
RE: Plan Check # 2007-1215
Axis Physical Therapy
2100976 th Avenue West
Dear Ms. Bullis:
MAY - 6 2008
NT
L'kTy Or-
Following are our responses to your faxed Ietter of May 5, 2008. Thank you for the quick turn-
around of comments. Throughout the process of this review, the numbering of the comments have
changed slightly from review to review. We're following the latest numbers in our explanations
below.
Reduced -size Site Plan copy is attached.
We believe that concrete was poured on top of the original steps in this area. We've added a note for
the Contractor to remove the ramp and patch nosings of the steps.
Alterations and IBC 3409.7:
Based on our review of the existing site and building, the following elements do not meet current
accessibility standards: (asterisk - * - used to denote items being addressed)
Site:
*Number of barrier -free parking spaces;
*South -side door/steps to exterior (may be exempt from correction per 3609.6 Exception #2);
Access to lower -floor of north wing.
Building:
Maneuvering space at interior doors may not provide ANSI Al 17.1 widths at approach side; generally
"structurally infeasible" to change due to bearing walls both sides of hallways; *some doorways being
improved by changing hand/swing direction);
*Door hardware is typically knobs;
*Customer service counter height in Reception;
Toilet room, accessible per earlier code (permitted after ADA requirements), does not have all features
of a new Toilet Room;
*Shower in Therapy Pool and adjacent Treatment Room;
*Upper -floor of north wing has stair -access only, in addition to non -permitted too -steep ramp and
unusual lift;
Locations and heights of electrical receptacles and switches are likely not in compliance with
standards;
Operating hardware for windows not in accessible locations (reach distances/heights).
tel: 425.259.3161 fax: 425.259.5242 www.dykeman.net 1716 West Marine View: Drive Everett, WA 98201-2096
Page 2
c�
We've prepared an estimate of construction costs, blending information from national sources (R.S.
Means estimating books) and local sources ("The Guide"), as well as good -faith estimates of how long
it might take for reasonably competent workers to perform the tasks.
We estimate the total cost of the work (not including Sales Tax) to be $40,667.02 and the cost of the
accessible -route improvements to be $16,644.11, which amounts to 41% of the total. We are not
contractors, so we cannot guarantee that these will be the inial amounts, but it certainly appears that
the 20% threshold will be reached.
4. Information regarding the details of the Pool Equipment Enclosure has been supplemented. Both the
Plan and the Section include aspects of the information you've requested.
Sincerely,
Joel O. Niemi
CC. Chris Sievers
4024
STAW OF WASHINGTON
tel: 425.259.3161 fax: 425.259,5242 www.dykemon.net 1718 West Marine View Drive Everett, WA.98201r2098
Axis Physical Therapy Cost Estimate
Sitework
Description
Quantity Unit
Cost/Unit
IBC 3409
Cost
Other
Cost
Parking Area
Remove (e) striping
15 ea
$200.00
Paint new striping
13 ea
$5.95
$77.35
Install new HC sgns
2 ea
$72.50
$145.00
HC sawcuts
2 ea
$15.00
$30.00
Cross -hatch paint (HC access)
80 sf
$1.90
$152.00
Subtotal
$327.00
$277.35
Barrier -free entry ramp to upper level
Clear/grub planting bed
160 SF
$3.00
$480.00
Remove A1C unit, patch
5 HR
$35.00
$175.00
Deck Construction (RS Means)
824 sf
$6.75
$5,562.00
Guardrail 1 pickets
1 Is
$480.00
$480.00
Handrails each side.
56 If
$18.00
$1,008.00
Create door opening
49 sf
$3.50
$171.50
Painting
700 sf
$0.40
$280.00
Subtotal
$8,156.50
Rear ramp
Sawcut/remove paving
48 sf
$4.18
$200.64
Form 1 place 1 finish ramp
52 sf
$3.50
$182.00
Railing - wall side
14 If
$18.00
$252.00
Railing - other side
20 If
$45.00
$900.00
Subtotal
$1,534.64
Lower Level Ramp Removal
Remove Concrete Ramp, restore steps
1 LS
$250.00
$250.00
Subtotal
$250.00
Total this page:
$10,018.14
$527.35
4024
W/o IMI /1
Axis Physical Therapy Cost Estimate
Exterior 1 Utilities
Description
Quantity Unit
Cost/Unit
IBC 3409 Other
Cost Cost
Hydro -therapy oo quipmen
Enclosure
Remove (e) paving
56 sf
$4.18
$234.08
Form/pour footings & foundation
28 If
$33.15
$928.20
Wall Construction
128 sf
$2.65
$339.20
Roof Construction
45 sf
$5.72
$257.40
Doors
2 ea
$400.00
$800.00
Relocate/install pool equipment
8 hr
$75.00
$600.00
Siding and Paint
128 sf
$6.32
$808.96
Roofing
45 sf
$2.14
$96.30
Subtotal
$4,064.14
Glazing Replacements
Change non -safety glass to safety
35 sf
$10.00
$350.00
Ventilation/opening revisions
2 ea
$500.00
$1,000.00
Subtotal
$1,350.00
Water Service Premises Isolation
Install RPBP device
1 ea
_
$600.00
$600.00
Subtotal
$600.00
Total this page:
$6,014.14
4024
REOE3TER
TE 0F VVis�s'i<vi.TOzCk
Anis Physical Therapy Cost Estimate
Interior
Description
Quantity Unit
CostlUnit
IBC 3409
Cost
Other Cost
Reception Counter
Lower south section
5 hr
$35.00
$175.00
Subtotal
$175.00
Door Revisions
Change Hand/swing
2 ea
$200.00
$400.00
Replace Knobs wlLevers
40 ea
$50.00
$2,000.00
Subtotal
$2,400.00
Construct Staff & Treatment Rooms
Wali Construction
336 SF
$3.00
$1,008.00
Door, frame & hardware
3 EA
$600.00
$1,800.00
Floor finishes
408 SF
$5.00
$2,040.00
Subtotal
$4,848.00
Shower Improvements, Treatment
Room #5
Wall modifications
56 SF
$5.00
$280.00
Shower stall and fittings
1 ea
$1,100.00
$1,100.00
Grab Bars
2 sets
$250.00
$500.00
Subtotal
$1,880.00
Work NOT broken down in detail:
Additional Header framing/supports
$4,000.00
Removal of lift and surrounding walls
$2,500.00
HVAC Adjustments
$500.00
Change door at pool to window
$1,000.00
Emergency Pathway lighting
$1,000.00
Miscellaneous non -complying demo
$500.00
$9,500.00
Totals this page:
$4,455.00
$14,348.00
4024
/Juetw! NfEMI
A 1 c OF VVAZl �ti i i� G i Cly
Axis Physical
Therapy Cost Estimate
Summary
IBC 3409
Cost
Other Cost
Site
$10,018.14
$527.35
Exterior
$0.00
$6,014.14
Interior
$4,455.00
$14,348.00
Subtotals
$14,473.14
$20,889.49
GC OH&P
15%
$2,170.97
$3,133.42 (assumed)
Subtotal
$16,644.11
$24,022.91
Grand Total:
$40,667.02
IBC 3409 Costs as % of Total:
41%
Sales Tax not included
4024