Loading...
20080521133018.pdf� a (cliiieC ttbre D Y K E M A N interior design INSPIRING EVERYDAY SPACES planning graphic design May 5, 2008 Marie Harrison, Permit Coordinator, for Ann Bullis, Assistant Building Official City of Edmonds Building Division RE: Plan Check # 2007-1215 Axis Physical Therapy 2100976 th Avenue West Dear Ms. Bullis: MAY - 6 2008 NT L'kTy Or- Following are our responses to your faxed Ietter of May 5, 2008. Thank you for the quick turn- around of comments. Throughout the process of this review, the numbering of the comments have changed slightly from review to review. We're following the latest numbers in our explanations below. Reduced -size Site Plan copy is attached. We believe that concrete was poured on top of the original steps in this area. We've added a note for the Contractor to remove the ramp and patch nosings of the steps. Alterations and IBC 3409.7: Based on our review of the existing site and building, the following elements do not meet current accessibility standards: (asterisk - * - used to denote items being addressed) Site: *Number of barrier -free parking spaces; *South -side door/steps to exterior (may be exempt from correction per 3609.6 Exception #2); Access to lower -floor of north wing. Building: Maneuvering space at interior doors may not provide ANSI Al 17.1 widths at approach side; generally "structurally infeasible" to change due to bearing walls both sides of hallways; *some doorways being improved by changing hand/swing direction); *Door hardware is typically knobs; *Customer service counter height in Reception; Toilet room, accessible per earlier code (permitted after ADA requirements), does not have all features of a new Toilet Room; *Shower in Therapy Pool and adjacent Treatment Room; *Upper -floor of north wing has stair -access only, in addition to non -permitted too -steep ramp and unusual lift; Locations and heights of electrical receptacles and switches are likely not in compliance with standards; Operating hardware for windows not in accessible locations (reach distances/heights). tel: 425.259.3161 fax: 425.259.5242 www.dykeman.net 1716 West Marine View: Drive Everett, WA 98201-2096 Page 2 c� We've prepared an estimate of construction costs, blending information from national sources (R.S. Means estimating books) and local sources ("The Guide"), as well as good -faith estimates of how long it might take for reasonably competent workers to perform the tasks. We estimate the total cost of the work (not including Sales Tax) to be $40,667.02 and the cost of the accessible -route improvements to be $16,644.11, which amounts to 41% of the total. We are not contractors, so we cannot guarantee that these will be the inial amounts, but it certainly appears that the 20% threshold will be reached. 4. Information regarding the details of the Pool Equipment Enclosure has been supplemented. Both the Plan and the Section include aspects of the information you've requested. Sincerely, Joel O. Niemi CC. Chris Sievers 4024 STAW OF WASHINGTON tel: 425.259.3161 fax: 425.259,5242 www.dykemon.net 1718 West Marine View Drive Everett, WA.98201r2098 Axis Physical Therapy Cost Estimate Sitework Description Quantity Unit Cost/Unit IBC 3409 Cost Other Cost Parking Area Remove (e) striping 15 ea $200.00 Paint new striping 13 ea $5.95 $77.35 Install new HC sgns 2 ea $72.50 $145.00 HC sawcuts 2 ea $15.00 $30.00 Cross -hatch paint (HC access) 80 sf $1.90 $152.00 Subtotal $327.00 $277.35 Barrier -free entry ramp to upper level Clear/grub planting bed 160 SF $3.00 $480.00 Remove A1C unit, patch 5 HR $35.00 $175.00 Deck Construction (RS Means) 824 sf $6.75 $5,562.00 Guardrail 1 pickets 1 Is $480.00 $480.00 Handrails each side. 56 If $18.00 $1,008.00 Create door opening 49 sf $3.50 $171.50 Painting 700 sf $0.40 $280.00 Subtotal $8,156.50 Rear ramp Sawcut/remove paving 48 sf $4.18 $200.64 Form 1 place 1 finish ramp 52 sf $3.50 $182.00 Railing - wall side 14 If $18.00 $252.00 Railing - other side 20 If $45.00 $900.00 Subtotal $1,534.64 Lower Level Ramp Removal Remove Concrete Ramp, restore steps 1 LS $250.00 $250.00 Subtotal $250.00 Total this page: $10,018.14 $527.35 4024 W/o IMI /1 Axis Physical Therapy Cost Estimate Exterior 1 Utilities Description Quantity Unit Cost/Unit IBC 3409 Other Cost Cost Hydro -therapy oo quipmen Enclosure Remove (e) paving 56 sf $4.18 $234.08 Form/pour footings & foundation 28 If $33.15 $928.20 Wall Construction 128 sf $2.65 $339.20 Roof Construction 45 sf $5.72 $257.40 Doors 2 ea $400.00 $800.00 Relocate/install pool equipment 8 hr $75.00 $600.00 Siding and Paint 128 sf $6.32 $808.96 Roofing 45 sf $2.14 $96.30 Subtotal $4,064.14 Glazing Replacements Change non -safety glass to safety 35 sf $10.00 $350.00 Ventilation/opening revisions 2 ea $500.00 $1,000.00 Subtotal $1,350.00 Water Service Premises Isolation Install RPBP device 1 ea _ $600.00 $600.00 Subtotal $600.00 Total this page: $6,014.14 4024 REOE3TER TE 0F VVis�s'i<vi.TOzCk Anis Physical Therapy Cost Estimate Interior Description Quantity Unit CostlUnit IBC 3409 Cost Other Cost Reception Counter Lower south section 5 hr $35.00 $175.00 Subtotal $175.00 Door Revisions Change Hand/swing 2 ea $200.00 $400.00 Replace Knobs wlLevers 40 ea $50.00 $2,000.00 Subtotal $2,400.00 Construct Staff & Treatment Rooms Wali Construction 336 SF $3.00 $1,008.00 Door, frame & hardware 3 EA $600.00 $1,800.00 Floor finishes 408 SF $5.00 $2,040.00 Subtotal $4,848.00 Shower Improvements, Treatment Room #5 Wall modifications 56 SF $5.00 $280.00 Shower stall and fittings 1 ea $1,100.00 $1,100.00 Grab Bars 2 sets $250.00 $500.00 Subtotal $1,880.00 Work NOT broken down in detail: Additional Header framing/supports $4,000.00 Removal of lift and surrounding walls $2,500.00 HVAC Adjustments $500.00 Change door at pool to window $1,000.00 Emergency Pathway lighting $1,000.00 Miscellaneous non -complying demo $500.00 $9,500.00 Totals this page: $4,455.00 $14,348.00 4024 /Juetw! NfEMI A 1 c OF VVAZl �ti i i� G i Cly Axis Physical Therapy Cost Estimate Summary IBC 3409 Cost Other Cost Site $10,018.14 $527.35 Exterior $0.00 $6,014.14 Interior $4,455.00 $14,348.00 Subtotals $14,473.14 $20,889.49 GC OH&P 15% $2,170.97 $3,133.42 (assumed) Subtotal $16,644.11 $24,022.91 Grand Total: $40,667.02 IBC 3409 Costs as % of Total: 41% Sales Tax not included 4024 f N