ASSESSMENT REPORT
A site observation of Corry's Cleaning Service shop was performed on 05/15/08 to
assess damage caused to the building by a vehicle impact. The building is a single
story wood and masonry structure with a wood framed roof.
The vehicle struck the north side of the structure and crashed through a 6-0" wide
store -front window. The vehicle also collided with the north end of the CMU masonry
wall adjacent to the window, damaging about 32" of the east end of that wail. Refer
to the attached photos showing the extent of damage. The beams, columns, and roof
framing members were not damaged.
The existing beam framing was visible above the suspended ceiling as well as a
layer of 2x4 ceiling joists, however the framing above the ceiling joists was not visible
due to solid diagonal sheathing above the 2x4 joists. Based on the beam layout, it is
our understanding that the roof framing is supported on the glu-lam beams and
cantilevers over the store -front window and CMU wall. We also noted that there was
not a structural header over the store -front window. Therefore, it appears that the
damaged window and CMU wall are non-bearing and do not require shoring. We did
not observe cracking or sagging of the roof which would be signs off missing
supports.
Since the damaged store -front window is non-structural and does not have a
structural header, we recommend that the contractor remove and replace this
window and metal frame. The CMU wall is non-bearing, but is part of the lateral
force -resisting system for the building, Refer to the attached SS -1 detail, which
shows an appropriate repair for this wall. Inspection of the CMU wall repairs prior to
grouting is required.
DISCLAIMER
This observation was performed on 05/15/08 and is the professional opinion of CG
Engineering PLLC based on the information available during this assessment or evaluation
This report does not warrant or guarantee that all conditions were discovered at the time of
the observation or evaluation. This report was prepared subject to the standard of care
applicable to professional services at the time the services were provided.
is
Id
Assessment Photographs — Corry's Cleaning Service May 16, 2008
2
Assessment Photographs — Corry's Cleaning Service May 16, 2008
3
C
EX. ROOF
(UNDAMAGED)
EX. WINDOW (DAMAGED)
REMOVE AND REPLACE
EX. CORNER MULLION
(UNDAMAGED)
LLINU I N UI WALL
PARTIAL NORTH ELEVATION
SCALE: 1/4" = 1'-0"
CMU REPAIR
1 REPLACE W/ SIMILAR CMU BLOCK PATTERN IF AVAILABLE.
2. USE 1500 PSI CMU, MEDIUM WT., TYPE I, CONFORMING TO
ASTM C90.
3. USE 2000 PSI MORTAR, TYPE S, CONFORMING TO ASTM C270.
4. USE 2000 PSI GROUT CONFORMING TO ASTM C476.
5. SALVAGE EX. REBAR IF POSSIBLE. PROVIDE ADDITIONAL HORIZ
REINFORCING TO MATCH EXISTING MORTAR JOINT REINF. AND
(2)---#4 VERT. REINF. @ EAST END OF WALL.
6. EPDXY (2)7#4 VERT. BARS INTO STEM WALL @ EAST END OF
WALL. USE SIMPSON SET OR HILTI. HIT HY150 W/ 6"
EMBEDMENT.
7. GROUT SOLID ALL NEW CMU BLOCKS. SPECIAL INSPECTION OF
THE CMU CONSTRUCTION IS REQ'D.
EX. CMU
BLOCK WALL
AND REPLACE
D CMU BLOCK.
r=r—r� 10 TABLE FOR
SPECIFICS.
I EXPIRES: 9/5/2009 ' I
C102
CORRY'S CLEANING DAMAGE ASSESSMENT
DATE 03/20/08
PROJECT NO. 08077.10
DRAWING NO.
3RD AVENUE SOUTH
ENGINEERING
EDMONDS WA 98020
sclkf 1/4" = 1'-0•
zos
����
250 4TH AVE. 5., SUITE 200
TITLE PARTIAL NORTH ELEVATION
CHECKED BY JGG
EDMONDS. WASHINGTON 98020
PHONE (425) 778-8500
APPROVED BY GAG
FAX (42,5) 778-5536
PLOT OATS 5/20/08 FILE NAME: SS—t.dwg