20080528140117.pdf4M ENGINEERING FIELD OBSERVATION Project: Corry's Cleaning Service Car Damage Job No.: 08077.10 Field Rep.: GAGIJGG Report No.: 1 Date of Observation: 05/15/08 Location: 102 3rd Avenue South, Edmonds, WA 98020 Purpose of Site Visit: Structural Observation Client/Owner: Simon Baker General Contractor: ASSESSMENT REPORT A site observation of Corry's Cleaning Service shop was performed on 05/15/08 to assess damage caused to the building by a vehicle impact. The building is a single story wood and masonry structure with a wood framed roof. The vehicle struck the north side of the structure and crashed through a 6-0" wide store -front window. The vehicle also collided with the north end of the CMU masonry wall adjacent to the window, damaging about 32" of the east end of that wail. Refer to the attached photos showing the extent of damage. The beams, columns, and roof framing members were not damaged. The existing beam framing was visible above the suspended ceiling as well as a layer of 2x4 ceiling joists, however the framing above the ceiling joists was not visible due to solid diagonal sheathing above the 2x4 joists. Based on the beam layout, it is our understanding that the roof framing is supported on the glu-lam beams and cantilevers over the store -front window and CMU wall. We also noted that there was not a structural header over the store -front window. Therefore, it appears that the damaged window and CMU wall are non-bearing and do not require shoring. We did not observe cracking or sagging of the roof which would be signs off missing supports. Since the damaged store -front window is non-structural and does not have a structural header, we recommend that the contractor remove and replace this window and metal frame. The CMU wall is non-bearing, but is part of the lateral force -resisting system for the building, Refer to the attached SS -1 detail, which shows an appropriate repair for this wall. Inspection of the CMU wall repairs prior to grouting is required. DISCLAIMER This observation was performed on 05/15/08 and is the professional opinion of CG Engineering PLLC based on the information available during this assessment or evaluation This report does not warrant or guarantee that all conditions were discovered at the time of the observation or evaluation. This report was prepared subject to the standard of care applicable to professional services at the time the services were provided. is Id Assessment Photographs — Corry's Cleaning Service May 16, 2008 2 Assessment Photographs — Corry's Cleaning Service May 16, 2008 3 C EX. ROOF (UNDAMAGED) EX. WINDOW (DAMAGED) REMOVE AND REPLACE EX. CORNER MULLION (UNDAMAGED) LLINU I N UI WALL PARTIAL NORTH ELEVATION SCALE: 1/4" = 1'-0" CMU REPAIR 1 REPLACE W/ SIMILAR CMU BLOCK PATTERN IF AVAILABLE. 2. USE 1500 PSI CMU, MEDIUM WT., TYPE I, CONFORMING TO ASTM C90. 3. USE 2000 PSI MORTAR, TYPE S, CONFORMING TO ASTM C270. 4. USE 2000 PSI GROUT CONFORMING TO ASTM C476. 5. SALVAGE EX. REBAR IF POSSIBLE. PROVIDE ADDITIONAL HORIZ REINFORCING TO MATCH EXISTING MORTAR JOINT REINF. AND (2)---#4 VERT. REINF. @ EAST END OF WALL. 6. EPDXY (2)7#4 VERT. BARS INTO STEM WALL @ EAST END OF WALL. USE SIMPSON SET OR HILTI. HIT HY150 W/ 6" EMBEDMENT. 7. GROUT SOLID ALL NEW CMU BLOCKS. SPECIAL INSPECTION OF THE CMU CONSTRUCTION IS REQ'D. EX. CMU BLOCK WALL AND REPLACE D CMU BLOCK. r=r—r� 10 TABLE FOR SPECIFICS. I EXPIRES: 9/5/2009 ' I C102 CORRY'S CLEANING DAMAGE ASSESSMENT DATE 03/20/08 PROJECT NO. 08077.10 DRAWING NO. 3RD AVENUE SOUTH ENGINEERING EDMONDS WA 98020 sclkf 1/4" = 1'-0• zos ���� 250 4TH AVE. 5., SUITE 200 TITLE PARTIAL NORTH ELEVATION CHECKED BY JGG EDMONDS. WASHINGTON 98020 PHONE (425) 778-8500 APPROVED BY GAG FAX (42,5) 778-5536 PLOT OATS 5/20/08 FILE NAME: SS—t.dwg